0000077278
 

 
UNITED STATES SECURITIES AND EXCHANGE COMMISSION
 
Washington, D. C. 20549

FORM 10-Q/A

Amendment No. 1

(Mark One)[X] QUARTERLY REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE
SECURITIES EXCHANGE ACT OF 1934

For the quarterly period ended June 30, 2006

OR

[ ] TRANSITION REPORT PURSUANT TO SECTION 13 OR 15(d) OF THE
SECURITIES EXCHANGE ACT OF 1934

For the transition period from
 
to
 

Commission
Registrant; State of Incorporation;
I.R.S. Employer
File Number
Address; and Telephone Number
Identification No.
     
333-21011
FIRSTENERGY CORP.
34-1843785
 
(An Ohio Corporation)
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
     
1-2578
OHIO EDISON COMPANY
34-0437786
 
(An Ohio Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
     
     
1-3491
PENNSYLVANIA POWER COMPANY
25-0718810
 
(A Pennsylvania Corporation)
 
 
c/o FirstEnergy Corp.
 
 
76 South Main Street
 
 
Akron, OH 44308
 
 
Telephone (800)736-3402
 
     



Indicate by check mark whether each of the registrants (1) has filed all reports required to be filed by Section 13 or 15(d) of the Securities Exchange Act of 1934 during the preceding 12 months (or for such shorter period that the registrant was required to file such reports), and (2) has been subject to such filing requirements for the past 90 days.

Yes (X) No (  )

Indicate by check mark whether the registrant is a large accelerated filer, an accelerated filer, or a non-accelerated filer. See definition of "accelerated filer and large accelerated filer" in Rule 12b-2 of the Exchange Act.

Large Accelerated Filer (X)
FirstEnergy Corp.
Accelerated Filer ( )
N/A
Non-accelerated Filer (X)
 
Ohio Edison Company, Pennsylvania Power Company

Indicate by check mark whether the registrant is a shell company (as defined in Rule 12b-2 of the Act).

Yes ( ) No (X)

Indicate the number of shares outstanding of each of the issuer's classes of common stock, as of the latest practicable date:

 
OUTSTANDING
CLASS
AS OF AUGUST 7, 2006
FirstEnergy Corp., $.10 par value
329,836,276
Ohio Edison Company, no par value
80
Pennsylvania Power Company, $30 par value
6,290,000

FirstEnergy Corp. is the sole holder of Ohio Edison Company common stock. Ohio Edison Company is the sole holder of Pennsylvania Power Company common stock.

This combined Form 10-Q/A is separately filed by FirstEnergy Corp., Ohio Edison Company and Pennsylvania Power Company. Information contained herein relating to any individual registrant is filed by such registrant on its own behalf. No registrant makes any representation as to information relating to any other registrant, except that information relating to any of the FirstEnergy subsidiary registrants is also attributed to FirstEnergy Corp.



This Form 10-Q/A includes forward-looking statements based on information currently available to management. Such statements are subject to certain risks and uncertainties. These statements typically contain, but are not limited to, the terms "anticipate," "potential," "expect," "believe," "estimate" and similar words. Actual results may differ materially due to the speed and nature of increased competition and deregulation in the electric utility industry, economic or weather conditions affecting future sales and margins, changes in markets for energy services, changing energy and commodity market prices, replacement power costs being higher than anticipated or inadequately hedged, the continued ability of FirstEnergy Corp.’s regulated utilities to collect transition and other charges or to recover increased transmission costs, maintenance costs being higher than anticipated, legislative and regulatory changes (including revised environmental requirements), and the legal and regulatory changes resulting from the implementation of the Energy Policy Act of 2005 (including, but not limited to, the repeal of the Public Utility Holding Company Act of 1935), the uncertainty of the timing and amounts of the capital expenditures needed to, among other things, implement the Air Quality Compliance Plan (including that such amounts could be higher than anticipated) or levels of emission reductions related to the Consent Decree resolving the New Source Review litigation, adverse regulatory or legal decisions and outcomes (including, but not limited to, the revocation of necessary licenses or operating permits, fines or other enforcement actions and remedies) of governmental investigations and oversight, including by the Securities and Exchange Commission, the United States Attorney’s Office, the Nuclear Regulatory Commission and the various state public utility commissions as disclosed in the registrants’ Securities and Exchange Commission filings, generally, and with respect to the Davis-Besse Nuclear Power Station outage and heightened scrutiny at the Perry Nuclear Power Plant in particular, the timing and outcome of various proceedings before the Public Utilities Commission of Ohio (including, but not limited to, the successful resolution of the issues remanded to the PUCO by the Ohio Supreme Court regarding the RSP) and the Pennsylvania Public Utility Commission, including the transition rate plan filings for Met-Ed and Penelec, the continuing availability and operation of generating units, the ability of generating units to continue to operate at, or near full capacity, the inability to accomplish or realize anticipated benefits from strategic goals (including employee workforce initiatives), the anticipated benefits from voluntary pension plan contributions, the ability to improve electric commodity margins and to experience growth in the distribution business, the ability to access the public securities and other capital markets and the cost of such capital, the outcome, cost and other effects of present and potential legal and administrative proceedings and claims related to the August 14, 2003 regional power outages, the successful implementation of the share repurchase program approved by the Board of Directors in June 2006, the risks and other factors discussed from time to time in the registrants’ Securities and Exchange Commission filings, including their annual report on Form 10-K for the year ended December 31, 2005, and other similar factors. A security rating is not a recommendation to buy, sell or hold securities and it may be subject to revision or withdrawal at any time by the credit rating agency. The registrants expressly disclaim any current intention to update any forward-looking statements contained herein as a result of new information, future events, or otherwise.

EXPLANATORY NOTE

        This combined Amendment No. 1 on Form 10-Q/A for the quarter ended June 30, 2006 is being filed by FirstEnergy Corp., Ohio Edison Company and Pennsylvania Power Company to correct a misclassification in their respective Consolidated Statements of Cash Flows for the six months ended June 30, 2006, contained in Part I, Item 1, Consolidated Financial Statements. This correction does not affect the respective registrants’ previously reported consolidated statements of income and comprehensive income for the three months and six ended June 30, 2006 and consolidated balance sheet as of June 30, 2006 contained in the combined Form 10-Q for the quarter ended June 30, 2006, as originally filed on August 7, 2006. Except for Part I, Items 1, 2 and 4 and certain exhibits under Part II, Item 6, no other information included in the Form 10-Q as originally filed is being revised by, or repeated in this amendment.

As discussed in Note 1 to the consolidated financial statements of FirstEnergy Corp., Ohio Edison Company and Pennsylvania Power Company, the registrants have restated their respective consolidated statements of cash flows principally to correct a misclassification of a Pennsylvania Power Company’s cash receipt from the liquidation in the first quarter of 2006 of temporary cash investments (restricted cash related to the 2005 generation asset transfers). The correction of classification of the cash receipt resulted in an approximately $78 million decrease in previously reported cash flows from operating activities, a corresponding increase in previously reported cash flows from investing activities and no effect on the previously reported net increase in cash and cash equivalents in the consolidated statements of cash flows of FirstEnergy, Ohio Edison and Pennsylvania Power.

 Please note that the information contained in this Amendment No. 1, including the consolidated financial statements and notes thereto, does not reflect events occurring after the date of the original Form 10-Q filing, except to the extent described above. Such events include, among others, the events described in our reports under the Securities Exchange Act of 1934, as amended, filed with the SEC since August 7, 2006.








TABLE OF CONTENTS



   
Pages
Glossary of Terms
ii-iv
     
Part I. Financial Information
 
     
Items 1. and 2. - Financial Statements and Management’s Discussion and Analysis of  Financial Condition and Results of Operations.
 
     
 
Notes to Consolidated Financial Statements
1-29
     
FirstEnergy Corp.
 
     
 
Consolidated Statements of Income
30
 
Consolidated Statements of Comprehensive Income
31
 
Consolidated Balance Sheets
32
 
Consolidated Statements of Cash Flows
33
 
Report of Independent Registered Public Accounting Firm
34
 
Management's Discussion and Analysis of Results of Operations and
35-73
 
Financial Condition
 
     
Ohio Edison Company
 
     
 
Consolidated Statements of Income and Comprehensive Income
74
 
Consolidated Balance Sheets
75
 
Consolidated Statements of Cash Flows
76
 
Report of Independent Registered Public Accounting Firm
77
 
Management's Discussion and Analysis of Results of Operations and
78-90
 
Financial Condition
 
     
Pennsylvania Power Company
 
     
 
Consolidated Statements of Income
91
 
Consolidated Balance Sheets
92
 
Consolidated Statements of Cash Flows
93
 
Report of Independent Registered Public Accounting Firm
94
 
Management's Discussion and Analysis of Results of Operations and
 
 
Financial Condition
95-103
     
 Item 4. Controls and Procedures.
 104
     
 Part II. Other Information  
     
  Item 6. Exhibits.
105
 
 


i


GLOSSARY OF TERMS

The following abbreviations and acronyms are used in this report to identify FirstEnergy Corp. and its current and former subsidiaries:

ATSI
American Transmission Systems, Inc., owns and operates transmission facilities
CEI
The Cleveland Electric Illuminating Company, an Ohio electric utility operating subsidiary
Centerior
Centerior Energy Corporation, former parent of CEI and TE, which merged with OE to form FirstEnergy on November 8, 1997
CFC
Centerior Funding Corporation, a wholly owned finance subsidiary of CEI
Companies
OE, CEI, TE, Penn, JCP&L, Met-Ed and Penelec
FENOC
FirstEnergy Nuclear Operating Company, operates nuclear generating facilities
FES
FirstEnergy Solutions Corp., provides energy-related products and services
FESC
FirstEnergy Service Company, provides legal, financial, and other corporate support services
FGCO
FirstEnergy Generation Corp., owns and operates non-nuclear generating facilities
FirstCom
First Communications, LLC, provides local and long-distance telephone service
FirstEnergy
FirstEnergy Corp., a public utility holding company
FSG
FirstEnergy Facilities Services Group, LLC, the parent company of several heating, ventilation,
air conditioning and energy management companies
GPU
GPU, Inc., former parent of JCP&L, Met-Ed and Penelec, which merged with FirstEnergy on
November 7, 2001
JCP&L
Jersey Central Power & Light Company, a New Jersey electric utility operating subsidiary
JCP&L Transition
JCP&L Transition Funding LLC, a Delaware limited liability company and issuer of transition bonds
JCP&L Transition Funding II
JCP&L Transition Funding II LLC, a Delaware limited liability company and issuer of transition bonds
Met-Ed
Metropolitan Edison Company, a Pennsylvania electric utility operating subsidiary
MYR
MYR Group, Inc., a utility infrastructure construction service company
NGC
FirstEnergy Nuclear Generation Corp., owns nuclear generating facilities
OE
Ohio Edison Company, an Ohio electric utility operating subsidiary
OE Companies
OE and Penn
Ohio Companies
CEI, OE and TE
Penelec
Pennsylvania Electric Company, a Pennsylvania electric utility operating subsidiary
Penn
Pennsylvania Power Company, a Pennsylvania electric utility operating subsidiary of OE
PNBV
PNBV Capital Trust, a special purpose entity created by OE in 1996
Shippingport
Shippingport Capital Trust, a special purpose entity created by CEI and TE in 1997
TE
The Toledo Edison Company, an Ohio electric utility operating subsidiary
TEBSA
Termobarranquilla S.A., Empresa de Servicios Publicos
   
The following abbreviations and acronyms are used to identify frequently used terms in this report:
   
ALJ
Administrative Law Judge
AOCL
Accumulated Other Comprehensive Loss
APB
Accounting Principles Board
APB 25
APB Opinion No. 25, "Accounting for Stock Issued to Employees"
APB 29
APB Opinion No. 29, "Accounting for Nonmonetary Transactions"
ARB
Accounting Research Bulletin
ARB 43
ARB No. 43, "Restatement and Revision of Accounting Research Bulletins"
ARO
Asset Retirement Obligation
B&W
Babcock & Wilcox Company
BGS
Basic Generation Service
BTU
British Thermal Unit
CAIDI
Customer Average Interruption Duration Index
CAIR
Clean Air Interstate Rule
CAL
Confirmatory Action Letter
CAMR
Clean Air Mercury Rule
CBP
Competitive Bid Process
CIEP
Commercial Industrial Energy Price
CO2
 
Carbon Dioxide
CTC
Competitive Transition Charge
DCPD
Deferred Compensation Plan for Outside Directors
DIG C20
Derivatives Implementation Group Issue No. C20, “Scope Exceptions: Interpretations of the
Meaning of Not Clearly and Closely Related in Paragraph 10(b) regarding Contracts with a
Price Adjustment Feature”
DOJ
United States Department of Justice


ii


GLOSSARY OF TERMS (Cont'd.)

DRA
Division of the Ratepayer Advocate
ECAR
East Central Area Reliability Coordination Agreement
EDCP
Executive Deferred Compensation Plan
EITF
Emerging Issues Task Force
EITF 04-13
EITF Issue No. 04-13, “Accounting for Purchases and Sales of Inventory with the Same Counterparty"
EPA
Environmental Protection Agency
EPACT
Energy Policy Act of 2005
ERO
Electric Reliability Organization
ESOP
Employee Stock Ownership Plan
FASB
Financial Accounting Standards Board
FERC
Federal Energy Regulatory Commission
FIN
FASB Interpretation
FIN 46(R)
FIN 46 (revised December 2003), "Consolidation of Variable Interest Entities"
FIN 46(R)-6
FIN 46(R)-6, “Determining the Variability to be Considered in Applying FASB interpretation No. 46(R)”
FIN 47
FIN 47, "Accounting for Conditional Asset Retirement Obligations - an interpretation of FASB Statement No. 143"
FIN 48
FIN 48, “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No.109”
FMB
First Mortgage Bonds
FSP
FASB Staff Position
GAAP
Accounting Principles Generally Accepted in the United States
GCAF
Generation Charge Adjustment Factor
GHG
Greenhouse Gases
KWH
Kilowatt-hours
LOC
Letter of Credit
LTIP
Long-Term Incentive Program
MEIUG
Met-Ed Industrial Users Group
MISO
Midwest Independent Transmission System Operator, Inc.
Moody’s
Moody’s Investors Service
MOU
Memorandum of Understanding
MTC
Market Transition Charge
MW
Megawatts
NAAQS
National Ambient Air Quality Standards
NERC
North American Electric Reliability Council
NJBPU
New Jersey Board of Public Utilities
NOAC
Northwest Ohio Aggregation Coalition
NOPR
Notice of Proposed Rulemaking
NOV
Notices of Violation
NOX
 
Nitrogen Oxide
NRC
Nuclear Regulatory Commission
NUG
Non-Utility Generation
NUGC
Non-Utility Generation Charge
OCA
Office of Consumer Advocate
OCC
Office of the Ohio Consumers' Counsel
OCI
Other Comprehensive Income
OPEB
Other Post-Employment Benefits
OSBA
Office of Small Business Advocate
OTS
Office of Trial Staff
PaDEP
Pennsylvania Department of Environmental Protection
PCAOB
Public Company Accounting Oversight Board
PICA
Penelec Industrial Customer Association
PJM
PJM Interconnection L. L. C.
PLR
Provider of Last Resort
PPUC
Pennsylvania Public Utility Commission
PRP
Potentially Responsible Party
PUCO
Public Utilities Commission of Ohio
PUHCA
Public Utility Holding Company Act of 1935
RCP
Rate Certainty Plan
RFP
Request for Proposal
RSP
Rate Stabilization Plan
RTC
Regulatory Transition Charge
RTO            
Regional Transmission Organization
 
 


iii

 
GLOSSARY OF TERMS (Cont'd.)
 
RTOR
Through and Out Rates
S&P
Standard & Poor’s Ratings Service
SAIFI
System Average Interruption Frequency Index
SBC
Societal Benefits Charge
SEC
U.S. Securities and Exchange Commission
SECA
Seams Elimination Cost Adjustment
SFAS
Statement of Financial Accounting Standards
SFAS 123
SFAS No. 123, "Accounting for Stock-Based Compensation"
SFAS 123(R)
SFAS No. 123(R), "Share-Based Payment"
SFAS 133
SFAS No. 133, “Accounting for Derivative Instruments and Hedging Activities”
SFAS 140
SFAS No. 140, “Accounting for Transfers and Servicing of Financial Assets and
Extinguishment of Liabilities”
SFAS 143
SFAS No. 143, "Accounting for Asset Retirement Obligations"
SFAS 144
SFAS No. 144, "Accounting for the Impairment or Disposal of Long-Lived Assets"
SO2
 
Sulfur Dioxide
SRM
Special Reliablity Master
TBC
Transition Bond Charge
TMI-2
Three Mile Island Unit 2
VIE
Variable Interest Entity
VMEP
Vegetation Management Enhancement Project


 
iv

 
 
PART I. FINANCIAL INFORMATION

FIRSTENERGY CORP. AND SUBSIDIARIES
OHIO EDISON COMPANY AND SUBSIDIARIES
PENNSYLVANIA POWER COMPANY AND SUBSIDIARY

NOTES TO CONSOLIDATED FINANCIAL STATEMENTS
(UNAUDITED)


1. - ORGANIZATION AND BASIS OF PRESENTATION

FirstEnergy’s principal business is the holding, directly or indirectly, of all of the outstanding common stock of its eight principal electric utility operating subsidiaries: OE, CEI, TE, Penn, ATSI, JCP&L, Met-Ed and Penelec. Penn is a wholly owned subsidiary of OE. FirstEnergy's consolidated financial statements also include its other principal subsidiaries: FENOC, FES and its subsidiary FGCO, NGC, FESC and FSG.

FirstEnergy and its subsidiaries follow GAAP and comply with the regulations, orders, policies and practices prescribed by the SEC, FERC and, as applicable, PUCO, PPUC and NJBPU. The preparation of financial statements in conformity with GAAP requires management to make periodic estimates and assumptions that affect the reported amounts of assets, liabilities, revenues and expenses and disclosure of contingent assets and liabilities. Actual results could differ from these estimates. The reported results of operations are not indicative of results of operations for any future period.

These statements should be read in conjunction with the financial statements and notes included in the combined Annual Report on Form 10-K for the year ended December 31, 2005 for FirstEnergy and the Companies. The consolidated unaudited financial statements of FirstEnergy and each of the Companies reflect all normal recurring adjustments that, in the opinion of management, are necessary to fairly present results of operations for the interim periods. Certain businesses divested in the first and second quarters of 2005 have been classified as discontinued operations on the Consolidated Statements of Income (see Note 4). As discussed in Note 13, interim period segment reporting in 2005 was reclassified to conform with the current year business segment organizations and operations.

FirstEnergy and its subsidiaries consolidate all majority-owned subsidiaries over which they exercise control and, when applicable, entities for which they have a controlling financial interest. Intercompany transactions and balances are eliminated in consolidation. FirstEnergy consolidates a VIE (see Note 9) when it is determined to be the VIE's primary beneficiary. Investments in nonconsolidated affiliates over which FirstEnergy and its subsidiaries have the ability to exercise significant influence, but not control, (20-50 percent owned companies, joint ventures and partnerships) are accounted for under the equity method. Under the equity method, the interest in the entity is reported as an investment in the Consolidated Balance Sheet and the percentage share of the entity’s earnings is reported in the Consolidated Statement of Income. Certain prior year amounts have been reclassified to conform to the current presentation.

FirstEnergy's and the Companies' independent registered public accounting firm has performed reviews of, and issued reports on, these consolidated interim financial statements in accordance with standards established by the PCAOB. Pursuant to Rule 436(c) under the Securities Act of 1933, their reports of those reviews should not be considered a report within the meaning of Section 7 and 11 of that Act, and the independent registered public accounting firm’s liability under Section 11 does not extend to them.
 
Restatement of the Consolidated Statements of Cash Flows

FirstEnergy, OE and Penn are restating their respective Consolidated Statements of Cash Flows for the six months ended June 30, 2006. This corrects a misclassification of a $78 million cash receipt between cash flows from operating activities and cash flows from investing activities. The cash receipt resulted from the liquidation of cash investments (restricted cash related to the 2005 generation asset transfers) in the first quarter of 2006. Penn is a subsidiary of OE, which is a direct subsidiary of FirstEnergy. The first quarter 2006 cash receipt was previously reported as a source of cash under “Prepayments and other current assets” in cash flows from operating activities and should have been reported as a source of cash under “Cash Investments” in cash flows provided from (used for) investing activities. This correction of a misclassification resulted in a $78 million decrease in previously reported cash flows from operating activities and a corresponding increase in cash flows from (used for) investing activities in the FirstEnergy, OE and Penn consolidated statements of cash flows for the six months ended June 30, 2006. The second quarter of 2006 also included an immaterial misclassification of a non-cash item related to OE’s termination of a capital lease. The termination of the lease arrangement was previously reported as a $12 million use of cash under “Nuclear fuel and lease amortization” in cash flows from operating activities, a $2 million use of cash under “Redemptions and repayments” in cash flows from financing activities and a $14 million source of cash under “Property additions” in cash flows used for investing activities. However, this non-cash transaction should not have been reflected in the consolidated statements of cash flows. This correction of classification resulted in a $12 million increase in cash flows from operating activities, a $2 million increase in cash from financing activities and a $14 million increase in cash used for investing activities in the FirstEnergy and OE consolidated statements of cash flows for the six months ended June 30, 2006. These
 
 
1

 
corrections do not change FirstEnergy’s, OE’s and Penn’s previously reported statements of income and comprehensive income for the three months and six months ended June 30, 2006, their consolidated balance sheets as of June 30, 2006 or the net increase or decrease in cash and cash equivalents in their respective consolidated statements of cash flows.

The effect of the corrections on FirstEnergy’s, OE’s and Penn’s Consolidated Statements of Cash Flows for the six months ended June 30, 2006 are as follows:

FIRSTENERGY
 

     
 Six Months Ended 
 
     
 
 June 30, 2006 
 
       
As Previously
   
As 
 
       
Reported
   
Restated
 
         (In millions)  
                 
CASH FLOWS FROM OPERATING ACTIVITIES:
               
Net income
   
$
525
 
$
525
 
Adjustments to reconcile net income to net cash from operating activities -
               
 Provision fordepreciation
 
   
292
   
292
 
 Amortization of regulatory assets    
421
   
421
 
 Deferral of new regulatory assets    
(226)
   
(226)
 
 Nuclear fuel and lease amortization
 
   
30
   
42
 
 Deferred purchased power and other costs
 
   
(239)
   
(239)
 
Deferred income taxes and investment tax credits, net
 
   
32
   
32
 
 Deferred rents and lease market valuation liability    
(105)
   
(105)
 
 Accrued compensation and retirement benefits    
33
   
33
 
 Commodity derivative transactions, net    
25
   
25
 
 Cash collateral
 
   
(55)
   
(55)
 
  Decrease (Increase) in operating assets -
 
             
 Receivables
 
 
 
83
   
83
 
 Materials and supplies
 
 
 
(71)
   
(71)
 
 Prepayments and other current assets
 
 
 
(81)
   
(159)
 
 Increase (Decrease) in operating liabilities -              
 Accounts payable
 
 
 
(40)
   
(40)
 
 Accrued taxes
   
(45)
   
(45)
 
 Accrued interest
   
-
   
-
 
 Electric service prepayment programs
 
   
(29)
   
(29)
 
  Other
 
   
1
   
1
 
 Net cash provided from operating activities
 
 
 
551
   
485
 
                 
CASH FLOWS FROM FINANCING ACTIVITIES:
               
New Financing -
               
 Long-term debt    
1,053
   
1,053
 
 Short-term borrowings, net    
371
   
371
 
Redemptions and Repayments -
               
 Preferred stock    
(30)
   
(30)
 
 Long-term debt
 
   
(487)
   
(485)
 
Net controlled disbursement activity
     
5
   
5
 
Common stock dividend payments
     
(296)
   
(296)
 
 Net cash provided from financing activities  
 
 
616
   
618
 
                 
CASH FLOWS FROM INVESTING ACTIVITIES:
               
Property additions
     
(725)
   
(739)
 
Proceeds from asset sales
     
59
   
59
 
Proceeds from nuclear decommissioning trust fund sales
     
925
   
925
 
Investments in nuclear decommissioning trust funds
     
(932)
   
(932)
 
Cash investments
     
40
   
118
 
Other
     
(15)
   
(15)
 
Net cash used for investing activities 
 
 
(648)
   
(584)
 
                 
Net increase in cash and cash equivalents
   
$
519
 
$
519
 
                 
 
 
 
 
 
 
2





OE

 
Six Months Ended
 
   
June 30, 2006 
 
 
 
As Previously
 
As
 
   
Reported
 
Restated
 
   
(In thousands) 
 
           
CASH FLOWS FROM OPERATING ACTIVITIES:
         
Net income
 
$
123,039
 
$
123,039
 
Adjustments to reconcile net income to net cash from operating activities-
             
Provision for depreciation
   
35,563
   
35,563
 
Amortization of regulatory assets
   
97,305
   
97,305
 
Deferral of new regulatory assets
   
(78,323
)
 
(78,323
)
Nuclear fuel and lease amortization
   
(11,337
)
 
721
 
Deferred purchased power costs
   
-
   
-
 
Amortization of lease costs
   
(4,334
)
 
(4,334
)
Deferred income taxes and investment tax credits, net
   
(17,351
)
 
(17,351
)
Accrued compensation and retirement benefits
   
930
   
930
 
Decrease (increase) in operating assets-
             
Receivables 
   
66,215
   
66,215
 
Prepayments and other current assets 
   
70,335
   
(7,913
)
Increase (decrease) in operating liabilities-
             
Accounts payable 
   
(45,894
)
 
(45,894
)
Accrued taxes 
   
9,378
   
9,378
 
Accrued interest 
   
(1,183
)
 
(1,183
)
Electric service prepayment programs
   
(16,838
)
 
(16,838
)
Other
   
(8,772
)
 
(8,772
)
Net cash provided from operating activities 
   
218,733
   
152,543
 
               
CASH FLOWS FROM FINANCING ACTIVITIES:
             
New Financing -
             
Long-term debt 
   
599,778
   
599,778
 
Short-term borrowings, net 
   
-
   
-
 
Redemptions and Repayments -
             
Preferred stock 
   
-
   
-
 
Long-term debt 
   
(146,893
)
 
(145,316
)
Short-term borrowings, net 
   
(176,708
)
 
(176,708
)
Dividend Payments -
             
Common stock 
   
(35,000
)
 
(35,000
)
Preferred stock 
   
(1,317
)
 
(1,317
)
 Net cash provided from financing activities
   
239,860
   
241,437
 
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(49,659
)
 
(63,294
)
Proceeds from nuclear decommissioning trust fund sales
   
30,269
   
30,269
 
Investments in nuclear decommissioning trust funds
   
(30,961
)
 
(30,961
)
Loans to associated companies, net
   
112,840
   
112,840
 
Cash investments
   
-
   
78,248 
 
Other
   
23,281
   
23,281 
 
Net cash provided from investing activities 
   
85,770
   
150,383
 
               
Net increase in cash and cash equivalents
 
$
544,363
 
$
544,363
 




3



 
PENN


 
   
Six Months Ended
 
   
June 30, 2006
 
   
As Previously
 
As
 
   
Reported
 
Restated
 
   
(In thousands)
 
CASH FLOWS FROM OPERATING ACTIVITIES:
         
Net income
 
$
3,495
 
$
3,495
 
Adjustments to reconcile net income to net cash from operating activities-
             
Provision for depreciation 
   
4,126
   
4,126
 
Amortization of regulatory assets 
   
3,411
   
3,411
 
Deferred income taxes and investment tax credits, net 
   
(2,383
)
 
(2,383
)
Decrease (increase) in operating assets- 
             
 Receivables
   
41,562
   
41,562
 
 Prepayments and other current assets
   
69,267
   
(8,981
)
Increase (decrease) in operating liabilities- 
             
 Accounts payable
   
(52,779
)
 
(52,779
)
 Accrued taxes
   
(5,602
)
 
(5,602
)
 Accrued interest
   
(807
)
 
(807
)
Other 
   
(3,290
)
 
(3,290
)
 Net cash provided from (used for) operating activities
   
57,000
   
(21,248
)
               
CASH FLOWS FROM FINANCING ACTIVITIES
   
(53,752
)
 
(53,752
)
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(10,216
)
 
(10,216
)
Loans to associated companies
   
7,057
   
7,057
 
Cash investments
   
-
   
78,248
 
Other
   
(75
)
 
(75
)
 Net cash from (used for) investing activities
   
(3,234
)
 
75,014
 
               
Net increase in cash and cash equivalents
 
$
14
 
$
14
 
               
















4




2. - EARNINGS PER SHARE

Basic earnings per share are computed using the weighted average of actual common shares outstanding during the respective period as the denominator. The denominator for diluted earnings per share reflects the weighted average of common shares outstanding plus the potential additional common shares that could result if dilutive securities and other agreements to issue common stock were exercised. The following table reconciles the computation of basic and diluted earnings per share of common stock before discontinued operations:

 
 
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
Reconciliation of Basic and Diluted Earnings per Share
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions, except per share amounts)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Income Before Discontinued Operations
 
$
304
 
$
179
 
$
525
 
$
320
 
Less: Redemption premium on subsidiary preferred stock
   
(3
)
 
-
   
(3
)
 
-
 
Earnings on Common Stock Before Discontinued Operations
 
$
301
 
$
179
 
$
522
 
$
320
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Weighted Average Shares of Common Stock Outstanding:
                         
Denominator for basic earnings per share
 
 
328
 
 
328
 
 
328
 
 
328
 
Assumed exercise of dilutive stock options and awards
 
 
2
 
 
2
 
 
2
 
 
2
 
Denominator for diluted earnings per share
 
 
330
 
 
330
 
 
330
 
 
330
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Earnings Before Discontinued Operations per Common Share:
 
 
 
 
 
 
 
 
 
 
 
 
 
Basic
 
 
$0.92
 
 
$0.54
 
 
$1.59
 
 
$0.98
 
Diluted
 
 
$0.91
 
 
$0.54
 
 
$1.58
 
 
$0.97
 
                           

3. - GOODWILL

FirstEnergy's goodwill primarily relates to its regulated services segment. In the six months ended June 30, 2006, FirstEnergy adjusted goodwill related to the divestiture of a non-core asset (62% interest in MYR), a successful tax claim relating to the former Centerior companies, and an adjustment to the former GPU companies due to the realization of a tax benefit that had been reserved in purchase accounting. Adjustments to goodwill in the second quarter of 2006 were immaterial. The following table reconciles changes to goodwill for the six months ended June 30, 2006.

Goodwill Reconciliation
 
FirstEnergy
 
CEI
 
TE
 
JCP&L
 
Met-Ed
 
Penelec
 
   
(In millions)
 
Balance as of January 1, 2006
 
$
6,010
 
$
1,689
 
$
501
 
$
1,986
 
$
864
 
$
882
 
Non-core assets sale
   
(53
)
                             
Adjustments related to Centerior acquisition
   
(1
)
 
(1
)
                       
Adjustments related to GPU acquisition
   
(16
)
 
-
   
-
   
(8
)
 
(4
)
 
(4
)
Balance as of June 30, 2006
 
$
5,940
 
$
1,688
 
$
501
 
$
1,978
 
$
860
 
$
878
 

4. - DIVESTITURES AND DISCONTINUED OPERATIONS

In March 2006, FirstEnergy sold 60% of its interest in MYR for an after-tax gain of $0.2 million. In June 2006, FirstEnergy sold an additional 1.67% interest. As a result of the March sale, FirstEnergy deconsolidated MYR in the first quarter of 2006 and accounts for its remaining 38.33% interest under the equity method.

In March 2005, FirstEnergy sold 51% of its interest in FirstCom for an after-tax gain of $4 million. FirstEnergy accounts for its remaining 31.85% interest in FirstCom under the equity method.

During the first six months of 2005, FirstEnergy sold three FSG subsidiaries (Cranston, Elliott-Lewis and Spectrum), an MYR subsidiary (Power Piping) and FES' retail natural gas business, resulting in aggregate after-tax gains of $17 million. The remaining FSG subsidiaries continue to be actively marketed and qualify as assets held for sale in accordance with SFAS 144 because FirstEnergy anticipates that the transfer of these remaining FSG assets, with a net carrying value of $48 million as of June 30, 2006, will qualify for recognition as completed sales within one year. As of June 30, 2006, the FSG subsidiaries classified as held for sale did not meet the criteria for discontinued operations. The carrying amounts of FSG's assets and liabilities held for sale are not material and have not been classified as assets held for sale on FirstEnergy's Consolidated Balance Sheets. See Note 13 for FSG's segment financial information.

5

 
        Net results (including the gains on sales of assets discussed above) for Cranston, Elliott-Lewis, Power Piping and FES' retail natural gas business of $(1) million and $18 million for the three months and six months ended June 30, 2005, respectively, are reported as discontinued operations on FirstEnergy's Consolidated Statements of Income. Pre-tax operating results for these entities were $(2) million and $2 million for the three months and six months ended June 30, 2005, respectively. Revenues associated with discontinued operations for the three months and six months ended June 30, 2005 were $11 million and $206 million, respectively. The following table summarizes the sources of income from discontinued operations for the three months and six months ended June 30, 2005:

 
 
Three Months
 
 
Six Months
 
   
(In millions)
 
Discontinued Operations (Net of tax)
 
 
 
 
 
 
Gain on sale:
 
 
 
 
 
 
Natural gas business
 
$
-
 
$
5
 
FSG and MYR subsidiaries
 
 
-
 
 
12
 
Reclassification of operating income (loss)
 
 
(1
)
 
1
 
Total
 
$
(1
)
$
18
 

5. - DERIVATIVE INSTRUMENTS

FirstEnergy is exposed to financial risks resulting from the fluctuation of interest rates and commodity prices, including prices for electricity, natural gas, coal and energy transmission. To manage the volatility relating to these exposures, FirstEnergy uses a variety of non-derivative and derivative instruments, including forward contracts, options, futures contracts and swaps. The derivatives are used principally for hedging purposes. FirstEnergy’s Risk Policy Committee, comprised of members of senior management, provides general management oversight to risk management activities. The Committee is responsible for promoting the effective design and implementation of sound risk management programs and oversees compliance with corporate risk management policies and established risk management practices.

FirstEnergy accounts for derivative instruments on its Consolidated Balance Sheet at their fair value unless they meet the normal purchase and normal sales exception criterion. Derivatives that meet that criterion are accounted for on the accrual basis. The changes in the fair value of derivative instruments that do not meet the normal purchase and sales criterion are recorded in current earnings, in AOCL, or as part of the value of the hedged item, depending on whether or not it is designated as part of a hedge transaction, the nature of the hedge transaction and hedge effectiveness.

FirstEnergy hedges anticipated transactions using cash flow hedges. Such transactions include hedges of anticipated electricity and natural gas purchases and anticipated interest payments associated with future debt issues. The effective portion of such hedges are initially recorded in equity as other comprehensive income or loss and are subsequently included in net income as the underlying hedged commodities are delivered or interest payments are made. Gains and losses from any ineffective portion of cash flow hedges are included directly in earnings.

The net deferred losses of $30 million included in AOCL as of June 30, 2006, for derivative hedging activity, as compared to the December 31, 2005 balance of $78 million of net deferred losses, resulted from a net $35 million decrease related to current hedging activity and a $13 million decrease due to net hedge losses included in earnings during the six months ended June 30, 2006. Approximately $9 million (after tax) of the net deferred losses on derivative instruments in AOCL as of June 30, 2006 is expected to be reclassified to earnings during the next twelve months as hedged transactions occur. The fair value of these derivative instruments fluctuate from period to period based on various market factors.

FirstEnergy has entered into swaps that have been designated as fair value hedges of fixed-rate, long-term debt issues to protect against the risk of changes in the fair value of fixed-rate debt instruments due to lower interest rates. Swap maturities, call options, fixed interest rates received, and interest payment dates match those of the underlying debt obligations. During the first six months of 2006, FirstEnergy unwound swaps with a total notional amount of $350 million for which it paid $1 million in cash. The losses will be recognized in earnings over the remaining maturity of each respective hedged security as increased interest expense. As of June 30, 2006, the aggregate notional value of interest rate swap agreements outstanding was $750 million.

6

 
During 2005 and the first six months of 2006, FirstEnergy entered into several forward starting swap agreements (forward swaps) in order to hedge a portion of the consolidated interest rate risk associated with the anticipated issuances of fixed-rate, long-term debt securities for one or more of its subsidiaries during 2006 - 2008 as outstanding debt matures. These derivatives are treated as cash flow hedges, protecting against the risk of changes in future interest payments resulting from changes in benchmark U.S. Treasury rates between the date of hedge inception and the date of the debt issuance. FirstEnergy revised the tenor and timing of its financing plan during the first six months of 2006. FirstEnergy terminated and revised its forward swaps, ultimately terminating swaps with an aggregate notional value of $600 million as its subsidiaries issued long-term debt in the second quarter. As required by SFAS 133, FirstEnergy assessed the amount of ineffectiveness of the hedges at each termination. FirstEnergy received cash gains of $41 million, of which approximately $6 million ($4 million net of tax) was deemed ineffective and recognized in earnings in the first six months of 2006. The remaining gain deemed effective in the amount of approximately $35 million ($22 million net of tax) was recorded in other comprehensive income and will subsequently be recognized in earnings over the terms of the respective forward swaps. As of June 30, 2006, FirstEnergy had forward swaps with an aggregate notional amount of $550 million and a long-term debt Securities fair value of $29 million.

 
6. - STOCK BASED COMPENSATION

Effective January 1, 2006, FirstEnergy adopted SFAS 123(R), which requires the expensing of stock-based compensation. Under SFAS 123(R), all share-based compensation cost is measured at the grant date based on the fair value of the award, and is recognized as an expense over the employee’s requisite service period. FirstEnergy adopted the modified prospective method, under which compensation expense recognized in the second quarter and six months ended June 30, 2006 included the expense for all share-based payments granted prior to but not yet vested as of January 1, 2006. Results for prior periods were not restated.

Prior to the adoption of SFAS 123(R) on January, 1, 2006, FirstEnergy’s LTIP, EDCP, ESOP, and DCPD stock-based compensation programs were accounted for under the recognition and measurement principles of APB 25 and related interpretations. The LTIP includes four stock-based compensation programs - restricted stock, restricted stock units, stock options and performance shares.

Under APB 25, no compensation expense was reflected in net income for stock options as all options granted under those plans have exercise prices equal to the market value of the underlying common stock on the respective grant dates, resulting in substantially no intrinsic value. The pro forma effects on net income for stock options were instead disclosed in a footnote to the financial statements. Under APB 25 and SFAS 123(R) expense was recorded in the income statement for restricted stock, restricted stock units, performance shares and the EDCP and DCPD programs. No stock options have been granted since the third quarter of 2004. Consequently, the impact of adopting SFAS 123(R) was not material to FirstEnergy's net income and earnings per share in the second quarter and six months ended June 30, 2006. In the year of adoption, all disclosures prescribed by SFAS 123(R) are required to be included in both the quarterly Form 10-Q filings as well as the annual Form 10-K filing. However, due to the immaterial impact of the adoption of SFAS 123(R) on FirstEnergy's financial results, only condensed disclosure has been provided. Reference is made to FirstEnergy’s annual report on Form 10-K for the year ended December 31, 2005 for expanded annual disclosure.

The following table illustrates the effect on net income and earnings per share for the three months and six months ended June 30, 2005, as if FirstEnergy had adopted SFAS 123(R) as of January 1, 2005:

   
Three Months
 
Six Months
 
   
(In millions, except per share amounts)
 
               
Net Income, as reported
 
$
178
 
$
338
 
               
Add back compensation expense
             
reported in net income, net of tax (based on
             
APB 25)*
   
14
   
22
 
               
Deduct compensation expense based
             
upon estimated fair value, net of tax*
   
(17
)
 
(28
)
               
Pro forma net income
 
$
175
 
$
332
 
Earnings Per Share of Common Stock -
             
Basic
             
As Reported
 
$
0.54
 
$
1.03
 
Pro Forma
 
$
0.53
 
$
1.01
 
Diluted
             
As Reported
 
$
0.54
 
$
1.02
 
Pro Forma
 
$
0.53
 
$
1.01
 

* Includes restricted stock, restricted stock units, stock options, performance
shares, ESOP, EDCP and DCPD.

7

 
7. - ASSET RETIREMENT OBLIGATIONS

FirstEnergy has recognized applicable legal obligations under SFAS 143 for nuclear power plant decommissioning, reclamation of a sludge disposal pond and closure of two coal ash disposal sites. In addition, FirstEnergy has recognized conditional retirement obligations (primarily for asbestos remediation) in accordance with FIN 47, which was implemented on December 31, 2005. Had FIN 47 been applied in the six months ended June 30, 2005, the impact on earnings would have been immaterial.
 
      The ARO liability of $1.2 billion as of June 30, 2006 primarily relates to the nuclear decommissioning of the Beaver Valley, Davis-Besse, Perry and TMI-2 nuclear generating facilities. The obligation to decommission these units was developed based on site specific studies performed by an independent engineer. FirstEnergy uses an expected cash flow approach to measure the fair value of the nuclear decommissioning ARO.

      FirstEnergy maintains nuclear decommissioning trust funds that are legally restricted for purposes of settling the nuclear decommissioning ARO. As of June 30, 2006, the fair value of the decommissioning trust assets was $1.8 billion.

The following tables analyze changes to the ARO balances during the three months and six months ended June 30, 2006 and 2005, respectively.

Three Months Ended
 
FirstEnergy
 
OE
 
CEI
 
TE
 
Penn
 
JCP&L
 
Met-Ed
 
Penelec
 
 
 
(In millions)
 
ARO Reconciliation
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance, April 1, 2006
 
$
1,148
 
$
84
 
$
8
 
$
25
 
$
-
 
$
81
 
$
144
 
$
73
 
Liabilities incurred
 
 
-
   
-
   
-
   
-
   
-
   
-
   
-
   
-
 
Liabilities settled
 
 
(6
)
 
-
   
(6
)
 
-
   
-
   
-
   
-
   
-
 
Accretion
 
 
18
   
1
   
-
   
1
   
-
   
1
   
2
   
1
 
Revisions in estimated
 
 
                                           
 
cashflows
 
 
-
   
-
   
-
   
-
   
-
   
-
   
-
   
-
 
Balance, June 30, 2006
 
$
1,160
 
$
85
 
$
2
 
$
26
 
$
-
 
$
82
 
$
146
 
$
74
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance, April 1, 2005
 
$
1,095
 
$
204
 
$
276
 
$
198
 
$
141
 
$
74
 
$
135
 
$
67
 
Liabilities incurred
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Liabilities settled
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Accretion
 
 
18
 
 
4
 
 
5
 
 
3
 
 
2
 
 
1
 
 
2
 
 
1
 
Revisions in estimated
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
cashflows
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Balance, June 30, 2005
 
$
1,113
 
$
208
 
$
281
 
$
201
 
$
143
 
$
75
 
$
137
 
$
68
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 


Six Months Ended
 
FirstEnergy
 
OE
 
CEI
 
TE
 
Penn
 
JCP&L
 
Met-Ed
 
Penelec
 
 
 
(In millions)
 
ARO Reconciliation
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance, January 1, 2006
 
$
1,126
 
$
83
 
$
8
 
$
25
 
$
-
 
$
80
 
$
142
 
$
72
 
Liabilities incurred
 
 
-
   
-
   
-
   
-
   
-
   
-
   
-
   
-
 
Liabilities settled
 
 
(6
)
 
-
   
(6
)
 
-
   
-
   
-
   
-
   
-
 
Accretion
 
 
36
   
2
   
-
   
1
   
-
   
2
   
4
   
2
 
Revisions in estimated
 
 
                                           
 
cashflows
 
 
4
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Balance, June 30, 2006
 
$
1,160
 
$
85
 
$
2
 
$
26
 
$
-
 
$
82
 
$
146
 
$
74
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Balance, January 1, 2005
 
$
1,078
 
$
201
 
$
272
 
$
195
 
$
138
 
$
72
 
$
133
 
$
67
 
Liabilities incurred
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Liabilities settled
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Accretion
 
 
35
 
 
7
 
 
9
 
 
6
 
 
5
 
 
3
 
 
4
 
 
1
 
Revisions in estimated
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
cashflows
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Balance, June 30, 2005
 
$
1,113
 
$
208
 
$
281
 
$
201
 
$
143
 
$
75
 
$
137
 
$
68
 
 
 

 
8

 
8. - PENSION AND OTHER POSTRETIREMENT BENEFITS

FirstEnergy provides noncontributory defined benefit pension plans that cover substantially all of its employees. The trusteed plans provide defined benefits based on years of service and compensation levels. FirstEnergy also provides a minimum amount of noncontributory life insurance to retired employees in addition to optional contributory insurance. Health care benefits, which include certain employee contributions, deductibles and co-payments, are available upon retirement to employees hired prior to January 1, 2005, their dependents and, under certain circumstances, their survivors. FirstEnergy recognizes the expected cost of providing other postretirement benefits to employees, their beneficiaries and covered dependents from the time employees are hired until they become eligible to receive those benefits.
 
The components of FirstEnergy's net periodic pension and other postretirement benefit costs (including amounts capitalized) for the three months and six months ended June 30, 2006 and 2005 consisted of the following:

 
 
Three Months Ended
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Pension Benefits
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
 
Service cost
 
$
21
 
$
19
 
$
41
 
$
38
 
Interest cost
 
 
66
 
 
64
 
 
133
 
 
128
 
Expected return on plan assets
 
 
(99
)
 
(86
)
 
(198
)
 
(173
)
Amortization of prior service cost
 
 
2
 
 
2
 
 
5
 
 
4
 
Recognized net actuarial loss
 
 
15
 
 
9
 
 
29
 
 
18
 
Net periodic cost
 
$
5
 
$
8
 
$
10
 
$
15
 

 
 
Three Months Ended
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Other Postretirement Benefits
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
 
Service cost
 
$
9
 
$
10
 
$
17
 
$
20
 
Interest cost
 
 
26
 
 
27
 
 
52
 
 
55
 
Expected return on plan assets
 
 
(12
)
 
(11
)
 
(23
)
 
(22
)
Amortization of prior service cost
 
 
(19
)
 
(11
)
 
(37
)
 
(22
)
Recognized net actuarial loss
 
 
14
 
 
10
 
 
27
 
 
20
 
Net periodic cost
 
$
18
 
$
25
 
$
36
 
$
51
 

Pension and postretirement benefit obligations are allocated to FirstEnergy’s subsidiaries employing the plan participants. FirstEnergy’s subsidiaries capitalize employee benefits related to construction projects. The net periodic pension costs (credits) and net periodic postretirement benefit costs (including amounts capitalized) recognized by each of the Companies for the three months and six months ended June 30, 2006 and 2005 were as follows:

 
 
Three Months Ended
 
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Pension Benefit Cost (Credit)
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
 
OE
 
$
(1.1
)
$
0.2
 
$
(2.1
)
$
0.4
 
Penn
 
 
(0.4
)
 
(0.2
)
 
(0.8
)
 
(0.4
)
CEI
 
 
1.0
 
 
0.3
 
 
1.9
 
 
0.7
 
TE
 
 
0.2
 
 
0.3
 
 
0.4
 
 
0.6
 
JCP&L
 
 
(1.4
)
 
(0.3
)
 
(2.7
)
 
(0.5
)
Met-Ed
 
 
(1.7
)
 
(1.1
)
 
(3.5
)
 
(2.2
)
Penelec
 
 
(1.3
)
 
(1.3
)
 
(2.7
)
 
(2.7
)
Other FirstEnergy subsidiaries
   
9.9
   
9.6
   
20.0
   
19.1
 
   
$
5.2
 
$
7.5
 
$
10.5
 
$
15.0
 

 
 
Three Months Ended
 
Six Months Ended
 
 
 
June 30,
 
June 30,
 
Other Postretirement Benefit Cost
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
 
OE
 
$
3.4
 
$
5.8
 
$
6.8
 
$
11.5
 
Penn
 
 
0.8
 
 
1.2
 
 
1.6
 
 
2.4
 
CEI
 
 
2.8
 
 
3.8
 
 
5.5
 
 
7.6
 
TE
 
 
2.0
 
 
2.2
 
 
4.0
 
 
4.3
 
JCP&L
 
 
0.6
 
 
1.5
 
 
1.2
 
 
4.2
 
Met-Ed
 
 
0.7
 
 
0.4
 
 
1.5
 
 
0.8
 
Penelec
 
 
1.8
 
 
2.0
 
 
3.6
 
 
4.0
 
Other FirstEnergy subsidiaries
   
6.1
   
8.1
   
12.1
   
16.2
 
   
$
18.2
 
$
25.0
 
$
36.3
 
$
51.0
 


9


9. - VARIABLE INTEREST ENTITIES

FIN 46R addresses the consolidation of VIEs, including special-purpose entities, that are not controlled through voting interests or in which the equity investors do not bear the entity's residual economic risks and rewards. FirstEnergy and its subsidiaries consolidate VIEs when they are determined to be the VIE's primary beneficiary as defined by FIN 46R.

Leases

FirstEnergy’s consolidated financial statements include PNBV and Shippingport, VIEs created in 1996 and 1997, respectively, to refinance debt originally issued in connection with sale and leaseback transactions. PNBV and Shippingport financial data are included in the consolidated financial statements of OE and CEI, respectively.

PNBV was established to purchase a portion of the lease obligation bonds issued in connection with OE’s 1987 sale and leaseback of its interests in the Perry Plant and Beaver Valley Unit 2. OE used debt and available funds to purchase the notes issued by PNBV. Ownership of PNBV includes a 3% equity interest by an unaffiliated third party and a 3% equity interest held by OES Ventures, a wholly owned subsidiary of OE. Shippingport was established to purchase all of the lease obligation bonds issued in connection with CEI’s and TE’s Bruce Mansfield Plant sale and leaseback transaction in 1987. CEI and TE used debt and available funds to purchase the notes issued by Shippingport.

OE, CEI and TE are exposed to losses under the applicable sale-leaseback agreements upon the occurrence of certain contingent events that each company considers unlikely to occur. OE, CEI and TE each have a maximum exposure to loss under these provisions of approximately $1 billion, which represents the net amount of casualty value payments upon the occurrence of specified casualty events that render the applicable plant worthless. Under the applicable sale-leaseback agreements, OE, CEI and TE have net minimum discounted lease payments of $640 million, $98 million and $498 million, respectively, that would not be payable if the casualty value payments are made.

Power Purchase Agreements

In accordance with FIN 46R, FirstEnergy evaluated its power purchase agreements and determined that certain NUG entities may be VIEs to the extent they own a plant that sells substantially all of its output to the Companies and the contract price for power is correlated with the plant’s variable costs of production. FirstEnergy, through its subsidiaries JCP&L, Met-Ed and Penelec, maintains approximately 30 long-term power purchase agreements with NUG entities. The agreements were entered into pursuant to the Public Utility Regulatory Policies Act of 1978. FirstEnergy was not involved in the creation of, and has no equity or debt invested in, these entities.

FirstEnergy has determined that for all but eight of these entities, neither JCP&L, Met-Ed nor Penelec have variable interests in the entities or the entities are governmental or not-for-profit organizations not within the scope of FIN 46R. JCP&L, Met-Ed or Penelec may hold variable interests in the remaining eight entities, which sell their output at variable prices that correlate to some extent with the operating costs of the plants. As required by FIN 46R, FirstEnergy periodically requests from these eight entities the information necessary to determine whether they are VIEs or whether JCP&L, Met-Ed or Penelec is the primary beneficiary. FirstEnergy has been unable to obtain the requested information, which in most cases was deemed by the requested entity to be proprietary. As such, FirstEnergy applied the scope exception that exempts enterprises unable to obtain the necessary information to evaluate entities under FIN 46R.

Since FirstEnergy has no equity or debt interests in the NUG entities, its maximum exposure to loss relates primarily to the above-market costs it incurs for power. FirstEnergy expects any above-market costs it incurs to be recovered from customers. As of June 30, 2006, the net above-market loss liability projected for these eight NUG agreements was $74 million. Purchased power costs from these entities during the three months and six months ended June 30, 2006 and 2005 are shown in the following table:

   
Three Months Ended
 
Six Months Ended
 
 
 
June 30,
 
June 30,
 
 
 
2006
 
2005
 
2006
 
2005
 
 
 
(In millions)
JCP&L
 
$
19
 
$
21
 
$
34
 
$
42
 
Met-Ed
 
 
16
 
 
14
 
 
33
 
 
30
 
Penelec
 
 
7
 
 
7
 
 
14
 
 
14
 
Total
 
$
42
 
$
42
 
$
81
 
$
86
 


10



Securitized Transition Bonds

The consolidated financial statements of FirstEnergy and JCP&L include the results of JCP&L Transition, a wholly owned limited liability company of JCP&L. In June 2002, JCP&L Transition sold $320 million of transition bonds to securitize the recovery of JCP&L's bondable stranded costs associated with the previously divested Oyster Creek Nuclear Generating Station.

JCP&L did not purchase and does not own any of the transition bonds, which are included as long-term debt on FirstEnergy's and JCP&L's Consolidated Balance Sheets. The transition bonds are obligations of JCP&L Transition only and are collateralized solely by the equity and assets of JCP&L Transition, which consist primarily of bondable transition property. The bondable transition property is solely the property of JCP&L Transition.

Bondable transition property represents the irrevocable right under New Jersey law of a utility company to charge, collect and receive from its customers, through a non-bypassable TBC, the principal amount and interest on the transition bonds and other fees and expenses associated with their issuance. JCP&L sold the bondable transition property to JCP&L Transition and, as servicer, manages and administers the bondable transition property, including the billing, collection and remittance of the TBC, pursuant to a servicing agreement with JCP&L Transition. JCP&L is entitled to a quarterly servicing fee of $100,000 that is payable from TBC collections.

10. - COMMITMENTS, GUARANTEES AND CONTINGENCIES

(A)  GUARANTEES AND OTHER ASSURANCES

As part of normal business activities, FirstEnergy enters into various agreements on behalf of its subsidiaries to provide financial or performance assurances to third parties. These agreements include contract guarantees, surety bonds and LOCs. As of June 30, 2006, outstanding guarantees and other assurances totaled approximately $3.5 billion consisting of contract guarantees ($1.9 billion), surety bonds ($0.1 billion) and LOCs ($1.5 billion).

FirstEnergy guarantees energy and energy-related payments of its subsidiaries involved in energy commodity activities principally to facilitate normal physical transactions involving electricity, gas, emission allowances and coal. FirstEnergy also provides guarantees to various providers of subsidiary financing principally for the acquisition of property, plant and equipment. These agreements legally obligate FirstEnergy to fulfill the obligations of those subsidiaries directly involved in energy and energy-related transactions or financing where the law might otherwise limit the counterparties' claims. If demands of a counterparty were to exceed the ability of a subsidiary to satisfy existing obligations, FirstEnergy's guarantee enables the counterparty's legal claim to be satisfied by other FirstEnergy assets. The likelihood is remote that such parental guarantees of $0.8 billion (included in the $1.9 billion discussed above) as of June 30, 2006 would increase amounts otherwise payable by FirstEnergy to meet its obligations incurred in connection with financings and ongoing energy and energy-related activities.

While these types of guarantees are normally parental commitments for the future payment of subsidiary obligations, subsequent to the occurrence of a credit rating-downgrade or “material adverse event” the immediate posting of cash collateral or provision of an LOC may be required of the subsidiary. As of June 30, 2006, FirstEnergy's maximum exposure under these collateral provisions was $501 million.

Most of FirstEnergy's surety bonds are backed by various indemnities common within the insurance industry. Surety bonds and related FirstEnergy guarantees of $146 million provide additional assurance to outside parties that contractual and statutory obligations will be met in a number of areas including construction jobs, environmental commitments and various retail transactions.

The Companies, with the exception of TE and JCP&L, each have a wholly owned subsidiary whose borrowings are secured by customer accounts receivable purchased from its respective parent company. The CEI subsidiary's borrowings are also secured by customer accounts receivable purchased from TE. Each subsidiary company has its own receivables financing arrangement and, as a separate legal entity with separate creditors, would have to satisfy its obligations to creditors before any of its remaining assets could be available to its parent company.
       
Borrowing
 
Subsidiary Company
 
Parent Company
 
Capacity
 
 
 
 
 
(In millions)
 
OES Capital, Incorporated
 
 
OE
 
$
170
 
Centerior Funding Corp.
 
 
CEI
 
 
200
 
Penn Power Funding LLC
 
 
Penn
 
 
25
 
Met-Ed Funding LLC
 
 
Met-Ed
 
 
80
 
Penelec Funding LLC
   
Penelec
   
75
 
         
$
550
 
 
 
11

 
        FirstEnergy has also guaranteed the obligations of the operators of the TEBSA project up to a maximum of $6 million (subject to escalation) under the project's operations and maintenance agreement. In connection with the sale of TEBSA in January 2004, the purchaser indemnified FirstEnergy against any loss under this guarantee. FirstEnergy has also provided an LOC ($36 million as of June 30, 2006), which is renewable and declines yearly based upon the senior outstanding debt of TEBSA.

(B) ENVIRONMENTAL MATTERS

Various federal, state and local authorities regulate FirstEnergy with regard to air and water quality and other environmental matters. The effects of compliance on the Companies with regard to environmental matters could have a material adverse effect on FirstEnergy's earnings and competitive position to the extent that it competes with companies that are not subject to such regulations and therefore do not bear the risk of costs associated with compliance, or failure to comply, with such regulations. Overall, FirstEnergy believes it is in compliance with existing regulations but is unable to predict future changes in regulatory policies and what, if any, the effects of such changes would be. FirstEnergy estimates additional capital expenditures for environmental compliance of approximately $1.8 billion for 2006 through 2010.

FirstEnergy accrues environmental liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in FirstEnergy’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

On December 1, 2005, FirstEnergy issued a comprehensive report to shareholders regarding air emissions regulations and an assessment of its future risks and mitigation efforts.

Clean Air Act Compliance

FirstEnergy is required to meet federally approved SO2 regulations. Violations of such regulations can result in shutdown of the generating unit involved and/or civil or criminal penalties of up to $32,500 for each day the unit is in violation. The EPA has an interim enforcement policy for SO2 regulations in Ohio that allows for compliance based on a 30-day averaging period. FirstEnergy cannot predict what action the EPA may take in the future with respect to the interim enforcement policy.

The EPA Region 5 issued a Finding of Violation and NOV to the Bay Shore Power Plant dated June 15, 2006 alleging violations to various sections of the Clean Air Act. A meeting has been scheduled for August 8, 2006 to discuss the alleged violations with the EPA.

FirstEnergy believes it is complying with SO2 reduction requirements under the Clean Air Act Amendments of 1990 by burning lower-sulfur fuel, generating more electricity from lower-emitting plants, and/or using emission allowances. NOX reductions required by the 1990 Amendments are being achieved through combustion controls and the generation of more electricity at lower-emitting plants. In September 1998, the EPA finalized regulations requiring additional NOX reductions from FirstEnergy's facilities. The EPA's NOX Transport Rule imposes uniform reductions of NOX emissions (an approximate 85% reduction in utility plant NOX emissions from projected 2007 emissions) across a region of nineteen states (including Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based on a conclusion that such NOX emissions are contributing significantly to ozone levels in the eastern United States. FirstEnergy believes its facilities are also complying with the NOX budgets established under State Implementation Plans through combustion controls and post-combustion controls, including Selective Catalytic Reduction and Selective Non-Catalytic Reduction systems, and/or using emission allowances.

National Ambient Air Quality Standards

In July 1997, the EPA promulgated changes in the NAAQS for ozone and fine particulate matter. In March 2005, the EPA finalized the CAIR covering a total of 28 states (including Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based on proposed findings that air emissions from 28 eastern states and the District of Columbia significantly contribute to non-attainment of the NAAQS for fine particles and/or the "8-hour" ozone NAAQS in other states. CAIR provides each affected state until 2006 to develop implementing regulations to achieve additional reductions of NOX and SO2 emissions in two phases (Phase I in 2009 for NOX, 2010 for SO2 and Phase II in 2015 for both NOX and SO2). FirstEnergy's Michigan, Ohio and Pennsylvania fossil-fired generation facilities will be subject to caps on SO2 and NOX emissions, whereas its New Jersey fossil-fired generation facility will be subject to only a cap on NOX emissions. According to the EPA, SO2 emissions will be reduced by 45% (from 2003 levels) by 2010 across the states covered by the rule, with reductions reaching 73% (from 2003 levels) by 2015, capping SO2 emissions in affected states to just 2.5 million tons annually. NOX emissions will be reduced by 53% (from 2003 levels) by 2009 across the states covered by the rule, with reductions reaching 61% (from 2003 levels) by 2015, achieving a regional NOX cap of 1.3 million tons annually. The future cost of compliance with these regulations may be substantial and will depend on how they are ultimately implemented by the states in which FirstEnergy operates affected facilities.

12



Mercury Emissions

In December 2000, the EPA announced it would proceed with the development of regulations regarding hazardous air pollutants from electric power plants, identifying mercury as the hazardous air pollutant of greatest concern. In March 2005, the EPA finalized the CAMR, which provides a cap-and-trade program to reduce mercury emissions from coal-fired power plants in two phases. Initially, mercury emissions will be capped nationally at 38 tons by 2010 (as a "co-benefit" from implementation of SO2 and NOX emission caps under the EPA's CAIR program). Phase II of the mercury cap-and-trade program will cap nationwide mercury emissions from coal-fired power plants at 15 tons per year by 2018. However, the final rules give states substantial discretion in developing rules to implement these programs. In addition, both the CAIR and the CAMR have been challenged in the United States Court of Appeals for the District of Columbia. FirstEnergy's future cost of compliance with these regulations may be substantial and will depend on how they are ultimately implemented by the states in which FirstEnergy operates affected facilities.

The model rules for both CAIR and CAMR contemplate an input-based methodology to allocate allowances to affected facilities. Under this approach, allowances would be allocated based on the amount of fuel consumed by the affected sources. FirstEnergy would prefer an output-based generation-neutral methodology in which allowances are allocated based on megawatts of power produced. Since this approach is based on output, new and non-emitting generating facilities, including renewables and nuclear, would be entitled to their proportionate share of the allowances. Consequently, FirstEnergy would be disadvantaged if these model rules were implemented because FirstEnergy’s substantial reliance on non-emitting (largely nuclear) generation is not recognized under the input-based allocation.

Pennsylvania has proposed a new rule to regulate mercury emissions from coal-fired power plants that does not provide a cap-and-trade approach as in CAMR, but rather follows a command and control approach imposing emission limits on individual sources. If adopted as proposed, Pennsylvania’s mercury regulation would deprive FirstEnergy of mercury emission allowances that were to be allocated to the Mansfield Plant under CAMR and that would otherwise be available for achieving FirstEnergy system-wide compliance. The future cost of compliance with these regulations, if adopted and implemented as proposed, may be substantial.

W. H. Sammis Plant

In 1999 and 2000, the EPA issued NOV or Compliance Orders to nine utilities alleging violations of the Clean Air Act based on operation and maintenance of 44 power plants, including the W. H. Sammis Plant, which was owned at that time by OE and Penn. In addition, the DOJ filed eight civil complaints against various investor-owned utilities, including a complaint against OE and Penn in the U.S. District Court for the Southern District of Ohio. These cases are referred to as New Source Review cases. On March 18, 2005, OE and Penn announced that they had reached a settlement with the EPA, the DOJ and three states (Connecticut, New Jersey, and New York) that resolved all issues related to the W. H. Sammis Plant New Source Review litigation. This settlement agreement was approved by the Court on July 11, 2005, and requires reductions of NOX and SO2 emissions at the W. H. Sammis Plant and other coal-fired plants through the installation of pollution control devices and provides for stipulated penalties for failure to install and operate such pollution controls in accordance with that agreement. Consequently, if FirstEnergy fails to install such pollution control devices, for any reason, including, but not limited to, the failure of any third-party contractor to timely meet its delivery obligations for such devices, FirstEnergy could be exposed to penalties under the settlement agreement. Capital expenditures necessary to meet those requirements are currently estimated to be $1.5 billion (the primary portion of which is expected to be spent in the 2008 to 2011 time period). On August 26, 2005, FGCO entered into an agreement with Bechtel Power Corporation under which Bechtel will engineer, procure, and construct air quality control systems for the reduction of sulfur dioxide emissions. The settlement agreement also requires OE and Penn to spend up to $25 million toward environmentally beneficial projects, which include wind energy purchased power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty of $8.5 million. Results for the first quarter of 2005 included the penalties paid by OE and Penn of $7.8 million and $0.7 million, respectively. OE and Penn also recognized liabilities in the first quarter of 2005 of $9.2 million and $0.8 million, respectively, for probable future cash contributions toward environmentally beneficial projects.

Climate Change

In December 1997, delegates to the United Nations' climate summit in Japan adopted an agreement, the Kyoto Protocol, to address global warming by reducing the amount of man-made GHG emitted by developed countries by 5.2% from 1990 levels between 2008 and 2012. The United States signed the Kyoto Protocol in 1998 but it failed to receive the two-thirds vote required for ratification by the United States Senate. However, the Bush administration has committed the United States to a voluntary climate change strategy to reduce domestic GHG intensity - the ratio of emissions to economic output - by 18% through 2012. The EPACT established a Committee on Climate Change Technology to coordinate federal climate change activities and promote the development and deployment of GHG reducing technologies.

13


FirstEnergy cannot currently estimate the financial impact of climate change policies, although the potential restrictions on CO2 emissions could require significant capital and other expenditures. The CO2 emissions per KWH of electricity generated by FirstEnergy is lower than many regional competitors due to its diversified generation sources, which include low or non-CO2 emitting gas-fired and nuclear generators.

Clean Water Act

Various water quality regulations, the majority of which are the result of the federal Clean Water Act and its amendments, apply to FirstEnergy's plants. In addition, Ohio, New Jersey and Pennsylvania have water quality standards applicable to FirstEnergy's operations. As provided in the Clean Water Act, authority to grant federal National Pollutant Discharge Elimination System water discharge permits can be assumed by a state. Ohio, New Jersey and Pennsylvania have assumed such authority.

On September 7, 2004, the EPA established new performance standards under Section 316(b) of the Clean Water Act for reducing impacts on fish and shellfish from cooling water intake structures at certain existing large electric generating plants. The regulations call for reductions in impingement mortality, when aquatic organisms are pinned against screens or other parts of a cooling water intake system, and entrainment, which occurs when aquatic species are drawn into a facility's cooling water system. FirstEnergy is conducting comprehensive demonstration studies, due in 2008, to determine the operational measures, equipment or restoration activities, if any, necessary for compliance by its facilities with the performance standards. FirstEnergy is unable to predict the outcome of such studies. Depending on the outcome of such studies, the future cost of compliance with these standards may require material capital expenditures.

Regulation of Hazardous Waste

As a result of the Resource Conservation and Recovery Act of 1976, as amended, and the Toxic Substances Control Act of 1976, federal and state hazardous waste regulations have been promulgated. Certain fossil-fuel combustion waste products, such as coal ash, were exempted from hazardous waste disposal requirements pending the EPA's evaluation of the need for future regulation. The EPA subsequently determined that regulation of coal ash as a hazardous waste is unnecessary. In April 2000, the EPA announced that it will develop national standards regulating disposal of coal ash under its authority to regulate nonhazardous waste.

The Companies have been named as PRPs at waste disposal sites, which may require cleanup under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all PRPs for a particular site are liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, the Companies' proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. In addition, JCP&L has accrued liabilities for environmental remediation of former manufactured gas plants in New Jersey; those costs are being recovered by JCP&L through a non-bypassable SBC. Total liabilities of approximately $70 million (JCP&L - $55 million, CEI - $2 million, and other subsidiaries- $13 million) have been accrued through June 30, 2006.

(C) OTHER LEGAL PROCEEDINGS

Power Outages and Related Litigation

In July 1999, the Mid-Atlantic States experienced a severe heat wave, which resulted in power outages throughout the service territories of many electric utilities, including JCP&L's territory. In an investigation into the causes of the outages and the reliability of the transmission and distribution systems of all four of New Jersey’s electric utilities, the NJBPU concluded that there was not a prima facie case demonstrating that, overall, JCP&L provided unsafe, inadequate or improper service to its customers. Two class action lawsuits (subsequently consolidated into a single proceeding) were filed in New Jersey Superior Court in July 1999 against JCP&L, GPU and other GPU companies, seeking compensatory and punitive damages arising from the July 1999 service interruptions in the JCP&L territory.

In August 2002, the trial court granted partial summary judgment to JCP&L and dismissed the plaintiffs' claims for consumer fraud, common law fraud, negligent misrepresentation, and strict product liability. In November 2003, the trial court granted JCP&L's motion to decertify the class and denied plaintiffs' motion to permit into evidence their class-wide damage model indicating damages in excess of $50 million. These class decertification and damage rulings were appealed to the Appellate Division. The Appellate Division issued a decision on July 8, 2004, affirming the decertification of the originally certified class, but remanding for certification of a class limited to those customers directly impacted by the outages of JCP&L transformers in Red Bank, New Jersey. On September 8, 2004, the New Jersey Supreme Court denied the motions filed by plaintiffs and JCP&L for leave to appeal the decision of the Appellate Division. In December 2005, JCP&L argued its motion for summary judgment before the New Jersey Superior Court on its renewed motion to decertify the class and on remaining plaintiffs' negligence and breach of contract claims. These motions remain pending. FirstEnergy is unable to predict the outcome of these matters and no liability has been accrued as of June 30, 2006.

14


On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

FirstEnergy companies also are defending six separate complaint cases before the PUCO relating to the August 14, 2003 power outage. Two cases were originally filed in Ohio State courts but were subsequently dismissed for lack of subject matter jurisdiction and further appeals were unsuccessful. In these cases the individual complainants—three in one case and four in the other—sought to represent others as part of a class action. The PUCO dismissed the class allegations, stating that its rules of practice do not provide for class action complaints. Three other pending PUCO complaint cases were filed by various insurance carriers either in their own name as subrogees or in the name of their insured. In each of these three cases, the carrier seeks reimbursement from various FirstEnergy companies (and, in one case, from PJM, MISO and American Electric Power Company, Inc., as well) for claims paid to insureds for damages allegedly arising as a result of the loss of power on August 14, 2003. The listed insureds in these cases, in many instances, are not customers of any FirstEnergy company. The sixth case involves the claim of a non-customer seeking reimbursement for losses incurred when its store was burglarized on August 14, 2003. FirstEnergy filed a Motion to Dismiss on June 13, 2006. It is currently expected that this case will be summarily dismissed, although the Motion is still pending. On March 7, 2006, the PUCO issued a ruling applicable to all pending cases. Among its various rulings, the PUCO consolidated all of the pending outage cases for hearing; limited the litigation to service-related claims by customers of the Ohio operating companies; dismissed FirstEnergy as a defendant; ruled that the U.S.-Canada Power System Outage Task Force Report was not admissible into evidence; and gave the plaintiffs additional time to amend their complaints to otherwise comply with the PUCO’s underlying order. Also, most complainants, along with the FirstEnergy companies, filed applications for rehearing with the PUCO over various rulings contained in the March 7, 2006 order. On April 26, 2006, the PUCO granted rehearing to allow the insurance company claimants, as insurers, to prosecute their claims in their name so long as they also identify the underlying insured entities and the Ohio utilities that provide their service. The PUCO denied all other motions for rehearing. The plaintiffs in each case have since filed an amended complaint and the named FirstEnergy companies have answered and also have filed a motion to dismiss each action. These motions are pending. Additionally, on June 23, 2006, one of the insurance carrier complainants filed an appeal with the Ohio Supreme Court over the PUCO’s denial of motion for rehearing on the issue of the admissibility of the Task Force Report and the dismissal of FirstEnergy Corp. as a respondent. Briefing is expected to be completed on this appeal by mid-September. It is unknown when the Supreme Court will rule on the appeal. No estimate of potential liability is available for any of these cases.

In addition to the above proceedings, FirstEnergy was named in a complaint filed in Michigan State Court by an individual who is not a customer of any FirstEnergy company. FirstEnergy's motion to dismiss the matter was denied on June 2, 2006. FirstEnergy has since filed an appeal, which is pending. A responsive pleading to this matter has been filed. Also, the complaint has been amended to include an additional party. No estimate of potential liability has been undertaken in this matter.

15


FirstEnergy was also named, along with several other entities, in a complaint in New Jersey State Court. The allegations against FirstEnergy were based, in part, on an alleged failure to protect the citizens of Jersey City from an electrical power outage. None of FirstEnergy’s subsidiaries serve customers in Jersey City. A responsive pleading has been filed. On April 28, 2006, the Court granted FirstEnergy's motion to dismiss. The plaintiff has not appealed.

FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Nuclear Plant Matters

On January 20, 2006, FENOC announced that it had entered into a deferred prosecution agreement with the U.S. Attorney’s Office for the Northern District of Ohio and the Environmental Crimes Section of the Environment and Natural Resources Division of the DOJ related to FENOC’s communications with the NRC during the fall of 2001 in connection with the reactor head issue at the Davis-Besse Nuclear Power Station. Under the agreement, which expires on December 31, 2006, the United States acknowledged FENOC’s extensive corrective actions at Davis-Besse, FENOC’s cooperation during investigations by the DOJ and the NRC, FENOC’s pledge of continued cooperation in any related criminal and administrative investigations and proceedings, FENOC’s acknowledgement of responsibility for the behavior of its employees, and its agreement to pay a monetary penalty. The DOJ will refrain from seeking an indictment or otherwise initiating criminal prosecution of FENOC for all conduct related to the statement of facts attached to the deferred prosecution agreement, as long as FENOC remains in compliance with the agreement, which FENOC fully intends to do. FENOC paid a monetary penalty of $28 million (not deductible for income tax purposes) which reduced FirstEnergy's earnings by $0.09 per common share in the fourth quarter of 2005.

On April 21, 2005, the NRC issued a NOV and proposed a $5.45 million civil penalty related to the degradation of the Davis-Besse reactor vessel head issue discussed above. FirstEnergy accrued $2 million for a potential fine prior to 2005 and accrued the remaining liability for the proposed fine during the first quarter of 2005. On September 14, 2005, FENOC filed its response to the NOV with the NRC. FENOC accepted full responsibility for the past failure to properly implement its boric acid corrosion control and corrective action programs. The NRC NOV indicated that the violations do not represent current licensee performance. FirstEnergy paid the penalty in the third quarter of 2005. On January 23, 2006, FENOC supplemented its response to the NRC's NOV on the Davis-Besse head degradation to reflect the deferred prosecution agreement that FENOC had reached with the DOJ.

On August 12, 2004, the NRC notified FENOC that it would increase its regulatory oversight of the Perry Nuclear Power Plant as a result of problems with safety system equipment over the preceding two years and the licensee's failure to take prompt and corrective action. FENOC operates the Perry Nuclear Power Plant.

On April 4, 2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry Nuclear Power Plant as identified in the NRC's annual assessment letter to FENOC. Similar public meetings are held with all nuclear power plant licensees following issuance by the NRC of their annual assessments. According to the NRC, overall the Perry Nuclear Power Plant operated "in a manner that preserved public health and safety" even though it remained under heightened NRC oversight. During the public meeting and in the annual assessment, the NRC indicated that additional inspections will continue and that the plant must improve performance to be removed from the Multiple/Repetitive Degraded Cornerstone Column of the Action Matrix.

On September 28, 2005, the NRC sent a CAL to FENOC describing commitments that FENOC had made to improve the performance at the Perry Plant and stated that the CAL would remain open until substantial improvement was demonstrated. The CAL was anticipated as part of the NRC's Reactor Oversight Process. In the NRC's 2005 annual assessment letter dated March 2, 2006 and associated meetings to discuss the performance of Perry on March 14, 2006, the NRC again stated that the Perry Plant continued to operate in a manner that "preserved public health and safety." However, the NRC also stated that increased levels of regulatory oversight would continue until sustained improvement in the performance of the facility was realized. If performance does not improve, the NRC has a range of options under the Reactor Oversight Process, from increased oversight to possible impact to the plant’s operating authority. Although FirstEnergy is unable to predict the impact of the ultimate disposition of this matter, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

As of December 16, 2005, NGC acquired ownership of the nuclear generation assets transferred from OE, CEI, TE and Penn with the exception of leasehold interests of OE and TE in certain of the nuclear plants that are subject to sale and leaseback arrangements with non-affiliates.

16


Other Legal Matters

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy's normal business operations pending against FirstEnergy and its subsidiaries. The other potentially material items not otherwise discussed above are described below.

On October 20, 2004, FirstEnergy was notified by the SEC that the previously disclosed informal inquiry initiated by the SEC's Division of Enforcement in September 2003 relating to the restatements in August 2003 of previously reported results by FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have become the subject of a formal order of investigation. The SEC's formal order of investigation also encompasses issues raised during the SEC's examination of FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with this notification, FirstEnergy received a subpoena asking for background documents and documents related to the restatements and Davis-Besse issues. On December 30, 2004, FirstEnergy received a subpoena asking for documents relating to issues raised during the SEC's PUHCA examination. On August 24, 2005, additional information was requested regarding Davis-Besse-related disclosures, which has been provided. FirstEnergy has cooperated fully with the informal inquiry and continues to do so with the formal investigation.

On August 22, 2005, a class action complaint was filed against OE in Jefferson County, Ohio Common Pleas Court, seeking compensatory and punitive damages to be determined at trial based on claims of negligence and eight other tort counts alleging damages from W.H. Sammis Plant air emissions. The two named plaintiffs are also seeking injunctive relief to eliminate harmful emissions and repair property damage and the institution of a medical monitoring program for class members.

JCP&L's bargaining unit employees filed a grievance challenging JCP&L's 2002 call-out procedure that required bargaining unit employees to respond to emergency power outages. On May 20, 2004, an arbitration panel concluded that the call-out procedure violated the parties' collective bargaining agreement. At the conclusion of the June 1, 2005 hearing, the Arbitrator decided not to hear testimony on damages and closed the proceedings. On September 9, 2005, the Arbitrator issued an opinion to award approximately $16 million to the bargaining unit employees. On February 6, 2006, the federal court granted a Union motion to dismiss JCP&L's appeal of the award as premature. JCP&L will file its appeal again in federal district court once the damages associated with this case are identified at an individual employee level. JCP&L recognized a liability for the potential $16 million award in 2005.

The City of Huron filed a complaint against OE with the PUCO challenging the ability of electric distribution utilities to collect transition charges from a customer of a newly-formed municipal electric utility. The complaint was filed on May 28, 2003, and OE timely filed its response on June 30, 2003. In a related filing, the Ohio Companies filed for approval with the PUCO of a tariff that would specifically allow the collection of transition charges from customers of municipal electric utilities formed after 1998. Both filings were consolidated for hearing and decision described above. An adverse ruling could negatively affect full recovery of transition charges by the utility. Hearings on the matter were held in August 2005. Initial briefs from all parties were filed on September 22, 2005 and reply briefs were filed on October 14, 2005. On May 10, 2006, the PUCO issued its Opinion and Order dismissing the City’s complaint and approving the related tariffs, thus affirming OE’s entitlement to recovery of its transition charges. The City of Huron filed an application for rehearing of the PUCO’s decision on June 9, 2006 and OE filed a memorandum in opposition to that application on June 19, 2006. The PUCO denied the City’s application for rehearing on June 28, 2006. The City of Huron has 60 days from the denial of rehearing to appeal the PUCO’s decision.

If it were ultimately determined that FirstEnergy or its subsidiaries have legal liability or are otherwise made subject to liability based on the above matters, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

17


11. - REGULATORY MATTERS

RELIABILITY INITIATIVES

In late 2003 and early 2004, a series of letters, reports and recommendations were issued from various entities, including governmental, industry and ad hoc reliability entities (PUCO, FERC, NERC and the U.S. - Canada Power System Outage Task Force) regarding enhancements to regional reliability. In 2004, FirstEnergy completed implementation of all actions and initiatives related to enhancing area reliability, improving voltage and reactive management, operator readiness and training and emergency response preparedness recommended for completion in 2004. On July 14, 2004, NERC independently verified that FirstEnergy had implemented the various initiatives to be completed by June 30 or summer 2004, with minor exceptions noted by FirstEnergy, which exceptions are now essentially complete. FirstEnergy is proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new, or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional, material expenditures.

As a result of outages experienced in JCP&L’s service area in 2002 and 2003, the NJBPU had implemented reviews into JCP&L’s service reliability. In 2004, the NJBPU adopted an MOU that set out specific tasks related to service reliability to be performed by JCP&L and a timetable for completion and endorsed JCP&L’s ongoing actions to implement the MOU. On June 9, 2004, the NJBPU approved a Stipulation that incorporates the final report of an SRM who made recommendations on appropriate courses of action necessary to ensure system-wide reliability. The Stipulation also incorporates the Executive Summary and Recommendation portions of the final report of a focused audit of JCP&L’s Planning and Operations and Maintenance programs and practices (Focused Audit). A final order in the Focused Audit docket was issued by the NJBPU on July 23, 2004. On February 11, 2005, JCP&L met with the DRA to discuss reliability improvements. The SRM completed his work and issued his final report to the NJBPU on June 1, 2006. A meeting was held between JCP&L and the NJBPU on June 29, 2006 to discuss the SRM’s final report. JCP&L filed a comprehensive response to the NJBPU on July 14, 2006. JCP&L continues to file compliance reports reflecting activities associated with the MOU and Stipulation.

The EPACT provides for the creation of an ERO to establish and enforce reliability standards for the bulk power system, subject to FERC review. On February 3, 2006, the FERC adopted a rule establishing certification requirements for the ERO, as well as regional entities envisioned to assume monitoring responsibility for the new reliability standards. The FERC issued an order on rehearing on March 30, 2006, providing certain clarifications and essentially affirming the rule.

The NERC has been preparing the implementation aspects of reorganizing its structure to meet the FERC’s certification requirements for the ERO. The NERC made a filing with the FERC on April 4, 2006 to obtain certification as the ERO and to obtain FERC approval of delegation agreements with regional entities. The new FERC rule referred to above, further provides for reorganizing regional reliability organizations (regional entities) that would replace the current regional councils and for rearranging the relationship with the ERO. The “regional entity” may be delegated authority by the ERO, subject to FERC approval, for enforcing reliability standards adopted by the ERO and approved by the FERC. The ERO filing was noticed on April 7, 2006 and comments and reply comments were filed in May, June and July 2006. On July 20, 2006, the FERC certified NERC as the ERO to implement the provisions of Section 215 of the Federal Power Act. The FERC directed NERC to make a compliance filing within ninety days addressing such issues as the regional delegation agreements.

On April 4, 2006, NERC also submitted a filing with the FERC seeking approval of mandatory reliability standards. These reliability standards are based, with some modifications, on the current NERC Version O reliability standards with some additional standards. The reliability standards filing was noticed by the FERC on April 18, 2006. In that notice, the FERC announced its intent to issue a Notice of Proposed Rulemaking on the proposed reliability standards at a future date. On May 11, 2006, the FERC staff released a preliminary assessment that cited many deficiencies in the proposed reliability standards. The NERC and industry participants filed comments in response to the Staff’s preliminary assessment. The FERC held a technical conference on the proposed reliability standards on July 6, 2006. The chairman has indicated that the FERC intends to act on the proposed reliability standards by issuing a NOPR in September of this year. Interested parties will be given the opportunity to comment on the NOPR. NERC has requested an effective date of January 1, 2007 for the proposed reliability standards.

18


The ECAR, Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability councils have completed the consolidation of these regions into a single new regional reliability organization known as ReliabilityFirst Corporation. ReliabilityFirst began operations as a regional reliability council under NERC on January 1, 2006 and intends to file and obtain certification consistent with the final rule as a “regional entity” under the ERO during 2006. All of FirstEnergy’s facilities are located within the ReliabilityFirst region.

On May 2, 2006, the NERC Board of Trustees adopted eight new cyber security standards that replaced interim standards put in place in the wake of the September 11, 2001 terrorist attacks, and thirteen additional reliability standards. The security standards became effective on June 1, 2006, and the remaining standards will become effective throughout 2006 and 2007. NERC intends to file the standards with the FERC and relevant Canadian authorities for approval.

FirstEnergy believes it is in compliance with all current NERC reliability standards. However, it is expected that the FERC will adopt stricter reliability standards than those contained in the current NERC standards. The financial impact of complying with the new standards cannot be determined at this time. However, the EPACT required that all prudent costs incurred to comply with the new reliability standards be recovered in rates.

OHIO

On October 21, 2003 the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO in an August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to establish generation service rates beginning January 1, 2006, in response to the PUCO’s concerns about price and supply uncertainty following the end of the Ohio Companies' transition plan market development period. In October 2004, the OCC and NOAC filed appeals with the Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in the proceeding as well as the associated entries on rehearing. On September 28, 2005, the Supreme Court of Ohio heard oral arguments on the appeals. On May 3, 2006, the Supreme Court of Ohio issued an opinion affirming the PUCO's order with respect to the approval of the rate stabilization charge, approval of the shopping credits, the granting of interest on shopping credit incentive deferral amounts, and approval of the Ohio Companies’ financial separation plan. It remanded one matter back to the PUCO for further consideration of the issue as to whether the RSP, as adopted by the PUCO, provided for sufficient means for customer participation in the competitive marketplace. On May 12, 2006, the Ohio Companies filed a Motion for Reconsideration with the Supreme Court of Ohio which was denied by the Court on June 21, 2006. The RSP contained a provision that permitted the Ohio Companies to withdraw and terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio, rejected all or part of the RSP. In such event, the Ohio Companies have 30 days from the final order or decision to provide notice of termination. On July 20, 2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding on Remand. In their Request, the Ohio Companies provided notice of termination to those provisions of the RSP subject to termination, subject to being withdrawn, and also set forth a framework for addressing the Supreme Court of Ohio’s findings on customer participation, requesting the PUCO to initiate a proceeding to consider the Ohio Companies’ proposal. If the PUCO approves a resolution to the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio Companies, the Ohio Companies’ termination will be withdrawn and considered to be null and void. Separately, the OCC and NOAC also submitted to the PUCO on July 20, 2006 a conceptual proposal dealing with the issue raised by the Supreme Court of Ohio. On July 26, 2006, the PUCO issued an Entry acknowledging the July 20, 2006 filings of the Ohio Companies and the OCC and NOAC, and giving the Ohio Companies 45 days to file a plan in a new docket to address the Court’s concern.

The Ohio Companies filed an application and stipulation with the PUCO on September 9, 2005 seeking approval of the RCP. On November 4, 2005, the Ohio Companies filed a supplemental stipulation with the PUCO, which constituted an additional component of the RCP filed on September 9, 2005. Major provisions of the RCP include:

 
Maintaining the existing level of base distribution rates through December 31, 2008 for OE and TE, and April 30, 2009 for CEI;
     
 
Deferring and capitalizing for future recovery (over a 25-year period) with carrying charges certain distribution costs to be incurred during the period January 1, 2006 through December 31, 2008, not to exceed $150 million in each of the three years;
     
 
Adjusting the RTC and extended RTC recovery periods and rate levels so that full recovery of authorized costs will occur as of December 31, 2008 for OE and TE and as of December 31, 2010 for CEI;
     
 
Reducing the deferred shopping incentive balances as of January 1, 2006 by up to $75 million for OE, $45 million for TE, and $85 million for CEI by accelerating the application of each respective company's accumulated cost of removal regulatory liability; and

19



 
Recovering increased fuel costs (compared to a 2002 baseline) of up to $75 million, $77 million, and $79 million, in 2006, 2007, and 2008, respectively, from all OE and TE distribution and transmission customers through a fuel recovery mechanism. OE, TE, and CEI may defer and capitalize (for recovery over a 25-year period) increased fuel costs above the amount collected through the fuel recovery mechanism.

On January 4, 2006, the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the RSP to provide customers with more certain rate levels than otherwise available under the RSP during the plan period. On January 10, 2006, the Ohio Companies filed a Motion for Clarification of the PUCO order approving the RCP. The Ohio Companies sought clarity on issues related to distribution deferrals, including requirements of the review process, timing for recognizing certain deferrals and definitions of the types of qualified expenditures. The Ohio Companies also sought confirmation that the list of deferrable distribution expenditures originally included in the revised stipulation fall within the PUCO order definition of qualified expenditures. On January 25, 2006, the PUCO issued an Entry on Rehearing granting in part, and denying in part, the Ohio Companies’ previous requests and clarifying issues referred to above. The PUCO granted the Ohio Companies’ requests to:

 
Recognize fuel and distribution deferrals commencing January 1, 2006;
     
 
Recognize distribution deferrals on a monthly basis prior to review by the PUCO Staff;
     
 
Clarify that the types of distribution expenditures included in the Supplemental Stipulation may be deferred; and
     
 
Clarify that distribution expenditures do not have to be “accelerated” in order to be deferred.

The PUCO approved the Ohio Companies’ methodology for determining distribution deferral amounts, but denied the Motion in that the PUCO Staff must verify the level of distribution expenditures contained in current rates, as opposed to simply accepting the amounts contained in the Ohio Companies’ Motion. On February 3, 2006, several other parties filed applications for rehearing on the PUCO's January 4, 2006 Order. The Ohio Companies responded to the applications for rehearing on February 8, 2006. In an Entry on Rehearing issued by the PUCO on March 1, 2006, all motions for rehearing were denied. Certain of these parties have subsequently filed notices of appeal with the Supreme Court of Ohio alleging various errors made by the PUCO in its order approving the RCP. The Ohio Companies’ Motion to Intervene in the appeals was granted by the Supreme Court on June 8, 2006. The Appellants’ Merit Briefs were filed at the Supreme Court on July 5, 2006. The Appellees include the PUCO and the Ohio Companies. The Appellees’ Merit Briefs are due on August 4, 2006. Appellants’ Reply Briefs will then be due on August 24, 2006.

On December 30, 2004, the Ohio Companies filed with the PUCO two applications related to the recovery of transmission and ancillary service-related costs. The first application sought recovery of these costs beginning January 1, 2006. The Ohio Companies requested that these costs be recovered through a rider that would be effective on January 1, 2006 and adjusted each July 1 thereafter. The parties reached a settlement agreement that was approved by the PUCO on August 31, 2005. The incremental transmission and ancillary service revenues recovered from January 1 through June 30, 2006 were approximately $61 million. That amount included the recovery of a portion of the 2005 deferred MISO expenses as described below. On May 1, 2006, the Ohio Companies filed a modification to the rider to determine revenues ($141 million) from July 2006 through June 2007.

The second application sought authority to defer costs associated with transmission and ancillary service related costs incurred during the period October 1, 2003 through December 31, 2005. On May 18, 2005, the PUCO granted the accounting authority for the Ohio Companies to defer incremental transmission and ancillary service-related charges incurred as a participant in MISO, but only for those costs incurred during the period December 30, 2004 through December 31, 2005. Permission to defer costs incurred prior to December 30, 2004 was denied. The PUCO also authorized the Ohio Companies to accrue carrying charges on the deferred balances. On August 31, 2005, the OCC appealed the PUCO's decision. On January 20, 2006, the OCC sought rehearing of the PUCO’s approval of the recovery of deferred costs through the rider during the period January 1, 2006 through June 30, 2006. The PUCO denied the OCC's application on February 6, 2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate this appeal with the deferral appeals discussed above and to postpone oral arguments in the deferral appeal until after all briefs are filed in this most recent appeal of the rider recovery mechanism. On March 20, 2006, the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of the Ohio Companies' case with a similar case involving Dayton Power & Light Company. Oral arguments were heard on May 10, 2006. The Ohio Companies are unable to predict when a decision may be issued.

20



PENNSYLVANIA

A February 2002 Commonwealth Court of Pennsylvania decision affirmed the June 2001 PPUC decision regarding approval of the FirstEnergy/GPU merger, remanded the issues of quantification and allocation of merger savings to the PPUC and denied Met-Ed and Penelec the rate relief initially approved in the PPUC decision. On October 2, 2003, the PPUC issued an order concluding that the Commonwealth Court reversed the PPUC’s June 2001 order in its entirety. In accordance with the PPUC's direction, Met-Ed and Penelec filed supplements to their tariffs that became effective in October 2003 and that reflected the CTC rates and shopping credits in effect prior to the June 2001 order.

Met-Ed’s and Penelec’s combined portion of total net merger savings during 2001 - 2004 is estimated to be approximately $51 million. A procedural schedule was established by the ALJ on January 17, 2006 and the companies filed initial testimony on March 1, 2006. On May 4, 2006, the PPUC consolidated this proceeding with the April 10, 2006 comprehensive rate filing proceeding discussed below. Met-Ed and Penelec are unable to predict the outcome of this matter.

In an October 16, 2003 order, the PPUC approved September 30, 2004 as the date for Met-Ed's and Penelec's NUG trust fund refunds. The PPUC order also denied their accounting treatment request regarding the CTC rate/shopping credit swap by requiring Met-Ed and Penelec to treat the stipulated CTC rates that were in effect from January 1, 2002 on a retroactive basis. On October 22, 2003, Met-Ed and Penelec filed an Objection with the Commonwealth Court asking that the Court reverse this PPUC finding; a Commonwealth Court judge subsequently denied their Objection on October 27, 2003 without explanation. On October 31, 2003, Met-Ed and Penelec filed an Application for Clarification of the Court order with the Commonwealth Court, a Petition for Review of the PPUC's October 2 and October 16, 2003 Orders, and an Application for Reargument, if the judge, in his clarification order, indicates that Met-Ed's and Penelec's Objection was intended to be denied on the merits. The Reargument Brief before the Commonwealth Court was filed on January 28, 2005. Oral arguments were held on June 8, 2006. On July 19, 2006, the Commonwealth Court issued its decision affirming the PPUC’s prior orders. Although the decision denied the appeal of Met-Ed and Penelec, they had previously accounted for the treatment of costs required by the PPUC’s October 2003 orders.

As of June 30, 2006, Met-Ed's and Penelec's regulatory deferrals pursuant to the 1998 Restructuring Settlement (including the Phase 2 Proceedings) and the FirstEnergy/GPU Merger Settlement Stipulation were $335 million and $57 million, respectively. Penelec's $57 million is subject to the pending resolution of taxable income issues associated with NUG trust fund proceeds. The PPUC is reviewing a January 2006 change in Met-Ed’s and Penelec’s NUG purchase power stranded cost accounting methodology. If the PPUC orders Met-Ed and Penelec to reverse the change in accounting methodology, this would result in a pre-tax loss of $10.3 million for Met-Ed.

On January 12, 2005, Met-Ed and Penelec filed, before the PPUC, a request for deferral of transmission-related costs beginning January 1, 2005. The OCA, OSBA, OTS, MEIUG, PICA, Allegheny Electric Cooperative and Pennsylvania Rural Electric Association all intervened in the case. Met-Ed and Penelec sought to consolidate this proceeding (and modified their request to provide deferral of 2006 transmission-related costs only) with the comprehensive rate filing they made on April 10, 2006 as described below. On May 4, 2006, the PPUC approved the modified request. Accordingly, Met-Ed and Penelec have deferred approximately $46 million and $12 million, respectively, representing transmission costs that were incurred from January 1, 2006 through June 30, 2006. On June 5, 2006, the OCA filed before the Commonwealth Court a petition for review of the PPUC’s approval of the deferral. On July 12, 2006, the Commonwealth Court granted the PPUC’s motion to quash the OCA’s appeal. The ratemaking treatment of the deferrals will be determined in the comprehensive rate filing proceeding discussed further below.

Met-Ed and Penelec purchase a portion of their PLR requirements from FES through a wholesale power sales agreement. Under this agreement, FES retains the supply obligation and the supply profit and loss risk for the portion of power supply requirements not self-supplied by Met-Ed and Penelec under their contracts with NUGs and other unaffiliated suppliers. The FES arrangement reduces Met-Ed's and Penelec's exposure to high wholesale power prices by providing power at a fixed price for their uncommitted PLR energy costs during the term of the agreement with FES. The wholesale power sales agreement with FES could automatically be extended for each successive calendar year unless any party elects to cancel the agreement by November 1 of the preceding year. On November 1, 2005, FES and the other parties thereto amended the agreement to provide FES the right in 2006 to terminate the agreement at any time upon 60 days notice. On April 7, 2006, the parties to the wholesale power sales agreement entered into a Tolling Agreement that arises out of FES’ notice to Met-Ed and Penelec that FES elected to exercise its right to terminate the wholesale power sales agreement effective midnight December 31, 2006, because that agreement is not economically sustainable to FES.

21



In lieu of allowing such termination to become effective as of December 31, 2006, the parties agreed, pursuant to the Tolling Agreement, to amend the wholesale power sales agreement to provide as follows:

1. The termination provisions of the wholesale power sales agreement will be tolled for one year until December 31, 2007, provided that during such tolling period:

a. FES will be permitted to terminate the wholesale power sales agreement at any time with sixty days written notice;
b. Met-Ed and Penelec will procure through arrangements other than the wholesale power sales agreement beginning December 1, 2006 and ending December 31, 2007, approximately 33% of the amounts of capacity and energy necessary to satisfy their PLR obligations for which Committed Resources (i.e., non-utility generation under contract to Met-Ed and Penelec, Met-Ed- and Penelec-owned generating facilities, purchased power contracts and distributed generation) have not been obtained; and
c. FES will not be obligated to supply additional quantities of capacity and energy in the event that a supplier of Committed Resources defaults on its supply agreement.

2. During the tolling period, FES will not act as an agent for Met-Ed or Penelec in procuring the services under 1.(b) above; and

3. The pricing provision of the wholesale power sales agreement shall remain unchanged provided Met-Ed and Penelec comply with the provisions of the Tolling Agreement and any applicable provision of the wholesale power sales agreement.

In the event that FES elects not to terminate the wholesale power sales agreement effective midnight December 31, 2007, similar tolling agreements effective after December 31, 2007 are expected to be considered by FES for subsequent years if Met-Ed and Penelec procure through arrangements other than the wholesale power sales agreement approximately 64%, 83% and 95% of the additional amounts of capacity and energy necessary to satisfy their PLR obligations for 2008, 2009 and 2010, respectively, for which Committed Resources have not been obtained from the market.

The wholesale power sales agreement, as modified by the Tolling Agreement, requires Met-Ed and Penelec to satisfy the portion of their PLR obligations currently supplied by FES from unaffiliated suppliers at prevailing prices, which are likely to be higher than the current price charged by FES under the current agreement and, as a result, Met-Ed’s and Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec were to replace the entire FES supply at current market power prices without corresponding regulatory authorization to increase their generation prices to customers, each company would likely incur a significant increase in operating expenses and experience a material deterioration in credit quality metrics. Under such a scenario, each company's credit profile would no longer be expected to support an investment grade rating for its fixed income securities. There can be no assurance, however, that if FES ultimately determines to terminate, or significantly modify the agreement, timely regulatory relief will be granted by the PPUC pursuant to the April 10, 2006 comprehensive rate filing discussed below, or, to the extent granted, adequate to mitigate such adverse consequences.

Met-Ed and Penelec made a comprehensive rate filing with the PPUC on April 10, 2006 that addresses a number of transmission, distribution and supply issues. If Met-Ed's and Penelec's preferred approach involving accounting deferrals is approved, the filing would increase annual revenues by $216 million and $157 million, respectively. That filing includes, among other things, a request to charge customers for an increasing amount of market priced power procured through a CBP as the amount of supply provided under the existing FES agreement is phased out in accordance with the April 7, 2006 Tolling Agreement described above. Met-Ed and Penelec also requested approval of the January 12, 2005 petition for the deferral of transmission-related costs discussed above, but only for those costs incurred during 2006. In this rate filing, Met-Ed and Penelec also requested recovery of annual transmission and related costs incurred on or after January 1, 2007, plus the amortized portion of 2006 costs over a ten-year period, along with applicable carrying charges, through an adjustable rider similar to that implemented in Ohio. Changes in the recovery of NUG expenses and the recovery of Met-Ed's non-NUG stranded costs are also included in the filing. The filing contemplates a reduction in distribution rates for Met-Ed of $37 million annually and an increase in distribution rates for Penelec of $20 million annually. The PPUC suspended the effective date (June 10, 2006) of these rate changes for seven months after the filing as permitted under Pennsylvania law. If the PPUC adopts the overall positions taken in the intervenors’ testimony as filed, this would have a material adverse effect on the financial statements of FirstEnergy, Met-Ed and Penelec. Hearings are scheduled for late August 2006 and a PPUC decision is expected early in the first quarter of 2007.

22


Under Pennsylvania's electric competition law, Penn is required to secure generation supply for customers who do not choose alternative suppliers for their electricity. On October 11, 2005, Penn filed a plan with the PPUC to secure electricity supply for its customers at set rates following the end of its transition period on December 31, 2006. Penn recommended that the RFP process cover the period January 1, 2007 through May 31, 2008. To the extent that an affiliate of Penn supplies a portion of the PLR load included in the RFP, authorization to make the affiliate sale must be obtained from the FERC. Hearings before the PPUC were held on January 10, 2006 with main briefs filed on January 27, 2006 and reply briefs filed on February 3, 2006. On February 16, 2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with modifications. On April 20, 2006, the PPUC approved the Recommended Decision with additional modifications to use an RFP process to obtain Penn’s power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submissions for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

On May 25, 2006, Penn filed a Petition for Review of the PPUC’s Orders of April 28, 2006 and May 4, 2006, which together decided the issues associated with Penn’s proposed Interim PLR Supply Plan. Penn has asked the Commonwealth Court to review the PPUC’s decision to deny its recovery of certain PLR costs via a reconciliation mechanism and its decision to impose a geographic limitation on the sources of alternative energy credits. On June 7, 2006, the PaDEP filed a Petition for Review appealing the PPUC’s ruling on the method by which alternative energy credits may be acquired and traded. Penn is unable to predict the outcome of this appeal.

NEW JERSEY

JCP&L is permitted to defer for future collection from customers the amounts by which its costs of supplying BGS to non-shopping customers and costs incurred under NUG agreements exceed amounts collected through BGS and NUGC rates and market sales of NUG energy and capacity. As of June 30, 2006, the accumulated deferred cost balance totaled approximately $638 million. New Jersey law allows for securitization of JCP&L's deferred balance upon application by JCP&L and a determination by the NJBPU that the conditions of the New Jersey restructuring legislation are met. On February 14, 2003, JCP&L filed for approval to securitize the July 31, 2003 deferred balance. On June 8, 2006, the NJBPU approved JCP&L’s request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.

On December 2, 2005, JCP&L filed its request for recovery of $165 million of actual above-market NUG costs incurred from August 1, 2003 through October 31, 2005 and forecasted above-market NUG costs for November and December 2005. On February 23, 2006, JCP&L filed updated data reflecting actual amounts through December 31, 2005 of $154 million of costs incurred since July 31, 2003. On March 29, 2006, a pre-hearing conference was held with the presiding ALJ. A schedule for the proceeding was established, including a discovery period and evidentiary hearings scheduled for September 2006.

An NJBPU Decision and Order approving a Phase II Stipulation of Settlement and resolving the Motion for Reconsideration of the Phase I Order was issued on May 31, 2005. The Phase II Settlement includes a performance standard pilot program with potential penalties of up to 0.25% of allowable equity return. The Order requires that JCP&L file quarterly reliability reports (CAIDI and SAIFI information related to the performance pilot program) through December 2006 and updates to reliability related project expenditures until all projects are completed. The last of the quarterly reliability reports was submitted on June 12, 2006. As of June 30, 2006, there were no performance penalties issued by the NJBPU.

In a reaction to the higher closing prices of the 2006 BGS fixed rate auction, the NJBPU, on March 16, 2006, initiated a generic proceeding to evaluate the auction process and potential options for the future. On April 6, 2006, initial comments were submitted. A public meeting was held on April 21, 2006 and a legislative-type hearing was held on April 28, 2006. On June 21, 2006, the NJBPU approved the continued use of a descending block auction for the Fixed Price Residential Class. A final decision as to the procurement method for the Commercial Industrial Energy Price Class is expected in October 2006.

In accordance with an April 28, 2004 NJBPU order, JCP&L filed testimony on June 7, 2004 supporting a continuation of the current level and duration of the funding of TMI-2 decommissioning costs by New Jersey customers without a reduction, termination or capping of the funding. On September 30, 2004, JCP&L filed an updated TMI-2 decommissioning study. This study resulted in an updated total decommissioning cost estimate of $729 million (in 2003 dollars) compared to the estimated $528 million (in 2003 dollars) from the prior 1995 decommissioning study. The DRA filed comments on February 28, 2005 requesting that decommissioning funding be suspended. On March 18, 2005, JCP&L filed a response to those comments. A schedule for further proceedings has not yet been set.

23



On August 1, 2005, the NJBPU established a proceeding to determine whether additional ratepayer protections are required at the state level in light of the repeal of PUHCA pursuant to the EPACT. An NJBPU proposed rulemaking to address the issues was published in the NJ Register on December 19, 2005. The proposal would prevent a holding company that owns a gas or electric public utility from investing more than 25% of the combined assets of its utility and utility-related subsidiaries into businesses unrelated to the utility industry. A public hearing was held on February 7, 2006 and comments were submitted to the NJBPU. The NJBPU Staff issued a draft proposal on March 31, 2006 addressing various issues including access to books and records, ring-fencing, cross subsidization, corporate governance and related matters. With the approval of the NJBPU Staff, the affected utilities jointly submitted an alternative proposal on June 1, 2006. Comments on the alternative proposal were submitted on June 15, 2006. JCP&L is unable to predict the outcome of this proceeding.

On December 21, 2005, the NJBPU initiated a generic proceeding and requested comments in order to formulate an appropriate regulatory treatment for investment tax credits related to generation assets divested by New Jersey’s four electric utility companies. Comments were filed by the utilities and by the DRA. JCP&L was advised by the IRS on April 10, 2006 that the ruling was tentatively adverse. On April 28, 2006, the NJBPU directed JCP&L to withdraw its request for a private letter ruling on this issue, which had been previously filed with the IRS as ordered by the NJBPU. On May 11, 2006, after a JCP&L Motion for Reconsideration was denied by the NJBPU, JCP&L filed to withdraw the request for a private letter ruling. On July 19, 2006, the IRS acknowledged that the JCP&L ruling request was withdrawn.

FERC MATTERS

On November 1, 2004, ATSI filed with the FERC a request to defer approximately $54 million of costs to be incurred from 2004 through 2007 in connection with ATSI’s VMEP, which represents ATSI’s adoption of newly identified industry “best practices” for vegetation management. On March 4, 2005, the FERC approved ATSI’s request to defer the VMEP costs (approximately $33 million has been deferred as of June 30, 2006). On March 28, 2006, ATSI and MISO filed with the FERC a request to modify ATSI’s Attachment O formula rate to include revenue requirements associated with recovery of deferred VMEP costs over a five-year period. The requested effective date to begin recovery was June 1, 2006. Various parties filed comments responsive to the March 28, 2006 submission. The FERC conditionally approved the filing on May 22, 2006, subject to a compliance filing that ATSI made on June 13, 2006. A request for rehearing of the FERC’s May 22, 2006 Order was filed by a party, which ATSI answered. On July 21, 2006, the FERC issued an order stating that it needs more time to consider the matter. In light of that order, there is no time period by which the FERC must act on the pending rehearing request. On July 14, 2006, the FERC accepted ATSI’s June 13, 2006 compliance filing. The estimated annual revenues to ATSI from the VMEP cost recovery is $12 million.

On January 24, 2006, ATSI and MISO filed a request with the FERC to correct ATSI’s Attachment O formula rate to reverse revenue credits associated with termination of revenue streams from transitional rates stemming from FERC’s elimination of RTOR. Revenues formerly collected under these rates were included in, and served to reduce, ATSI’s zonal transmission rate under the Attachment O formula. Absent the requested correction, elimination of these revenue streams would not be fully reflected in ATSI’s formula rate until June 1, 2008. On March 16, 2006, the FERC approved the revenue credit correction without suspension, effective April 1, 2006. One party sought rehearing of the FERC's order. The request for rehearing of this order was denied on June 27, 2006. The FERC accepted MISO’s and ATSI’s revised tariff sheets for filing on June 7, 2006. The estimated annual revenue impact of the correction mechanism is approximately $40 million effective on June 1, 2006.

On November 18, 2004, the FERC issued an order eliminating the RTOR for transmission service between the MISO and PJM regions. The FERC also ordered the MISO, PJM and the transmission owners within MISO and PJM to submit compliance filings containing a SECA mechanism to recover lost RTOR revenues during a 16-month transition period from load serving entities. The FERC issued orders in 2005 setting the SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES continue to be involved in the FERC hearings concerning the calculation and imposition of the SECA charges. The hearing was held in May 2006. Initial briefs were submitted on June 9, 2006, and reply briefs were filed on June 27, 2006. The FERC has ordered the Presiding Judge to issue an initial decision by August 11, 2006.

24



On January 31, 2005, certain PJM transmission owners made three filings with the FERC pursuant to a settlement agreement previously approved by the FERC. JCP&L, Met-Ed and Penelec were parties to that proceeding and joined in two of the filings. In the first filing, the settling transmission owners submitted a filing justifying continuation of their existing rate design within the PJM RTO. In the second filing, the settling transmission owners proposed a revised Schedule 12 to the PJM tariff designed to harmonize the rate treatment of new and existing transmission facilities. Interventions and protests were filed on February 22, 2005. In the third filing, Baltimore Gas and Electric Company and Pepco Holdings, Inc. requested a formula rate for transmission service provided within their respective zones. On May 31, 2005, the FERC issued an order on these cases. First, it set for hearing the existing rate design and indicated that it will issue a final order within six months. American Electric Power Company, Inc. filed in opposition proposing to create a "postage stamp" rate for high voltage transmission facilities across PJM. Second, the FERC approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed formula rate, subject to refund and hearing procedures. On June 30, 2005, the settling PJM transmission owners filed a request for rehearing of the May 31, 2005 order. On March 20, 2006, a settlement was filed with FERC in the formula rate proceeding that generally accepts the companies' formula rate proposal. The FERC issued an order approving this settlement on April 19, 2006. Hearings in the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial Decision was issued by the ALJ. The ALJ adopted the Trial Staff’s position that the cost of all PJM transmission facilities should be recovered through a postage stamp rate. The ALJ recommended an April 1, 2006 effective date for this change in rate design. If the FERC accepts this recommendation, the transmission rate applicable to many load zones in PJM would increase. FirstEnergy believes that significant additional transmission revenues would have to be recovered from the JCP&L, Met-Ed and Penelec transmission zones within PJM. The Companies, as part of the Responsible Pricing Alliance, intend to submit a brief on exceptions within thirty days of the initial decision. Following submission of reply exceptions, the case is expected to be reviewed by the FERC with a decision anticipated in the fourth quarter of 2006.

On November 1, 2005, FES filed two power sales agreements for approval with the FERC. One power sales agreement provided for FES to provide the PLR requirements of the Ohio Companies at a price equal to the retail generation rates approved by the PUCO for a period of three years beginning January 1, 2006. The Ohio Companies will be relieved of their obligation to obtain PLR power requirements from FES if the Ohio CBP results in a lower price for retail customers. A similar power sales agreement between FES and Penn permits Penn to obtain its PLR power requirements from FES at a fixed price equal to the retail generation price during 2006. The PPUC approved Penn's plan with modifications on April 20, 2006 to use an RFP process to obtain its power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submission for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

On December 29, 2005, the FERC issued an order setting the two power sales agreements for hearing. The order criticized the Ohio CBP, and required FES to submit additional evidence in support of the reasonableness of the prices charged in the power sales agreements. A pre-hearing conference was held on January 18, 2006 to determine the hearing schedule in this case. Under the procedural schedule approved in this case, FES expected an initial decision to be issued in late January 2007. However, on July 14, 2006, the Chief Judge granted the joint motion of FES and the Trial Staff to appoint a settlement judge in this proceeding. The procedural schedule has been suspended pending settlement discussions among the parties.

12. - NEW ACCOUNTING STANDARDS AND INTERPRETATIONS

FSP FIN 46(R)-6 - “Determining the Variability to Be Considered in Applying FASB interpretation No. 46(R)”

In April 2006, the FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should determine the variability to be considered in applying FASB interpretation No. 46 (revised December 2003). FirstEnergy adopted FIN 46(R) in the first quarter of 2004, consolidating VIE’s when FirstEnergy or one of its subsidiaries is determined to be the VIE’s primary beneficiary. The variability that is considered in applying interpretation 46(R) affects the determination of (a) whether the entity is a VIE; (b) which interests are variable interests in the entity; and (c) which party, if any, is the primary beneficiary of the VIE. This FSP states that the variability to be considered shall be based on an analysis of the design of the entity, involving two steps:

Step 1:
Analyze the nature of the risks in the entity
Step 2:
Determine the purpose(s) for which the entity was created and determine the variability the entity is designed to create and pass along to its interest holders.

25



After determining the variability to consider, the reporting enterprise can determine which interests are designed to absorb that variability. The guidance in this FSP is applied prospectively to all entities (including newly created entities) with which that enterprise first becomes involved and to all entities previously required to be analyzed under interpretation 46(R) when a reconsideration event has occurred after July 1, 2006. FirstEnergy does not expect this Statement to have a material impact on its financial statements.

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. FirstEnergy is currently evaluating the impact of this Statement.

13. - SEGMENT INFORMATION


FirstEnergy has two reportable segments: regulated services and power supply management services. The aggregate “Other” segments do not individually meet the criteria to be considered a reportable segment. The regulated services segment's operations include the regulated sale of electricity and distribution and transmission services by its eight utility subsidiaries in Ohio, Pennsylvania and New Jersey. The power supply management services segment primarily consists of the subsidiaries (FES, FGCO, NGC and FENOC) that sell electricity in deregulated markets and operate and now own the generation facilities of OE, CEI, TE and Penn resulting from the deregulation of the Companies' electric generation business. “Other” consists of telecommunications services, the recently sold MYR (a construction service company) and retail natural gas operations (see Note 4). The assets and revenues for the other business operations are below the quantifiable threshold for operating segments for separate disclosure as “reportable segments.”

The regulated services segment designs, constructs, operates and maintains FirstEnergy's regulated transmission and distribution systems. Its revenues are primarily derived from electricity delivery and transition cost recovery. Assets of the regulated services segment as of June 30, 2005 included generating units that were leased or whose output had been sold to the power supply management services segment. The regulated services segment’s 2005 internal revenues represented the rental revenues for the generating unit leases which ceased in the fourth quarter of 2005 as a result of the intra-system generation asset transfers (see Note 14).

The power supply management services segment supplies all of the electric power needs of FirstEnergy’s end-use customers through retail and wholesale arrangements, including regulated retail sales to meet the PLR requirements of FirstEnergy's Ohio and Pennsylvania companies and competitive retail sales to customers primarily in Ohio, Pennsylvania, Maryland and Michigan. This business segment owns and operates FirstEnergy's generating facilities and purchases electricity from the wholesale market when needed to meet sales obligations. The segment's net income is primarily derived from all electric generation sales revenues less the related costs of electricity generation, including purchased power and net transmission, congestion and ancillary costs charged by PJM and MISO to deliver energy to retail customers.

Segment reporting for interim periods in 2005 was revised to conform to the current year business segment organization and operations and the reclassification of discontinued operations (see Note 4). Changes in the current year operations reporting reflected in the revised 2005 segment reporting primarily includes the transfer of retail transmission revenues and PJM/MISO transmission revenues and expenses associated with serving electricity load previously included in the regulated services segment to the power supply management services segment. In addition, as a result of the 2005 Ohio tax legislation reducing the effective state income tax rate, the calculated composite income tax rates used in the two reportable segments’ results for 2005 and 2006 have been changed to 40% from the 41% previously reported in their 2005 segment results. The net amounts of the changes in the 2005 reportable segments' income taxes reclassifications have been correspondingly offset in the 2005 "Reconciling Adjustments." FSG is being disclosed as a reportable segment due to its subsidiaries qualifying as held for sale. Interest expense on holding company debt and corporate support services revenues and expenses are included in "Reconciling Adjustments."

26



Segment Financial Information
     
Power
                 
       
Supply
                 
   
Regulated
 
Management
 
Facilities
     
Reconciling
     
Three Months Ended
 
Services
 
Services
 
Services
 
Other
 
Adjustments
 
Consolidated
 
   
(In millions)
 
June 30, 2006
                         
External revenues
 
$
1,045
 
$
1,678
 
$
58
 
$
16
 
$
(11
)
$
2,786
 
Internal revenues
   
-
   
-
   
-
   
-
   
-
   
-
 
Total revenues
   
1,045
   
1,678
   
58
   
16
   
(11
)
 
2,786
 
Depreciation and amortization
   
228
   
(36
)
 
-
   
1
   
5
   
198
 
Investment Income
   
75
   
2
   
-
   
1
   
(47
)
 
31
 
Net interest charges
   
96
   
54
   
1
   
1
   
21
   
173
 
Income taxes
   
155
   
90
   
1
   
2
   
(31
)
 
217
 
Net income
   
229
   
135
   
(11
)
 
(4
)
 
(45
)
 
304
 
Total assets
   
24,630
   
6,740
   
56
   
299
   
853
   
32,578
 
Total goodwill
   
5,916
   
24
   
-
   
-
   
-
   
5,940
 
Property additions
   
175
   
103
   
-
   
1
   
13
   
292
 
                                       
June 30, 2005
                                     
External revenues
 
$
1,226
 
$
1,416
 
$
59
 
$
135
 
$
7
 
$
2,843
 
Internal revenues
   
80
   
-
   
-
   
-
   
(80
)
 
-
 
Total revenues
   
1,306
   
1,416
   
59
   
135
   
(73
)
 
2,843
 
Depreciation and amortization
   
344
   
(16
)
 
-
   
-
   
7
   
335
 
Investment income
   
47
   
-
   
-
   
-
   
-
   
47
 
Net interest charges
   
99
   
9
   
-
   
2
   
51
   
161
 
Income taxes
   
193
   
(5
)
 
5
   
1
   
47
   
241
 
Income before discontinued operations
   
288
   
(5
)
 
(2
)
 
6
   
(108
)
 
179
 
Discontinued operations
   
-
   
-
   
-
   
(1
)
 
-
   
(1
)
Net income
   
288
   
(5
)
 
(2
)
 
5
   
(108
)
 
178
 
Total assets
   
28,454
   
1,601
   
78
   
512
   
566
   
31,211
 
Total goodwill
   
5,946
   
24
   
-
   
63
   
-
   
6,033
 
Property additions
   
158
   
66
   
-
   
2
   
7
   
233
 

Six Months Ended
                         
                           
June 30, 2006
                         
External revenues
 
$
2,128
 
$
3,297
 
$
104
 
$
136
 
$
(34
)
$
5,631
 
Internal revenues
   
-
   
-
   
-
   
-
   
-
   
-
 
Total revenues
   
2,128
   
3,297
   
104
   
136
   
(34
)
 
5,631
 
Depreciation and amortization
   
486
   
(11
)
 
-
   
2
   
10
   
487
 
Investment Income
   
137
   
17
   
-
   
1
   
(81
)
 
74
 
Net interest charges
   
189
   
103
   
1
   
2
   
38
   
333
 
Income taxes
   
299
   
117
   
1
   
(5
)
 
(61
)
 
351
 
Net income
   
440
   
175
   
(12
)
 
11
   
(89
)
 
525
 
Total assets
   
24,630
   
6,740
   
56
   
299
   
853
   
32,578
 
Total goodwill
   
5,916
   
24
   
-
   
-
   
-
   
5,940
 
Property additions
   
370
   
347
   
-
   
2
   
20
   
739
 
                                       
June 30, 2005
                                     
External revenues
 
$
2,442
 
$
2,793
 
$
102
 
$
247
 
$
9
 
$
5,593
 
Internal revenues
   
158
   
-
   
-
   
-
   
(158
)
 
-
 
Total revenues
   
2,600
   
2,793
   
102
   
247
   
(149
)
 
5,593
 
Depreciation and amortization
   
718
   
(3
)
 
-
   
1
   
13
   
729
 
Investment income
   
88
   
-
   
-
   
-
   
-
   
88
 
Net interest charges
   
197
   
19
   
-
   
3
   
113
   
332
 
Income taxes
   
350
   
(35
)
 
2
   
11
   
34
   
362
 
Income before discontinued operations
   
524
   
(51
)
 
(4
)
 
11
   
(160
)
 
320
 
Discontinued operations
   
-
   
-
   
13
   
5
   
-
   
18
 
Net income
   
524
   
(51
)
 
9
   
16
   
(160
)
 
338
 
Total assets
   
28,454
   
1,601
   
78
   
512
   
566
   
31,211
 
Total goodwill
   
5,946
   
24
   
-
   
63
   
-
   
6,033
 
Property additions
   
299
   
147
   
1
   
4
   
11
   
462
 

Reconciling adjustments to segment operating results from internal management reporting to consolidated external financial reporting primarily consist of interest expense related to holding company debt, corporate support services revenues and expenses, fuel marketing revenues (which are reflected as reductions to expenses for internal management reporting purposes) and elimination of intersegment transactions.

27



14. - FIRSTENERGY INTRA-SYSTEM GENERATION ASSET TRANSFERS

On May 13, 2005, Penn, and on May 18, 2005, the Ohio Companies, entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively. The generating plant interests transferred do not include leasehold interests of CEI, TE and OE in certain of the plants that are currently subject to sale and leaseback arrangements with non-affiliates.

On October 24, 2005, the Ohio Companies and Penn completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.

On December 16, 2005, the Ohio Companies and Penn completed the intra-system transfer of their respective ownership in the nuclear generation assets to NGC through, in the case of OE and Penn, an asset spin-off by way of dividend and, in the case of CEI and TE, a sale at net book value. FENOC continues to operate and maintain the nuclear generation assets.

These transactions were pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants. 
 
15. - JCP&L RESTATEMENT

JCP&L's earnings for the three months and six months ended June 30, 2005 have been restated to reflect the results of a tax audit by the State of New Jersey, in which JCP&L became aware that the New Jersey Transitional Energy Facilities Assessment (TEFA) is not an allowable deduction for state income tax purposes. JCP&L had incorrectly claimed a state income tax deduction for TEFA payments and as a result, income taxes and interest expense were understated by $0.4 million and $0.6 million, respectively, in the second quarter of 2005 and understated by $0.9 million and $1.2 million, respectively, in the first six months of 2005. The effects of these adjustments on JCP&L's Consolidated Statements of Income for the three months and six months ended June 30, 2005 are as follows:

 
 
Three Months
 
Six Months
   
As Previously
   
As
 
As Previously
 
As
 
 
Reported
   
Restated
 
Reported
 
Restated
   
(In millions)
Operating Revenues
$
595.3
 
$
595.3
 
$
1,124.4
 
$
1,124.4
Operating Expenses and
 
   
 
 
 
 
 
 
 
 
Taxes
 
521.2
 
 
521.6
 
 
1,015.9
 
 
1,016.8
Operating Income
 
74.1
 
 
73.7
 
 
108.5
 
 
107.6
Other Income
 
0.3
   
0.3
   
0.3
   
0.3
Net Interest Charges
 
19.1
 
 
19.7
 
 
39.0
 
 
40.2
Net Income
$
55.3
 
$
54.3
 
$
69.8
 
$
67.7
Earnings Applicable
 
   
 
 
 
 
 
 
 
 
to Common Stock
$
55.2
 
$
54.2
 
$
69.6
 
$
67.5

These adjustments were not material to FirstEnergy's consolidated financial statements, nor JCP&L's Consolidated Balance Sheets or Consolidated Statements of Cash Flows.

28



16. - SUBSEQUENT EVENTS

Pennsylvania Law Change

On July 12, 2006, the Governor of Pennsylvania signed House Bill 859, which increases the net operating loss deduction allowed for the corporate net income tax from $2 million to $3 million, or the greater of 12.5% of taxable income. As a result, FirstEnergy expects to recognize a net operating loss benefit of $2.2 million (net of federal tax benefit) in the third quarter of 2006.

New Jersey Law Change

On July 8, 2006, the Governor of New Jersey signed tax legislation that increased the current New Jersey Corporate Business tax by an additional 4% surtax, which increases the effective tax rate from 9% to 9.36%. This increase applies to JCP&L’s 2006 through 2008 tax years and is not expected to have a material impact on FirstEnergy’s or JCP&L’s results of operations.


29


 
                   
CONSOLIDATED STATEMENTS OF INCOME
 
(Unaudited)
 
                   
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
   
2006
 
2005
 
2006
 
2005
 
   
(In millions, except per share amounts)
 
REVENUES:
                 
Electric utilities
 
$
2,341
 
$
2,283
 
$
4,681
 
$
4,550
 
Unregulated businesses
   
445
   
560
   
950
   
1,043
 
 Total revenues
   
2,786
   
2,843
   
5,631
   
5,593
 
                           
EXPENSES:
                         
Fuel and purchased power
   
992
   
933
   
1,990
   
1,828
 
Other operating expenses
   
760
   
873
   
1,653
   
1,757
 
Provision for depreciation
   
144
   
149
   
292
   
292
 
Amortization of regulatory assets
   
199
   
306
   
421
   
617
 
Deferral of new regulatory assets
   
(145
)
 
(120
)
 
(226
)
 
(180
)
General taxes
   
173
   
168
   
366
   
353
 
 Total expenses
   
2,123
   
2,309
   
4,496
   
4,667
 
                           
OPERATING INCOME
   
663
   
534
   
1,135
   
926
 
                           
OTHER INCOME (EXPENSE):
                         
Investment income
   
31
   
47
   
74
   
88
 
Interest expense
   
(178
)
 
(162
)
 
(343
)
 
(326
)
Capitalized interest
   
7
   
5
   
14
   
4
 
Subsidiaries’ preferred stock dividends
   
(2
)
 
(4
)
 
(4
)
 
(10
)
 Net interest charges
   
(142
)
 
(114
)
 
(259
)
 
(244
)
                           
INCOME TAXES
   
217
   
241
   
351
   
362
 
                           
INCOME BEFORE DISCONTINUED OPERATIONS
   
304
   
179
   
525
   
320
 
                           
Discontinued operations (net of income tax benefits of
                         
$1 million and $9 million in the three months and
                         
six months ended June 30, 2005, respectively) (Note 4)
   
-
   
(1
)
 
-
   
18
 
                           
NET INCOME
 
$
304
 
$
178
 
$
525
 
$
338
 
                           
BASIC EARNINGS PER SHARE OF COMMON STOCK:
                         
Earnings before discontinued operations (Note 2)
 
$
0.92
 
$
0.54
 
$
1.59
 
$
0.98
 
Discontinued operations (Note 4)
   
-
   
-
   
-
   
0.05
 
Net earnings per basic share
 
$
0.92
 
$
0.54
 
$
1.59
 
$
1.03
 
                           
WEIGHTED AVERAGE NUMBER OF BASIC SHARES
                         
OUTSTANDING
   
328
   
328
   
328
   
328
 
                           
DILUTED EARNINGS PER SHARE OF COMMON STOCK:
                         
Earnings before discontinued operations (Note 2)
 
$
0.91
 
$
0.54
 
$
1.58
 
$
0.97
 
Discontinued operations (Note 4)
   
-
   
-
   
-
   
0.05
 
Net earnings per diluted share
 
$
0.91
 
$
0.54
 
$
1.58
 
$
1.02
 
                           
WEIGHTED AVERAGE NUMBER OF DILUTED SHARES
                         
OUTSTANDING
   
330
   
330
   
330
   
330
 
                           
DIVIDENDS DECLARED PER SHARE OF COMMON STOCK
 
$
0.45
 
$
0.4125
 
$
0.90
 
$
0.825
 
                           
                           
The preceding Notes to Consolidated Financial Statements as they relate to FirstEnergy Corp. are an integral part of these statements.
 
 
30

 

 
                   
CONSOLIDATED STATEMENTS OF COMPREHENSIVE INCOME
 
(Unaudited)
 
                   
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
   
2006
 
2005
 
2006
 
2005
 
   
(In millions)
 
                   
NET INCOME
 
$
304
 
$
178
 
$
525
 
$
338
 
                           
OTHER COMPREHENSIVE INCOME (LOSS):
                         
Unrealized gain (loss) on derivative hedges
   
36
   
(6
)
 
73
   
1
 
Unrealized gain (loss) on available for sale securities
   
(24
)
 
(16
)
 
13
   
(24
)
 Other comprehensive income (loss)
   
12
   
(22
)
 
86
   
(23
)
Income tax expense (benefit) related to other
                         
 comprehensive income
   
4
   
(6
)
 
31
   
(6
)
 Other comprehensive income (loss), net of tax
   
8
   
(16
)
 
55
   
(17
)
                           
COMPREHENSIVE INCOME
 
$
312
 
$
162
 
$
580
 
$
321
 
                           
                           
The preceding Notes to Consolidated Financial Statements as they relate to FirstEnergy Corp. are an integral part of these statements.
 
 
31

 

FIRSTENERGY CORP.
 
                
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
   
June 30,
 
December 31,
 
   
2006
 
2005
 
   
(In millions)
 
ASSETS
              
                
CURRENT ASSETS:
              
Cash and cash equivalents
       
$
583
 
$
64
 
Receivables -
                   
Customers (less accumulated provisions of $36 million and
                   
$38 million, respectively, for uncollectible accounts)
         
1,173
   
1,293
 
Other (less accumulated provisions of $27 million
                   
for uncollectible accounts in both periods)
         
173
   
205
 
Materials and supplies, at average cost
         
629
   
518
 
Prepayments and other
       
254
   
237
 
         
2,812
   
2,317
 
PROPERTY, PLANT AND EQUIPMENT:
                   
In service
         
23,661
   
22,893
 
Less - Accumulated provision for depreciation
       
9,883
   
9,792
 
           
13,778
   
13,101
 
Construction work in progress
       
642
   
897
 
         
14,420
   
13,998
 
INVESTMENTS:
                   
Nuclear plant decommissioning trusts
         
1,796
   
1,752
 
Investments in lease obligation bonds
         
830
   
890
 
Other
       
745
   
709
 
         
3,371
   
3,351
 
DEFERRED CHARGES AND OTHER ASSETS:
                   
Goodwill
         
5,940
   
6,010
 
Regulatory assets
         
4,396
   
4,486
 
Prepaid pension costs
         
1,013
   
1,023
 
Other
       
626
   
656
 
         
11,975
   
12,175
 
         
$
32,578
 
$
31,841
 
LIABILITIES AND CAPITALIZATION
                   
                     
CURRENT LIABILITIES:
                   
Currently payable long-term debt
       
$
2,004
 
$
2,043
 
Short-term borrowings
         
1,101
   
731
 
Accounts payable
         
682
   
727
 
Accrued taxes
         
750
   
800
 
Other
       
852
   
1,152
 
         
5,389
   
5,453
 
CAPITALIZATION:
                   
Common stockholders’ equity -
                   
Common stock, $.10 par value, authorized 375,000,000 shares -
                   
329,836,276 shares outstanding
         
33
   
33
 
Other paid-in capital
         
7,052
   
7,043
 
Accumulated other comprehensive income (loss)
         
35
   
(20
)
Retained earnings
         
2,385
   
2,159
 
Unallocated employee stock ownership plan common stock -
                 
960,651 and 1,444,796 shares, respectively
       
(17
)
 
(27
)
 Total common stockholders' equity
         
9,488
   
9,188
 
Preferred stock of consolidated subsidiaries
         
154
   
184
 
Long-term debt and other long-term obligations
       
8,729
   
8,155
 
         
18,371
   
17,527
 
NONCURRENT LIABILITIES:
                   
Accumulated deferred income taxes
         
2,792
   
2,726
 
Asset retirement obligations
         
1,160
   
1,126
 
Power purchase contract loss liability
         
1,123
   
1,226
 
Retirement benefits
         
1,355
   
1,316
 
Lease market valuation liability
         
809
   
851
 
Other
       
1,579
   
1,616
 
         
8,818
   
8,861
 
COMMITMENTS, GUARANTEES AND CONTINGENCIES (Note 10)
                 
         
$
32,578
 
$
31,841
 
                     
The preceding Notes to Consolidated Financial Statements as they relate to FirstEnergy Corp. are an integral part of these
 
 
32

 

FIRSTENERGY CORP.
 
            
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
            
   
Six Months Ended
 
   
June 30,
 
   
Restated
2006
 
2005
 
   
(In millions)
 
CASH FLOWS FROM OPERATING ACTIVITIES:
          
Net income
 
$
525
 
$
338
 
Adjustments to reconcile net income to net cash from operating activities -
             
Provision for depreciation
   
292
   
292
 
Amortization of regulatory assets
   
421
   
617
 
Deferral of new regulatory assets
   
(226
)
 
(180
)
Nuclear fuel and lease amortization
   
42
   
38
 
Deferred purchased power and other costs
   
(239
)
 
(210
)
Deferred income taxes and investment tax credits, net
   
32
   
62
 
Deferred rents and lease market valuation liability
   
(105
)
 
(101
)
Accrued compensation and retirement benefits
   
33
   
11
 
Commodity derivative transactions, net
   
25
   
(6
)
Income from discontinued operations
   
-
   
(18
)
Cash collateral
   
(55
)
 
22
 
Decrease (increase) in operating assets -
             
Receivables
   
83
   
(135
)
Materials and supplies
   
(71
)
 
(52
)
Prepayments and other current assets
   
(159
)
 
(159
)
Increase (decrease) in operating liabilities -
             
Accounts payable
   
(40
)
 
104
 
Accrued taxes
   
(45
)
 
39
 
Accrued interest
   
-
   
(4
)
Electric service prepayment programs
   
(29
)
 
226
 
Other
   
1
   
37
 
Net cash provided from operating activities
   
485
   
921
 
               
CASH FLOWS FROM FINANCING ACTIVITIES:
             
New Financing -
             
Long-term debt
   
1,053
   
245
 
Short-term borrowings, net
   
371
   
386
 
Redemptions and Repayments -
             
Preferred stock
   
(30
)
 
(140
)
Long-term debt
   
(485
)
 
(689
)
Net controlled disbursement activity
   
5
   
-
 
Common stock dividend payments
   
(296
)
 
(270
)
Net cash provided from (used for) financing activities
   
618
   
(468
)
               
CASH FLOWS FROM INVESTING ACTIVITIES:
             
Property additions
   
(739
)
 
(462
)
Proceeds from asset sales
   
59
   
61
 
Proceeds from nuclear decommissioning trust fund sales
   
925
   
608
 
Investments in nuclear decommissioning trust funds
   
(932
)
 
(659
)
Cash investments
   
118
   
35
 
Other
   
(15
)
 
(39
)
Net cash used for investing activities
   
(584
)
 
(456
)
               
Net increase (decrease) in cash and cash equivalents
   
519
   
(3
)
Cash and cash equivalents at beginning of period
   
64
   
53
 
Cash and cash equivalents at end of period
 
$
583
 
$
50
 
               
The preceding Notes to Consolidated Financial Statements as they relate to FirstEnergy Corp. are an integral part of these statements.
]

33






 

Report of Independent Registered Public Accounting Firm



To the Stockholders and Board of
Directors of FirstEnergy Corp.:

We have reviewed the accompanying consolidated balance sheet of FirstEnergy Corp. and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statements of cash flows for the six-month periods ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.
 
As described in the section entitled "Restatement of the Consolidated Statements of Cash Flows" included in Note 1 to the consolidated interim financial statements, the Company has restated its previously issued consolidated interim financial statements for the quarter ended June 30, 2006.

We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholders’ equity, preferred stock, cash flows and taxes for the year then ended, management’s assessment of the effectiveness of the Company’s internal control over financial reporting as of December 31, 2005 and the effectiveness of the Company’s internal control over financial reporting as of December 31, 2005; and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 and conditional asset retirement obligations as of December 31, 2005 as discussed in Note 2(K) and Note 12 to those consolidated financial statements and the Company’s change in its method of accounting for the consolidation of variable interest entities as of December 31, 2003 as discussed in Note 7 to those consolidated financial statements] dated February 27, 2006, we expressed unqualified opinions thereon. The consolidated financial statements and management’s assessment of the effectiveness of internal control over financial reporting referred to above are not presented herein. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.
 
 
PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006, except as to Note 1, which is as of October 31, 2006
 




34


FIRSTENERGY CORP.

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


EXECUTIVE SUMMARY

Net income in the second quarter of 2006 was $304 million, or basic earnings of $0.92 per share of common stock ($0.91 diluted), compared with net income of $178 million, or basic and diluted earnings of $0.54 per share of common stock in the second quarter of 2005. FirstEnergy’s earnings increase was driven primarily by increased electric sales revenues, reduced nuclear operating expenses, cost deferrals authorized by the PUCO and PPUC, and reduced transition cost amortization for the Ohio Companies. Earnings in the second quarter and the first six months of 2005 were reduced by $0.22 per share of common stock due to additional income tax expense of $71 million from the enactment of tax legislation in Ohio. Net income in the second quarter and the first six months of 2006 reflected net after-tax charges associated with the sale and impairment of non-core assets of $9 million (or $0.03 per share) and $11 million (or $0.03 per share), respectively. The following Non-GAAP Reconciliation displays the unusual items resulting in the difference between GAAP and non-GAAP earnings.

Reconciliation of non-GAAP to GAAP
 
2006
 
2005
 
 
 
After-tax
 
Basic
 
After-tax
 
Basic
 
 
 
Amount
 
Earnings
 
Amount
 
Earnings
 
Three Months Ended June 30,
 
(Millions)
 
Per Share
 
(Millions)
 
Per Share
 
Earnings Before Unusual Items (Non-GAAP)
 
$
313
 
$
0.95
 
$
233
 
$
0.71
 
Unusual Items:
 
 
                   
 
Non-core asset sales/impairments
 
 
(9
)
 
(0.03
)
 
-
   
-
 
New regulatory assets - JCP&L rate settlement
 
 
-
   
-
   
16
   
0.05
 
Ohio tax write-off
 
 
-
   
-
   
(71
)
 
(0.22
)
Net Income (GAAP)
 
$
304
 
$
0.92
 
$
178
 
$
0.54
 
 
 
 
                   
 
Six Months Ended June 30,
 
 
                   
 
Earnings Before Unusual Items (Non-GAAP)
 
$
536
 
$
1.62
 
$
388
 
$
1.18
 
Unusual Items:
 
 
                   
 
Non-core asset sales/impairments
 
 
(11
)
 
(0.03
)
 
22
   
0.07
 
Sammis plant New Source Review settlement
 
 
-
   
-
   
(14
)
 
(0.04
)
Davis-Besse NRC fine
 
 
-
   
-
   
(3
)
 
(0.01
)
New regulatory assets - JCP&L rate settlement
 
 
-
   
-
   
16
   
0.05
 
Ohio tax write-off
 
 
-
   
-
   
(71
)
 
(0.22
)
Net Income (GAAP)
 
$
525
 
$
1.59
 
$
338
 
$
1.03
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

The Non-GAAP measure above, earnings before unusual items, is not calculated in accordance with GAAP because it excludes the impact of "unusual items." Unusual items reflect the impact on earnings of events that are not routine or for which FirstEnergy believes the financial impact will disappear or become immaterial within a near-term finite period. By removing the earnings effect of such issues that have been resolved or are expected to be resolved over the near term, management and investors can better measure FirstEnergy’s business and earnings potential. In particular, the non-core asset sales item refers to a finite set of energy-related assets that had been previously disclosed as held for sale, a substantial portion of which has already been sold. Similarly, the NRC fine in 2005 and further litigation settlements similar to the class action settlements in 2005 are not reasonably expected over the near term. Furthermore, FirstEnergy believes presenting normalized earnings calculated in this manner provides useful information to investors in evaluating the ongoing results of FirstEnergy’s businesses over the longer term and assists investors in comparing FirstEnergy’s operating performance to the operating performance of others in the energy sector.

Total electric generation sales were up by 3.9% over last year’s second quarter. For the six months ended June 30, 2006, electric generation sales rose 3.0% compared to the same period last year. The increase for both periods was primarily due to the return of customers to the Ohio Companies from third-party suppliers that exited the Ohio marketplace. Electric distribution deliveries were down 1.8% and 2.2% for the quarter and year-to-date periods ending June 30, reflecting milder weather conditions in 2006.

FirstEnergy's generating fleet produced a second quarter record 20.3 billion KWH during the second quarter of 2006 compared to 19.1 billion KWH in the second quarter of 2005. FirstEnergy's non-nuclear fleet produced a record 13.4 billion KWH, while its nuclear facilities produced 6.9 billion KWH.

35


Ohio Supreme Court Decision - On May 3, 2006, the Ohio Supreme Court affirmed, in all but one aspect, the provisions of FirstEnergy's RSP for its Ohio customers. An issue related to customer pricing options was remanded to the PUCO for further consideration. The Court found that FirstEnergy must provide an alternative market-based offering to customers in addition to that which they already have through their rate stabilization price, even if the alternative is higher than that offered through the RSP. On July 20, 2006, FirstEnergy filed a notice with the PUCO to address this issue through a proposed RFP program under which Ohio customers would have the opportunity to switch to alternative generation suppliers at prices established through the RFP program. FirstEnergy also provided notice of potential termination of certain portions of the RSP in the event that the issue is not resolved within a reasonable time frame or if modifications to the RSP are not acceptable. On July 26, 2006, the PUCO directed FirstEnergy to file within 45 days its plan to address the Court’s concern.

Pennsylvania Rate Matters - On May 31, 2006, the ALJ in the Met-Ed and Penelec rate transition plan filing established a procedural schedule with a goal of reaching a recommended decision in this proceeding by November 8, 2006. In accordance with this schedule, intervening parties submitted their written testimony by July 10, 2006. Ten public input hearings were held in various locations throughout the Met-Ed and Penelec service areas between June 20, 2006 and July 20, 2006.

Met-Ed and Penelec Transmission Charges - On May 4, 2006, the PPUC granted authority for Met-Ed and Penelec to defer, for accounting and financial reporting purposes, certain incremental transmission charges during 2006. The PPUC order allows Met-Ed and Penelec to defer, commencing January 1, 2006, the costs that are incremental to the levels currently reflected in the transmission component of Met-Ed’s and Penelec’s base rate tariffs. Recovery of the deferred costs will be considered in their pending comprehensive rate transition plan filing.

Penn RFP - On June 2, 2006, the PPUC approved the bid results for the first bid. On July 18, 2006, the second PLR bid process was held for Penn. On July 20, 2006, the PPUC approved the submissions for the second bid. As a result of bids one and two, supply has been successfully acquired for all seven tranches of the Residential Group and all six of the Small Commercial Group. However, supply has only been acquired for three of the five tranches for the Large Commercial Group. Therefore, a residual third bid is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches.

Environmental Update - In June 2006, FirstEnergy finalized its air quality compliance strategy for 2006 through 2011. The program, which is expected to cost approximately $1.7 billion with the majority of those expenditures occurring between 2007 and 2009, is consistent with previous estimates and assumptions reflected in FirstEnergy’s long-term financial planning for air and water quality and other environmental matters.

Share Repurchase Program - On June 20, 2006, FirstEnergy's Board of Directors authorized a share repurchase program for up to 12 million shares of common stock. At management’s discretion, shares may be acquired on the open market or through privately negotiated transactions, subject to market conditions and other factors. The Board’s authorization of the repurchase program does not require FirstEnergy to purchase any shares and the program may be terminated at any time. The 12 million shares represent 3.6% of the approximately 330 million shares of common stock currently outstanding.

OE Senior Notes Offering - On June 26, 2006, OE issued $600 million of unsecured senior notes, comprised of $250 million due 2016 and $350 million due 2036. Proceeds from these offerings were used in July 2006 to repurchase $500 million of OE’s common stock from FirstEnergy, to redeem $61 million of OE’s preferred stock and to reduce short-term debt. FirstEnergy primarily used the proceeds to redeem, on July 31, 2006, $400 million principal amount of its $1 billion, 5.5% Notes, Series A, in advance of the November 15, 2006 maturity date. This represents an important part of FirstEnergy’s 2006 financing strategy to obtain additional financing flexibility at the holding company level and to capitalize its regulated utilities more appropriately from a regulatory context.

JCP&L Senior Notes Offering - On May 12, 2006, JCP&L issued $200 million of 6.40% secured Senior Notes due 2036. The proceeds of the offering were used to repay at maturity $150 million aggregate principal amount of JCP&L’s 6.45% Senior Notes due May 15, 2006 and for general corporate purposes.

JCP&L Securitization - On June 8, 2006, the NJBPU approved JCP&L's request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.

New Coal Supply Agreement - On June 22, 2006, FGCO entered into a new coal supply agreement with CONSOL Energy, Inc. under which CONSOL will supply a total of more than 128 million tons of high-Btu coal to FirstEnergy for a 20-year period beginning in 2009. The new agreement replaces an existing coal supply agreement that took effect in January 2003 and ran through 2020. Under the new agreement, CONSOL will increase its coal shipments by approximately 2 million tons per year.

36



Ratified Contract Agreements - On May 11, 2006, employees represented by Local 270 of the Utility Workers Union of America (UWUA) voted to ratify a five-year contract agreement. UWUA Local 270 represents approximately 1,075 linemen, substation electricians, meter readers, and support personnel in the greater Cleveland area. On May 26, 2006, employees of Penelec represented by the International Brotherhood of Electrical Workers (IBEW) Local 459 ratified a three-year collective bargaining agreement. IBEW Local 459 includes 482 linemen, substation electricians, meter readers and support personnel.

FIRSTENERGY’S BUSINESS

FirstEnergy is a public utility holding company headquartered in Akron, Ohio that operates primarily through two core business segments (see Results of Operations).

· Regulated Services transmits and distributes electricity through FirstEnergy's eight utility operating companies that collectively comprise the nation’s fifth largest investor-owned electric system, serving 4.5 million customers within 36,100 square miles of Ohio, Pennsylvania and New Jersey. This business segment derives its revenue principally from the delivery of electricity generated or purchased by the Power Supply Management Services segment in the states where the utility subsidiaries operate.

· Power Supply Management Services supplies all of the electric power needs of end-use customers through retail and wholesale arrangements, including regulated retail sales to meet the PLR requirements of FirstEnergy's Ohio and Pennsylvania utility subsidiaries and competitive retail sales to customers primarily in Ohio, Pennsylvania, Maryland and Michigan. This business segment owns and operates FirstEnergy's generating facilities and purchases electricity from the wholesale market to meet sales obligations. The segment's net income is primarily derived from electric generation sales revenues less the related costs of electricity generation, including purchased power, and net transmission, congestion and ancillary costs charged by PJM and MISO to deliver energy to retail customers.

Other operating segments provide a wide range of services, including heating, ventilation, air-conditioning, refrigeration, electrical and facility control systems, high-efficiency electrotechnologies and telecommunication services. FirstEnergy is in the process of divesting its remaining non-core businesses (see Note 4). The assets and revenues for the other business operations are below the quantifiable threshold for separate disclosure as “reportable operating segments”.

FIRSTENERGY INTRA-SYSTEM GENERATION ASSET TRANSFERS

In 2005, the Ohio Companies and Penn entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively. The generating plant interests transferred do not include leasehold interests of CEI, TE and OE in certain of the plants that are currently subject to sale and leaseback arrangements with non-affiliates.

On October 24, 2005, the Ohio Companies and Penn completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.

On December 16, 2005, the Ohio Companies and Penn completed the intra-system transfer of their respective ownership in the nuclear generation assets to NGC through, in the case of OE and Penn, an asset spin-off by way of dividend and, in the case of CEI and TE, a sale at net book value. FENOC continues to operate and maintain the nuclear generation assets.

These transactions were pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants. The transfers were intercompany transactions and, therefore, had no impact on FirstEnergy’s consolidated results.

37


RESTATEMENT OF CONSOLIDATED STATEMENT OF CASH FLOWS

As further discussed in Note 1 to the Consolidated Financial Statements, FirstEnergy is restating its Consolidated Statement of Cash Flows for the six months ended June 30, 2006. This corrects a misclassification of a $78 million cash receipt from the liquidation of cash investments (restricted cash related to the 2005 generation asset transfers) in the first quarter of 2006 and the termination of a lease arrangement in the second quarter of 2006. The cash receipt was previously reported in cash flows from operating activities and should have been reported in cash flows from investing activities. This correction resulted in a $78 million decrease in the previously reported cash flows from operating activities and a corresponding increase in cash flows from investing activities in FirstEnergy’s Consolidated Statements of Cash Flows for the six months ended June 30, 2006. The second quarter of 2006 also included an immaterial misclassification of a non-cash item related to OE’s termination of a capital lease. This lease arrangement termination was previously reported as a $12 million use of cash under “Nuclear fuel and lease amortization” in cash flows from operating activities, a $2 million use of cash under “Redemptions and repayments” in cash flows from financing activities and a $14 million source of cash under “Property additions” in cash flows used for investing activities. However, this non-cash transaction should not have been reflected in the statements of cash flows. This correction resulted in a $12 million increase in cash flows from operating activities, a $2 million increase in cash from financing activities and a $14 million increase in cash used for investing activities. These corrections resulted in revisions in the previously reported Management’s Discussion and Analysis of Results of Operations only to Capital Resources and Liquidity under the Cash Flows From Operating Activities, Cash Flows From Financing Activities and Cash Flows From Investing Activities sections. The restatement does not change FirstEnergy’s previously reported consolidated statements of income and comprehensive income for the three months and six months ended June 30, 2006 or its consolidated balance sheet as of June 30, 2006.

 RESULTS OF OPERATIONS

The financial results discussed below include revenues and expenses from transactions among FirstEnergy's business segments. A reconciliation of segment financial results is provided in Note 13 to the consolidated financial statements. The FSG business segment is included in “Other and Reconciling Adjustments” in this discussion due to its
immaterial impact on current period financial results, but is presented separately in segment information provided in Note 13 to the consolidated financial statements. Net income (loss) by major business segment was as follows:

 
 
 
 
Three Months Ended June 30,
 
Six Months Ended June 30,
 
 
 
 
 
 
 
Increase
 
 
 
Increase
 
 
 
 
 
2006
 
2005
 
(Decrease)
 
2006
 
2005
 
(Decrease)
 
 
 
 
 
(In millions, except per share amounts)
 
Net Income (Loss)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
By Business Segment:
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Regulated Services
 
 
 
 
$
229
 
$
288
 
$
(59
)
$
440
 
$
524
 
$
(84
)
Power supply management services
 
 
 
 
 
135
 
 
(5
 
140
 
 
175
 
 
(51
)
 
226
 
Other and reconciling adjustments*
 
 
 
 
 
(60
)
 
(105
)
 
45
 
 
(90
)
 
(135
)
 
45
 
Total
 
 
 
 
$
304
 
$
178
 
$
126
 
$
525
 
$
338
 
$
187
 
 
 
 
 
 
 
   
 
 
 
 
   
 
   
 
 
 
 
   
Basic Earnings Per Share:
 
 
 
 
 
   
 
 
 
 
   
 
   
 
 
 
 
   
Income before discontinued operations
 
 
 
 
$
0.92
 
$
0.54
 
$
0.38
 
$
1.59
 
$
0.98
 
$
0.61
 
Discontinued operations
 
 
 
 
 
-
   
-
 
 
-
   
-
   
0.05
 
 
(0.05
)
Net earnings per basic share
 
 
 
 
$
0.92
 
$
0.54
 
$
0.38
 
$
1.59
 
$
1.03
 
$
0.56
 
 
 
 
 
 
 
   
 
 
 
 
   
 
   
 
 
 
 
   
Diluted Earnings Per Share:
 
 
 
 
 
   
 
 
 
 
   
 
   
 
 
 
 
   
Income before discontinued operations
 
 
 
 
$
0.91
 
$
0.54
 
$
0.37
 
$
1.58
 
$
0.97
 
$
0.61
 
Discontinued operations
 
 
 
 
 
-
   
-
 
 
-
   
-
   
0.05
 
 
(0.05
)
Net earnings per diluted share
 
 
 
 
$
0.91
 
$
0.54
 
$
0.37
 
$
1.58
 
$
1.02
 
$
0.56
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
*
Represents other operating segments and reconciling items including interest expense on holding company debt and corporate support services revenues and expenses.

Net income in the second quarter and the first six months of 2006 included net losses associated with the sale and impairment of non-core assets of $9 million (or $0.03 per share) and $11 million (or $0.03 per share), respectively.

Net income in the second quarter of 2005 included a net gain resulting from the JCP&L rate settlement of $16 million (or $0.05 per share) and additional income tax expense of $71 million (or $0.22 per share) from the enactment of tax legislation in Ohio. In the first six months of 2005, net income was also increased by $0.02 per share from the
combined impact of $0.07 per share of gains from the sale of non-core assets, offset by $0.04 per share of expense associated with the W. H. Sammis Plant New Source Review settlement and $0.01 per share of expense related to the fine by the NRC regarding the Davis-Besse Nuclear Power Station.

38



Summary of Results of Operations - Second Quarter of 2006 Compared with the Second Quarter of 2005

Financial results for FirstEnergy's major business segments in the second quarter of 2006 and 2005 were as follows:

 
 
 
 
Power
 
 
 
 
 
 
 
 
 
Supply
 
Other and
 
 
 
 
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
2nd Quarter 2006 Financial Results
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
913
 
$
1,640
 
$
-
 
$
2,553
 
Other 
 
 
132
 
 
38
 
 
63
 
 
233
 
Internal
 
 
-
 
 
-
 
 
-
 
 
-
 
Total Revenues
 
 
1,045
 
 
1,678
 
 
63
 
 
2,786
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
992
 
 
-
 
 
992
 
Other operating expenses
 
 
283
 
 
406
 
 
71
 
 
760
 
Provision for depreciation
 
 
88
   
50
 
 
6
 
 
144
 
Amortization of regulatory assets
 
 
195
 
 
4
 
 
-
 
 
199
 
Deferral of new regulatory assets
 
 
(55
)
 
(90
)
 
-
 
 
(145
)
General taxes
 
 
129
 
 
39
 
 
5
 
 
173
 
Total Expenses
 
 
640
 
 
1,401
 
 
82
 
 
2,123
 
 
 
 
   
 
   
 
   
 
   
Operating Income (Loss)
 
 
405
 
 
277
 
 
(19
)
 
663
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
75
 
 
2
 
 
(46
)
 
31
 
Interest expense
 
 
(96
)
 
(56
)
 
(26
)
 
(178
)
Capitalized interest
 
 
5
 
 
2
 
 
-
 
 
7
 
Subsidiaries' preferred stock dividends
 
 
(5
)
 
-
 
 
3
 
 
(2
)
Total Other Income (Expense)
 
 
(21
)
 
(52
)
 
(69
)
 
(142
)
 
 
 
   
 
   
 
   
 
   
Income taxes (benefit)
 
 
155
 
 
90
 
 
(28
)
 
217
 
Income before discontinued operations
 
 
229
 
 
135
 
 
(60
)
 
304
 
Discontinued operations
 
 
-
 
 
-
 
 
-
 
 
-
 
Net Income (Loss)
 
$
229
 
$
135
 
$
(60
)
$
304
 

 
 
 
 
Power
 
 
 
 
 
 
 
 
 
Supply
 
Other and
 
 
 
 
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
2nd Quarter 2005 Financial Results
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
1,087
 
$
1,391
 
$
-
 
$
2,478
 
Other 
 
 
139
 
 
25
 
 
201
 
 
365
 
Internal
 
 
80
 
 
-
 
 
(80
)
 
-
 
Total Revenues
 
 
1,306
 
 
1,416
 
 
121
 
 
2,843
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
933
 
 
-
 
 
933
 
Other operating expenses
 
 
297
 
 
469
 
 
107
 
 
873
 
Provision for depreciation
 
 
138
   
4
 
 
7
 
 
149
 
Amortization of regulatory assets
 
 
306
 
 
-
 
 
-
 
 
306
 
Deferral of new regulatory assets
 
 
(100
)
 
(20
)
 
-
 
 
(120
)
General taxes
 
 
132
 
 
31
 
 
5
 
 
168
 
Total Expenses
 
 
773
 
 
1,417
 
 
119
 
 
2,309
 
 
 
 
   
 
   
 
   
 
   
Operating Income (Loss)
 
 
533
 
 
(1
)
 
2
 
 
534
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
47
 
 
-
 
 
-
 
 
47
 
Interest expense
 
 
(99
)
 
(10
)
 
(53
)
 
(162
)
Capitalized interest
 
 
4
 
 
1
 
 
-
 
 
5
 
Subsidiaries' preferred stock dividends
 
 
(4
)
 
-
 
 
-
 
 
(4
)
Total Other Income (Expense)
 
 
(52
)
 
(9
)
 
(53
)
 
(114
)
 
 
 
   
 
   
 
   
 
   
Income taxes (benefit)
 
 
193
 
 
(5
)
 
53
 
 
241
 
Income before discontinued operations
 
 
288
 
 
(5
)
 
(104
)
 
179
 
Discontinued operations
 
 
-
 
 
-
 
 
(1
)
 
(1
)
Net Income (Loss)
 
$
288
 
$
(5
)
$
(105
)
$
178
 


39



 
 
 
 
Power
 
 
 
 
 
Change Between 2nd Quarter 2006 and
 
 
 
Supply
 
Other and
 
 
 
2nd Quarter 2005 Financial Results
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
Increase (Decrease)
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
(174
)
$
249
 
$
-
 
$
75
 
Other 
 
 
(7
)
 
13
 
 
(138
)
 
(132
)
Internal
 
 
(80
)
 
-
 
 
80
 
 
-
 
Total Revenues
 
 
(261
)
 
262
 
 
(58
)
 
(57
)
 
 
 
 
 
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
59
 
 
-
 
 
59
 
Other operating expenses
 
 
(14
)
 
(63
)
 
(36
)
 
(113
)
Provision for depreciation
 
 
(50
)
 
46
 
 
(1
)
 
(5
)
Amortization of regulatory assets
 
 
(111
)
 
4
 
 
-
 
 
(107
)
Deferral of new regulatory assets
 
 
45
 
 
(70
)
 
-
 
 
(25
)
General taxes
 
 
(3
)
 
8
 
 
-
 
 
5
 
Total Expenses
 
 
(133
)
 
(16
)
 
(37
)
 
(186
)
 
 
 
   
 
   
 
   
 
   
Operating Income
 
 
(128
)
 
278
 
 
(21
)
 
129
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
28
 
 
2
 
 
(46
)
 
(16
)
Interest expense
 
 
3
 
 
(46
)
 
27
 
 
(16
)
Capitalized interest
 
 
1
 
 
1
 
 
-
 
 
2
 
Subsidiaries' preferred stock dividends
 
 
(1
)
 
-
 
 
3
 
 
2
 
Total Other Income (Expense)
 
 
31
 
 
(43
)
 
(16
)
 
(28
)
 
 
 
   
 
   
 
   
 
   
Income taxes
 
 
(38
)
 
95
 
 
(81
)
 
(24
)
Income before discontinued operations
 
 
(59
)
 
140
 
 
44
 
 
125
 
Discontinued operations
 
 
-
 
 
-
 
 
1
 
 
1
 
Net Income
 
$
(59
)
$
140
 
$
45
 
$
126
 
                           

Regulated Services - Second Quarter 2006 Compared to Second Quarter 2005

Net income decreased $59 million (20.5%) to $229 million in the second quarter of 2006 compared to $288 million in the second quarter of 2005, primarily due to decreased operating revenues partially offset by lower operating expenses and taxes.

Revenues -

The decrease in total revenues resulted from the following sources:

   
Three Months Ended June 30,
 
       
Increase
 
Revenues By Type of Service
 
2006
 
2005
 
(Decrease)
 
   
(In millions)
 
Distribution services
 
$
913
 
$
1,087
 
$
(174
)
Transmission services
   
87
   
105
   
(18
)
Internal lease revenues
   
-
   
80
   
(80
)
Other
   
45
   
34
   
11
 
Total Revenues
 
$
1,045
 
$
1,306
 
$
(261
)

Changes in distribution deliveries by customer class are summarized in the following table:

Electric Distribution Deliveries
     
Residential
   
(4.8
)%
Commercial
   
(1.1
)%
Industrial
   
0.4
%
Total Distribution Deliveries
   
(1.8
)%


40


The completion of the Ohio Companies' generation transition cost recovery under their respective transition plans and Penn's transition plan in 2005 was the primary reason for lower distribution unit prices, which, in conjunction with lower KWH deliveries, resulted in lower distribution delivery revenues. The decrease in deliveries to customers was primarily due to unseasonably milder weather during the second quarter of 2006. The following table summarizes major factors contributing to the $174 million decrease in distribution service revenues in the second quarter of 2006:

Sources of Change in Distribution Revenues
 
Increase
(Decrease)
 
   
(In millions)
 
Changes in customer usage
 
$
(54
)
Ohio shopping incentives
   
58
 
Changes in prices:
       
Rate mix and other
   
(178
)
         
Net Decrease in Distribution Revenues
 
$
(174
)

The decrease in internal revenues reflected the effect of the generation asset transfers discussed above. The 2005 generation assets lease revenue from affiliates ceased as a result of the transfers.

Expenses-

The decrease in revenues discussed above was partially offset by the following decreases in total expenses:

·  
Other operating expenses were $14 million lower in 2006 due, in part, to the following factors:

1)  
The absence in 2006 of expenses for ancillary service refunds to third parties of $6 million in 2005 due to the RCP, which provides that alternate suppliers of ancillary services now bill customers directly for those services;

2)  
A $27 million decrease in employee and contractor costs resulting from lower storm-related expenses, reduced employee benefits (principally postretirement benefits) and the decreased use of outside contractors for tree trimming, reliability work, legal services and jobbing and contracting; and

3)  
An $18 million increase due in part to insurance premium costs, financing fees and other administrative costs.

 
·
Lower depreciation expense of $50 million that resulted from the impact of the generation asset transfers;

 
·
Reduced amortization of regulatory assets of $111 million principally due to the completion of Ohio generation transition cost recovery and Penn's transition plan in 2005; and

 
·
General taxes decreased by $3 million primarily due to lower property taxes as a result of the generation asset transfers.

The reduction in the deferral of new regulatory assets resulted from the 2005 JCP&L rate decision and the end of shopping incentive deferrals under the Ohio Companies’ transition plan, partially offset by the distribution cost deferrals under the Ohio Companies’ RCP.

Other Income -

Higher investment income reflects the impact of the generation asset transfers. Interest income on the affiliated company notes receivable from the power supply management services segment in the second quarter of 2006 was partially offset by the absence in 2006 of the majority of nuclear decommissioning trust income which is now included in the power supply management services segment.

Power Supply Management Services - Second Quarter 2006 Compared to Second Quarter 2005

Net income for this segment was $135 million in the second quarter of 2006 compared to a net loss of $5 million in the same period last year. An improvement in the gross generation margin was partially offset by higher depreciation, general taxes and interest expense resulting from the generation asset transfers.

41



Revenues -

Electric generation sales revenues increased $224 million in the second quarter of 2006 compared to the same period in 2005. This increase primarily resulted from a 7.7% increase in retail KWH sales, mostly due to the return of customers as a result of third-party suppliers leaving the Ohio marketplace, and higher unit prices resulting from the 2006 rate stabilization and fuel recovery charges. Additional retail sales reduced energy available for sale to the wholesale market. Increased transmission revenues reflected new revenues of approximately $27 million under the MISO transmission rider that began in the first quarter of 2006.

An increase in reported segment revenues resulted from the following sources:

   
Three Months Ended June 30,
 
       
Increase
 
Revenues By Type of Service
 
2006
 
2005
 
(Decrease)
 
   
(In millions)
 
Electric Generation Sales:
             
Retail
 
$
1,285
 
$
989
 
$
296
 
Wholesale
   
253
   
325
   
(72
)
Total Electric Generation Sales
   
1,538
   
1,314
   
224
 
Transmission
   
134
   
93
   
41
 
Other
   
6
   
9
   
(3
)
Total Revenues
 
$
1,678
 
$
1,416
 
$
262
 

The following table summarizes the price and volume factors contributing to changes in sales revenues from retail and wholesale customers:

   
Increase
 
Source of Change in Electric Generation Sales
 
(Decrease)
 
   
(In millions)
 
Retail:
 
 
 
 
Effect of 7.7% increase in customer usage
 
$
76
 
Increased prices
 
 
220
 
 
 
 
296
 
Wholesale:
 
 
   
Effect of 8.4% decrease in KWH sales
 
 
(27
)
Lower prices
 
 
(45
)
 
 
 
(72
)
Net Increase in Electric Generation Sales
 
$
224
 

Expenses -

Total operating expenses decreased by $16 million. The decrease was due to the following factors:

 
·
Lower non-fuel operating expenses of $63 million reflect the absence in 2006 of generating lease rents of $80 million in 2005 due to the generation asset transfers, partially offset by higher transmission expenses of $11 million related to the transmission revenues discussed above; and

 
·
The $70 million increase in the deferral of new regulatory assets represents PJM/MISO costs incurred that are expected to be recovered from customers through future rates. The recognition of these amounts under the Power Supply Management Services segment reflects a change in the current year operations reporting as discussed in Note 13 - Segment Information. Retail transmission revenues and PJM/MISO transmission revenues and expenses associated with serving electricity load are now included in the power supply management services segment results. The deferrals in 2006 also include the Ohio RCP fuel deferral of $29 million.


42



The above decreases were partially offset by the following:

 
·
Higher fuel and purchased power costs of $59 million, including increased fuel costs of $23 million - coal costs increased $40 million as a result of increased generation output, higher coal commodity prices and increased transportation costs for western coal. The increased coal costs were partially offset by lower natural gas and emission allowance costs of $20 million. Purchased power costs increased $36 million due to higher prices and increased volumes. Factors producing the higher costs are summarized in the following table:

 
 
Increase
 
Source of Change in Fuel and Purchased Power
 
(Decrease)
 
 
 
(In millions)
 
Fuel:
 
 
 
 
Change due to increased unit costs
 
 $
5
 
Change due to volume consumed
 
 
18
 
 
 
 
23
 
Purchased Power:
       
Change due to increased unit costs
 
 
53
 
Change due to volume purchased
 
 
2
 
Increase in NUG costs deferred
 
 
(19
)
     
36
 
         
Net Increase in Fuel and Purchased Power Costs
 
$
59
 


 
·
Increased depreciation expenses of $46 million resulted principally from the generation asset transfers; and

 
·
Higher general taxes of $8 million due to additional property taxes resulting from the generation asset transfers.

Other Income and Expense -

 
·
Investment income in the second quarter of 2006 increased by $2 million over the prior year period primarily due to nuclear decommissioning trust investments acquired through the generation asset transfers; and
     
 
·
Interest expense increased by $46 million, primarily due to the interest expense in 2006 on associated company notes payable that financed the generation asset transfers.

Other - Second Quarter 2006 Compared to Second Quarter 2005

FirstEnergy’s financial results from other operating segments and reconciling items, including interest expense on holding company debt and corporate support services revenues and expenses, resulted in a $45 million increase to FirstEnergy’s net income in the second quarter of 2006 compared to the same quarter of 2005. The increase was primarily due to the absence of an adjustment from the effect of Ohio tax legislation in June 2005, which resulted in additional 2005 tax expenses of $71 million, and a $3 million gain related to interest rate swap financing arrangements. These increases were partially offset by a $5 million reduction in investment income, non-core asset sales gains/impairments of $9 million and a $7 million reduction in gas commodity trading results.

43



Summary of Results of Operations - First Six Months of 2006 Compared with the First Six Months of 2005

Financial results for FirstEnergy's major business segments in the first six months of 2006 and 2005 were as follows:

 
 
 
 
Power
 
 
 
 
 
 
 
 
 
Supply
 
Other and
 
 
 
 
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
First Six Months of 2006 Financial Results
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
1,848
 
$
3,216
 
$
-
 
$
5,064
 
Other 
 
 
280
   
81
 
 
206
 
 
567
 
Internal
 
 
-
 
 
-
 
 
-
 
 
-
 
Total Revenues
 
 
2,128
 
 
3,297
 
 
206
 
 
5,631
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
1,990
 
 
-
 
 
1,990
 
Other operating expenses
 
 
582
 
 
856
 
 
215
 
 
1,653
 
Provision for depreciation
 
 
184
   
96
 
 
12
 
 
292
 
Amortization of regulatory assets
 
 
412
 
 
9
 
 
-
 
 
421
 
Deferral of new regulatory assets
 
 
(110
)
 
(116
)
 
-
 
 
(226
)
General taxes
 
 
269
 
 
84
 
 
13
 
 
366
 
Total Expenses
 
 
1,337
 
 
2,919
 
 
240
 
 
4,496
 
 
 
 
   
 
   
 
   
 
   
Operating Income (Loss)
 
 
791
 
 
378
 
 
(34
)
 
1,135
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
137
 
 
17
 
 
(80
)
 
74
 
Interest expense
 
 
(190
)
 
(109
)
 
(44
)
 
(343
)
Capitalized interest
 
 
8
 
 
6
 
 
-
 
 
14
 
Subsidiaries' preferred stock dividends
 
 
(7
)
 
-
 
 
3
 
 
(4
)
Total Other Income (Expense)
 
 
(52
)
 
(86
)
 
(121
)
 
(259
)
 
 
 
   
 
   
 
   
 
   
Income taxes (benefit)
 
 
299
 
 
117
 
 
(65
)
 
351
 
Income before discontinued operations
 
 
440
 
 
175
 
 
(90
)
 
525
 
Discontinued operations
 
 
-
 
 
-
 
 
-
 
 
-
 
Net Income (Loss)
 
$
440
 
$
175
 
$
(90
)
$
525
 

44



 
 
 
 
Power
 
 
 
 
 
 
 
 
 
Supply
 
Other and
 
 
 
 
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
First Six Months of 2005 Financial Results
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
2,169
 
$
2,746
 
$
-
 
$
4,915
 
Other 
 
 
273
 
 
47
 
 
358
 
 
678
 
Internal
 
 
158
 
 
-
 
 
(158
)
 
-
 
Total Revenues
 
 
2,600
 
 
2,793
 
 
200
 
 
5,593
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
1,828
 
 
-
 
 
1,828
 
Other operating expenses
 
 
625
 
 
968
 
 
164
 
 
1,757
 
Provision for depreciation
 
 
261
   
17
 
 
14
 
 
292
 
Amortization of regulatory assets
 
 
617
 
 
-
 
 
-
 
 
617
 
Deferral of new regulatory assets
 
 
(160
)
 
(20
)
 
-
 
 
(180
)
General taxes
 
 
274
 
 
67
 
 
12
 
 
353
 
Total Expenses
 
 
1,617
 
 
2,860
 
 
190
 
 
4,667
 
 
 
 
   
 
   
 
   
 
   
Operating Income (Loss)
 
 
983
 
 
(67
)
 
10
 
 
926
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
88
 
 
-
 
 
-
 
 
88
 
Interest expense
 
 
(194
)
 
(16
)
 
(116
)
 
(326
)
Capitalized interest
 
 
7
 
 
(3
)
 
-
 
 
4
 
Subsidiaries' preferred stock dividends
 
 
(10
)
 
-
 
 
-
 
 
(10
)
Total Other Income (Expense)
 
 
(109
)
 
(19
)
 
(116
)
 
(244
)
 
 
 
   
 
   
 
   
 
   
Income taxes (benefit)
 
 
350
 
 
(35
)
 
47
 
 
362
 
Income before discontinued operations
 
 
524
 
 
(51
)
 
(153
)
 
320
 
Discontinued operations
 
 
-
 
 
-
 
 
18
 
 
18
 
Net Income (Loss)
 
$
524
 
$
(51
)
$
(135
)
$
338
 

 
 
 
 
Power
 
 
 
 
 
Change Between First Six Months of 2006
 
 
 
Supply
 
Other and
 
 
 
and First Six Months of 2005
 
Regulated
 
Management
 
Reconciling
 
FirstEnergy
 
Financial Results - Increase (Decrease)
 
Services
 
Services
 
Adjustments
 
Consolidated
 
 
 
(In millions)
 
Revenues:
 
 
 
 
 
 
 
 
 
External
 
 
 
 
 
 
 
 
 
Electric
 
$
(321
)
$
470
 
$
-
 
$
149
 
Other 
 
 
7
 
 
34
 
 
(152
)
 
(111
)
Internal
 
 
(158
)
 
-
 
 
158
 
 
-
 
Total Revenues
 
 
(472
)
 
504
 
 
6
 
 
38
 
 
 
 
   
 
   
 
   
 
   
Expenses:
 
 
   
 
   
 
   
 
   
Fuel and purchased power
 
 
-
 
 
162
 
 
-
 
 
162
 
Other operating expenses
 
 
(43
)
 
(112
)
 
51
 
 
(104
)
Provision for depreciation
 
 
(77
)
 
79
 
 
(2
)
 
-
 
Amortization of regulatory assets
 
 
(205
)
 
9
 
 
-
 
 
(196
)
Deferral of new regulatory assets
 
 
50
 
 
(96
)
 
-
 
 
(46
)
General taxes
 
 
(5
)
 
17
 
 
1
 
 
13
 
Total Expenses
 
 
(280
)
 
59
 
 
50
 
 
(171
)
 
 
 
   
 
   
 
   
 
   
Operating Income
 
 
(192
)
 
445
 
 
(44
)
 
209
 
Other Income (Expense):
 
 
   
 
   
 
   
 
   
Investment income
 
 
49
 
 
17
 
 
(80
)
 
(14
)
Interest expense
 
 
4
 
 
(93
)
 
72
 
 
(17
)
Capitalized interest
 
 
1
 
 
9
 
 
-
 
 
10
 
Subsidiaries' preferred stock dividends
 
 
3
 
 
-
 
 
3
 
 
6
 
Total Other Income (Expense)
 
 
57
 
 
(67
)
 
(5
)
 
(15
)
 
 
 
   
 
   
 
   
 
   
Income taxes
 
 
(51
)
 
152
 
 
(112
)
 
(11
)
Income before discontinued operations
 
 
(84
)
 
226
 
 
63
 
 
205
 
Discontinued operations
 
 
-
 
 
-
 
 
(18
)
 
(18
)
Net Income
 
$
(84
)
$
226
 
$
45
 
$
187
 

45


Regulated Services - First Six Months of 2006 Compared to First Six Months of 2005

Net income decreased $84 million (16.0%) to $440 million in the first six months of 2006 compared to $524 million in the first six months of 2005, primarily due to decreased operating revenues partially offset by lower operating expenses and taxes.

Revenues -

The decrease in total revenues resulted from the following sources:

   
Six Months Ended June 30,
 
       
Increase
 
Revenues By Type of Service
 
2006
 
2005
 
(Decrease)
 
   
(In millions)
 
Distribution services
 
$
1,848
 
$
2,169
 
$
(321
)
Transmission services
   
181
   
197
   
(16
)
Internal lease revenues
   
-
   
158
   
(158
)
Other
   
99
   
76
   
23
 
Total Revenues
 
$
2,128
 
$
2,600
 
$
(472
)

Decreases in distribution deliveries by customer class are summarized in the following table:

Electric Distribution Deliveries
     
Residential
   
(3.6
)%
Commercial
   
(1.6
)%
Industrial
   
(1.2
)%
Total Distribution Deliveries
   
(2.2
)%

The completion of the Ohio Companies' generation transition cost recovery under their respective transition plans and Penn's transition plan in 2005 was the primary reason for lower distribution unit prices, which, in conjunction with lower KWH deliveries, resulted in lower distribution delivery revenues. The decreases in deliveries to customers were primarily due to unseasonably milder weather during the first six months of 2006 as compared to the same period in 2005. The following table summarizes major factors contributing to the $321 million decrease in distribution service revenues in the first six months of 2006:

Sources of Change in Distribution Revenues
 
Increase
(Decrease)
 
   
(In millions)
 
Changes in customer usage
 
$
(102
)
Ohio shopping incentives
   
100
 
Changes in prices:
       
Rate mix and other
   
(319
)
         
Net Decrease in Distribution Revenues
 
$
(321
)

The decrease in internal revenues reflected the effect of the generation asset transfers discussed above. The 2005 generation assets lease revenue from affiliates ceased as a result of the transfers.

Expenses-

The decrease in revenues discussed above was partially offset by the following decreases in total expenses:

 
·
Other operating expenses were $43 million lower in 2006 due, in part, to the following factors:

1)  
The absence in 2006 of expenses for ancillary service refunds to third parties of $13 million in 2005 due to the RCP, which provides that alternate suppliers of ancillary services now bill customers directly for those services;

2)  
The absence in 2006 of receivables factoring discount expenses of approximately $6 million incurred in 2005; and

46



3)  
A $33 million decrease in employee and contractor costs resulting from lower storm-related expenses, reduced employee benefits and the decreased use of outside contractors for tree trimming, reliability work, legal services and jobbing and contracting.

 
·
Lower depreciation expense of $77 million resulted from the impact of the generation asset transfers;

 
·
Reduced amortization of regulatory assets of $205 million resulted principally from the completion of Ohio generation transition cost recovery and Penn's transition plan in 2005; and

 
·
General taxes decreased by $5 million primarily due to lower property taxes as a result of the generation asset transfers.

The reduction in the deferral of new regulatory assets resulted from the 2005 JCP&L rate decision and the end of shopping incentive deferrals under the Ohio Companies’ transition plan, partially offset by the distribution cost deferrals under the Ohio Companies’ RCP.

Other Income and Expense -

 
·
Higher investment income reflects the impact of the generation asset transfers. Interest income on the affiliated company notes receivable from the power supply management services segment in the first six months of 2006 is partially offset by the absence in 2006 of the majority of nuclear decommissioning trust income which is now included in the power supply management services segment; and

 
·
Subsidiaries' preferred stock dividends decreased by $3 million in 2006 due to redemption activity in 2005.

Power Supply Management Services - First Six Months of 2006 Compared to First Six Months of 2005

Net income for this segment was $175 million in the first six months of 2006 compared to a net loss of $51 million in the same period last year. An improvement in the gross generation margin was partially offset by higher depreciation, general taxes and interest expense resulting from the generation asset transfers.

Revenues -

Electric generation sales revenues increased $423 million in the first six months of 2006 compared to the same period in 2005. This increase primarily resulted from a 7.2% increase in retail KWH sales, mostly due to the return of customers as a result of third-party suppliers leaving the Ohio marketplace, and higher unit prices resulting from the RSP and RCP that were effective in 2006. The higher retail sales reduced energy available for sale to the wholesale market. Increased transmission revenues reflected new revenues of approximately $54 million under the MISO transmission rider that began in the first quarter of 2006. These increases were partially offset by a reduction in wholesale sales revenue as a result of both lower KWH sales and lower unit prices.

The increase in reported segment revenues resulted from the following sources:

   
Six Months Ended June 30,
 
       
Increase
 
Revenues By Type of Service
 
2006
 
2005
 
(Decrease)
 
   
(In millions)
 
Electric Generation Sales:
             
Retail
 
$
2,524
 
$
1,969
 
$
555
 
Wholesale
   
488
   
620
   
(132
)
Total Electric Generation Sales
   
3,012
   
2,589
   
423
 
Transmission
   
262
   
182
   
80
 
Other
   
23
   
22
   
1
 
Total Revenues
 
$
3,297
 
$
2,793
 
$
504
 


47



The following table summarizes the price and volume factors contributing to changes in sales revenues from retail and wholesale customers:

   
Increase
 
Source of Change in Electric Generation Sales
 
(Decrease)
 
   
(In millions)
 
Retail:
 
 
 
 
Effect of 7.2% increase in customer usage
 
$
141
 
Change in prices
 
 
414
 
 
 
 
555
 
Wholesale:
 
 
   
Effect of 11.9% decrease in KWH sales
 
 
(74
)
Change in prices
 
 
(58
)
 
 
 
(132
)
Net Increase in Electric Generation Sales
 
$
423
 

Expenses -

Total operating expenses increased by $59 million. The increase was due to the following factors:

 
·
Higher fuel and purchased power costs of $162 million, including increased fuel costs of $73 million - coal costs increased $81 million as a result of increased generation output, higher coal commodity prices and increased transportation costs for western coal. The increased coal costs were partially offset by lower natural gas and emission allowance costs of $16 million. Purchased power costs increased $89 million due to higher prices partially offset by lower volumes. Factors contributing to the higher costs are summarized in the following table:

 
 
Increase
 
Source of Change in Fuel and Purchased Power
 
(Decrease)
 
 
 
(In millions)
 
Fuel:
 
 
 
 
Change due to increased unit costs
 
 $
37
 
Change due to volume consumed
 
 
36
 
 
 
 
73
 
Purchased Power:
       
Change due to increased unit costs
 
 
130
 
Change due to volume purchased
 
 
(31
)
Increase in NUG costs deferred
 
 
(10
)
     
89
 
         
Net Increase in Fuel and Purchased Power Costs
 
$
162
 

 
·
Higher transmission expenses of $42 million related to the transmission revenues discussed above;

 
·
Increased depreciation expenses of $79 million, resulting principally from the generation asset transfers; and

 
·
Higher general taxes of $17 million due to additional property taxes resulting from the generation asset transfers.

Partially offsetting these higher costs were lower non-fuel operating expenses of $112 million, which reflect the absence in 2006 of generating asset lease rents of $158 million charged in 2005 due to the generation asset transfers. Also absent in 2006 were: (1) the 2005 accrual of an $8.5 million civil penalty payable to the DOJ and $10 million for obligations to fund environmentally beneficial projects in connection with the Sammis Plant settlement; and (2) a $3.5 million penalty related to the Davis-Besse outage.

The $96 million increase in the deferral of new regulatory assets represents PJM/MISO costs incurred that are expected to be recovered from customers through future rates. The deferrals also include the Ohio RCP fuel deferral of $51 million.

48



Other Income and Expense -

 
·
Investment income in the first six months of 2006 was $17 million higher primarily due to nuclear decommissioning trust investments acquired through the generation asset transfers; and
     
 
·
Interest expense increased by $93 million, primarily due to interest on the associated company notes payable from the generation asset transfers. This increase was partially offset by an additional $9 million of capitalized interest.

Other - First Six Months of 2006 Compared to First Six Months of 2005

FirstEnergy’s financial results from other operating segments and reconciling items, including interest expense on holding company debt and corporate support services revenues and expenses, resulted in a $45 million increase to FirstEnergy’s net income in the first six months of 2006 compared to the same period of 2005. The increase was primarily due to the absence of the write-off of income tax benefits due to the 2005 change in Ohio tax legislation, the financing swap gain described in the Other - Second Quarter 2006 Compared to Second Quarter 2005 results analysis above and a $3 million increase in other investment income in the first half of 2006. These increases were partially offset by the FSG impairment charge and gas commodity trading results reduction and the absence of after - tax gains of $17 million from discontinued operations in 2005 (see Note 4). The following table summarizes the sources of income from discontinued operations for the six months ended June 30, 2005:

 
 
(In millions)
 
Discontinued Operations (Net of tax)
 
 
 
Gain on sale:
 
 
 
Natural gas business
 
$
5
 
Elliot-Lewis, Spectrum and Power Piping
 
 
12
 
Reclassification of operating income
 
 
1
 
Total
 
$
18
 

CAPITAL RESOURCES AND LIQUIDITY

During 2006 and thereafter, FirstEnergy expects to meet its contractual obligations primarily with a combination of cash from operation and funds from the capital markets. Borrowing capacity under credit facilities is available to manage working capital requirements.

Changes in Cash Position

FirstEnergy's primary source of cash required for continuing operations as a holding company is cash from the operations of its subsidiaries. FirstEnergy also has access to $2.0 billion of short-term financing under a revolving credit facility which expires in 2010, subject to short-term debt limitations under current regulatory approvals of $1.5 billion and to outstanding borrowings by subsidiaries of FirstEnergy that are also parties to such facility. FirstEnergy paid cash dividends to common shareholders of $148 million in each quarter of 2006 totaling $296 million for the first six months of 2006. FirstEnergy received $148 million of cash dividends from its subsidiaries in the first quarter of 2006 and borrowed against the $2.0 billion revolving credit facility for the second quarter dividend payment. In July, FirstEnergy received $500 million from OE as a result of OE’s repurchase of common stock. There are no material restrictions on the payment of cash dividends by FirstEnergy's subsidiaries.

As of June 30, 2006, FirstEnergy had $583 million of cash and cash equivalents compared with $64 million as of December 31, 2005. Temporary cash investments of $544 million were used principally to redeem $400 million of the outstanding $1 billion of FirstEnergy’s 5.5% notes in July 2006, in advance of their November 15, 2006 maturity date. The remainder was used in July 2006 to redeem $61 million of OE’s preferred stock and reduce short-term borrowings. The major sources for changes in cash and cash equivalent balances are summarized below.

49


Cash Flows From Operating Activities

FirstEnergy's consolidated net cash from operating activities is provided primarily by its regulated services and power supply management services businesses (see Results of Operations above). Net cash provided from operating activities was $485 million (as restated) and $921 million in the first six months of 2006 and 2005, respectively, summarized as follows:

 
Six Months Ended
 
June 30,
Operating Cash Flows
2006
2005
 
(In millions)
Cash earnings *
$ 783
$ 827
Working capital and other
(298)
94
Net cash provided from operating activities
$ 485
$ 921
     
* Cash earnings are a Non-GAAP measure (see reconciliation below).

Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. FirstEnergy believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income.

 
 
Six Months Ended
 
 
 
June 30,
 
 Reconciliation of Cash Earnings
 
2006
 
2005
 
   
(In millions)
 
Net income (GAAP)
 
$
525
 
$
338
 
Non-cash charges (credits):
 
 
       
 
Provision for depreciation
 
 
292
 
 
 292
 
Amortization of regulatory assets
 
 
421
 
 
617
 
Deferral of new regulatory assets
 
 
(226
)
 
(180
)
Nuclear fuel and lease amortization
 
 
42
 
 
38
 
Deferred purchased power and other costs
 
 
(239
)
 
(210
)
Deferred income taxes and investment tax credits
 
 
32
 
 
62
 
Deferred rents and lease market valuation liability
 
 
(105
)
 
(101
)
Accrued compensation and retirement benefits
   
33
   
11
 
Income from discontinued operations
 
 
-
 
 
(18
)
Other non-cash expenses
 
 
8
 
 
(22
)
Cash earnings (Non-GAAP)
 
$
783
 
$
827
 
 
 
 
 
 
 
 
 

Net cash provided from operating activities decreased by $436 million in the first six months of 2006 compared to the first six months of 2005 primarily due to a $392 million decrease from working capital and a $44 million decrease in cash earnings described under "Results of Operations." The decrease from working capital changes primarily resulted from $242 million of funds received in 2005 for prepaid electric service (under a three-year Energy for Education Program with the Ohio Schools Council), increased outflows of $144 million for payables primarily caused by higher fuel and purchased power costs, $84 million for changes in accrued taxes and $77 million of cash collateral returned to suppliers. These decreases were partially offset by an increase in cash provided from the settlement of receivables of $218 million, reflecting increased electric sales revenues.

50



Cash Flows From Financing Activities

In the first six months of 2006, cash provided from financing activities was $618 million (as restated) compared to cash used for financing activities of $468 million in the first six months of 2005. The following table summarizes security issuances and redemptions.

 
 
Six Months Ended
 
 
 
June 30,
 
Securities Issued or Redeemed
 
2006
 
2005
 
   
(In millions)
 
New issues
 
 
 
 
 
Pollution control notes
 
$
253
 
$
245
 
Secured notes
 
 
200
 
 
-
 
Unsecured notes
 
 
600
 
 
-
 
 
 
$
1,053
 
$
245
 
Redemptions
 
 
   
 
 
 
First mortgage bonds
 
$
1
 
$
178
 
Pollution control notes
 
 
307
 
 
247
 
Secured notes
 
 
177
 
 
49
 
Long-term revolving credit
 
 
-
 
 
215
 
Preferred stock
 
 
30
 
 
140
 
 
 
$
515
 
$
829
 
 
 
 
   
 
 
 
Short-term borrowings, net
 
$
371
 
$
386
 

FirstEnergy had approximately $1.1 billion of short-term indebtedness as of June 30, 2006 compared to approximately $731 million as of December 31, 2005. This increase was due primarily to higher capital expenditures and common dividend payments compared to Net Cash from Operating Activities during the first half of the year. Available bank borrowing capability as of June 30, 2006 included the following:

Borrowing Capability
 
 
 
   
(In millions)
 
Short-term credit facilities(1)
 
$
2,120
 
Accounts receivable financing facilities
   
550
 
Utilized
 
 
(1,096
)
LOCs
 
 
(123
)
Net
 
 $
1,451
 
 
 
 
 
 
(1) A $2 billion revolving credit facility that expires in 2010 is available in various amounts to FirstEnergy and certain of its subsidiaries. A $100 million revolving credit facility that expires in December 2006 and a $20 million uncommitted line of credit facility that expires in September 2006 are both available to FirstEnergy only.

As of June 30, 2006, the Ohio Companies and Penn had the aggregate capability to issue approximately $1.5 billion of additional FMB on the basis of property additions and retired bonds under the terms of their respective mortgage indentures. The issuance of FMB by OE and CEI are also subject to provisions of their senior note indentures generally limiting the incurrence of additional secured debt, subject to certain exceptions that would permit, among other things, the issuance of secured debt (including FMB) (i) supporting pollution control notes or similar obligations, or (ii) as an extension, renewal or replacement of previously outstanding secured debt. In addition, these provisions would permit OE and CEI to incur additional secured debt not otherwise permitted by a specified exception of up to $735 million and $576 million, respectively, as of June 30, 2006. Under the provisions of its senior note indenture, JCP&L may issue additional FMB only as collateral for senior notes. As of June 30, 2006, JCP&L had the capability to issue $610 million of additional senior notes upon the basis of FMB collateral.

Based upon applicable earnings coverage tests in their respective charters, OE, Penn, TE and JCP&L could issue a total of $5 billion of preferred stock (assuming no additional debt was issued) as of June 30, 2006. CEI, Met-Ed and Penelec do not have similar restrictions and could issue up to the number of preferred shares authorized under their respective charters. As a result of OE redeeming all of its outstanding preferred stock on July 7, 2006, the applicable earnings coverage test is inoperative for OE. Accordingly, as of July 7, 2006, Penn, TE and JCP&L could issue a total of $2.6 billion of preferred stock (assuming no additional debt was issued). In the event that OE issues preferred stock in the future, the applicable earnings coverage test will govern the amount of additional preferred stock that OE may issue.

51



As of June 30, 2006, approximately $1 billion of capacity remained unused under an existing shelf registration statement, filed by FirstEnergy with the SEC in 2003, to support future securities issuances. The shelf registration provides the flexibility to issue and sell various types of securities, including common stock, debt securities, and share purchase contracts and related share purchase units. As of June 30, 2006, OE had approximately $400 million of capacity remaining unused under its existing shelf registration for unsecured debt securities.

FirstEnergy's working capital and short-term borrowing needs are met principally with a $2 billion five-year revolving credit facility (included in the table above). Borrowings under the facility are available to each borrower separately and mature on the earlier of 364 days from the date of borrowing or the June 16, 2010 commitment expiration date.

The following table summarizes the borrowing sub-limits for each borrower under the facility, as well as the limitations on short-term indebtedness applicable to each borrower under current regulatory approvals and applicable statutory and/or charter limitations:

 
 
Revolving
 
Regulatory and
 
 
 
Credit Facility
 
Other Short-Term
 
Borrower
 
Sub-Limit
 
Debt Limitations(1)
 
 
 
(In millions)
 
FirstEnergy
 
$
2,000
 
$
1,500
 
OE
 
 
500
 
 
500
 
Penn
 
 
50
 
 
44
 
CEI
 
 
250
 
 
500
 
TE
 
 
250
 
 
500
 
JCP&L
 
 
425
 
 
412
 
Met-Ed
 
 
250
 
 
300
 
Penelec
 
 
250
 
 
300
 
FES
 
 
-(2)
 
 
n/a
 
ATSI
 
 
-(2)
 
 
26
 

 
(1)
As of June 30, 2006.
 
(2)
Borrowing sub-limits for FES and ATSI may be increased to up to $250 million and
$100 million, respectively, by delivering notice to the administrative agent that either (i)
such borrower has senior unsecured debt ratings of at least BBB- by S&P and Baa3 by
Moody’s or (ii) FirstEnergy has guaranteed the obligations of such borrower under the facility.

The revolving credit facility, combined with an aggregate $550 million ($249 million unused as of June 30, 2006) of accounts receivable financing facilities for OE, CEI, TE, Met-Ed, Penelec and Penn, are intended to provide liquidity to meet short-term working capital requirements for FirstEnergy and its subsidiaries.

Under the revolving credit facility, borrowers may request the issuance of LOCs expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit. Total unused borrowing capability under existing credit facilities and accounts receivable financing facilities was $1.5 billion as of June 30, 2006.

The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%, measured at the end of each fiscal quarter. As of June 30, 2006, FirstEnergy and its subsidiaries' debt to total capitalization ratios (as defined under the revolving credit facility) were as follows:
 
Borrower
 
 
FirstEnergy
 
55
%
OE
 
40
%
Penn
 
34
%
CEI
 
49
%
TE
 
28
%
JCP&L
 
29
%
Met-Ed
 
38
%
Penelec
 
36
%

The revolving credit facility does not contain provisions that either restrict the ability to borrow or accelerate repayment of outstanding advances as a result of any change in credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to the credit ratings of the company borrowing the funds.

52


FirstEnergy's regulated companies also have the ability to borrow from each other and the holding company to meet their short-term working capital requirements. A similar but separate arrangement exists among FirstEnergy's unregulated companies. FESC administers these two money pools and tracks surplus funds of FirstEnergy and the respective regulated and unregulated subsidiaries, as well as proceeds available from bank borrowings. Companies receiving a loan under the money pool agreements must repay the principal amount of the loan, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from their respective pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2006 was approximately 4.86% for both the regulated companies’ money pool and the unregulated companies' money pool.

FirstEnergy’s access to capital markets and costs of financing are influenced by the ratings of its securities. The following table displays FirstEnergy’s and the Companies' securities ratings as of July 31, 2006. The ratings outlook from S&P on all securities is stable. The ratings outlook from Moody's and Fitch on all securities is positive.

Issuer
 
Securities
 
S&P
 
Moody’s
 
Fitch
                 
FirstEnergy
 
Senior unsecured
 
BBB-
 
Baa3
 
BBB-
                 
OE
 
Senior unsecured
 
BBB-
 
Baa2
 
BBB
                 
CEI
 
Senior secured
 
BBB
 
Baa2
 
BBB-
   
Senior unsecured
 
BBB-
 
Baa3
 
BB+
                 
TE
 
Senior secured
 
BBB
 
Baa2
 
BBB-
   
Preferred stock
 
BB+
 
Ba2
 
BB
                 
Penn
 
Senior secured
 
BBB+
 
Baa1
 
BBB+
   
Senior unsecured (1)
 
BBB-
 
Baa2
 
BBB
   
Preferred stock
 
BB+
 
Ba1
 
BBB-
                 
JCP&L
 
Senior secured
 
BBB+
 
Baa1
 
BBB+
   
Preferred stock
 
BB+
 
Ba1
 
BBB-
                 
Met-Ed
 
Senior secured
 
BBB+
 
Baa1
 
BBB+
   
Senior unsecured
 
BBB
 
Baa2
 
BBB
                 
Penelec
 
Senior unsecured
 
BBB
 
Baa2
 
BBB

(1) Penn's only senior unsecured debt obligations are notes underlying pollution control revenue refunding bonds issued by the Ohio Air Quality Development Authority to which bonds this rating applies.

On January 20, 2006, TE redeemed all 1.2 million of its outstanding shares of Adjustable Rate Series B preferred stock at $25.00 per share, plus accrued dividends to the date of redemption.

On April 3, 2006, $106.5 million of pollution control revenue refunding bonds were issued on behalf of NGC ($60 million at 3.07% and $46.5 million at 3.25%). The proceeds from the bonds were used to redeem the following Companies' pollution control notes (OE - $60 million at 7.05%, CEI - $27.7 million at 3.32%, TE - $18.8 million at 3.32%). Also, on April 3, 2006, $146.7 million of pollution control revenue refunding bonds were issued on behalf of FGCO ($90.1 million at 3.03% and $56.6 million at 3.10%) which were used to redeem the following Companies' pollution control notes (OE - $14.8 million at 5.45%, Penn - $6.95 million at 5.45%, TE - $34.85 million at 3.18%, CEI - $47.5 million at 3.22%, $39.8 million at 3.20% and $2.8 million at 3.15%) in April and May 2006. These refinancings were undertaken in furtherance of FirstEnergy's intra-system generation asset transfers (see Note 14). The proceeds from NGC's and FGCO's refinancing issuances were used to repay a portion of their associated company notes payable to OE, Penn, CEI and TE, who then redeemed their respective debt.

On May 12, 2006, JCP&L issued $200 million of 6.40% secured senior notes due 2036. The proceeds of the offering were used to repay at maturity $150 million aggregate principal amount of JCP&L’s 6.45% senior notes due May 15, 2006 and for general corporate purposes.

On June 8, 2006, the NJBPU approved JCP&L's request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.

53



On June 20, 2006, FirstEnergy's Board of Directors authorized a share repurchase program for up to 12 million shares of common stock. At management’s discretion shares may be acquired on the open market or through privately negotiated transactions, subject to market conditions and other factors. The Board’s authorization of the repurchase program does not require FirstEnergy to purchase any shares and the program may be terminated at any time. The 12 million shares represent 3.6% of the common stock currently outstanding.

On June 26, 2006, OE issued $600 million of unsecured senior notes, comprised of $250 million of 6.4% notes due 2016 and $350 million of 6.875% notes due 2036. The majority of the proceeds from this offering were used in July 2006 to repurchase $500 million of OE common stock from FirstEnergy, enabling FirstEnergy to accelerate repayment of $400 million of senior notes that were due to mature in November 2006. The remainder of the proceeds were used to redeem approximately $61 million of OE’s preferred stock on July 7, 2006 and to reduce short-term borrowings. This offering represented an important part of FirstEnergy’s 2006 financing strategy to obtain additional financing flexibility at the holding company level and to capitalize the regulated utilities in a way that positions them appropriately in a regulatory context.

Cash Flows From Investing Activities

Net cash flows used in investing activities resulted principally from property additions. Regulated services expenditures for property additions primarily include expenditures supporting the transmission and distribution of electricity. Capital expenditures by the power supply management services segment are principally generation-related. The following table summarizes investments for the six months ended June 30, 2006 and 2005 by segment:

Summary of Cash Flows
 
Property
 
 
 
 
 
 
 
Used for Investing Activities
 
Additions
 
Investments
 
Other
 
Total
 
 Sources (Uses)
 
(In millions)
 
 
 
 
 
 
 
 
 
 
 
Six Months Ended June 30, 2006
 
 
 
 
 
 
 
 
 
Regulated services
 
$
(370
)
$
144
 
$
(9
)
$
(235
)
Power supply management services
 
 
(347
)
 
(24
)
 
1
 
 
(370
)
Other
 
 
(2
)
 
1
 
 
(5
)
 
(6
)
Reconciling items
   
(20
)
 
37
   
10
   
27
 
Total
 
$
(739
)
$
158
 
$
(3
)
$
(584
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Six Months Ended June 30, 2005
 
 
 
 
 
 
 
 
 
 
 
 
 
Regulated services
 
$
(299
$
9
 
$
(7
$
(297
Power supply management services
 
 
(147
 
14
 
 
(5
)
 
(138
Other
 
 
(5
 
4
 
 
(19
 
(20
Reconciling items
   
(11
)
 
10
   
-
   
(1
)
Total
 
$
(462
$
37
 
$
(31
$
(456
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Net cash used for investing activities of $584 million (as restated) in the first six months of 2006 increased by $128 million compared to the first six months of 2005. The increase was principally due to a $277 million increase in property additions which reflects the replacement of the steam generators and reactor head at Beaver Valley Unit 1, air quality control system expenditures and the distribution system Accelerated Reliability Improvement Program. The increase in property additions was partially offset by $78 million from the liquidation of cash investments (restricted cash related to the 2005 generation asset transfers) and a $44 million decrease in net nuclear decommissioning trust activities due to the completion of the Ohio Companies' and Penn's transition cost recovery for decommissioning at the end of 2005.

During the last half of 2006, capital requirements for property additions and capital leases are expected to be approximately $582 million. FirstEnergy and the Companies have additional requirements of approximately $1.2 billion for maturing long-term debt during the remainder of 2006. These cash requirements are expected to be satisfied from a combination of internal cash, funds raised in the long-term debt capital markets and short-term credit arrangements.

FirstEnergy's capital spending for the period 2006-2010 is expected to be approximately $6.8 billion (excluding nuclear fuel), of which $1.2 billion applies to 2006. Investments for additional nuclear fuel during the 2006-2010 periods are estimated to be approximately $745 million, of which approximately $164 million applies to 2006. During the same period, FirstEnergy's nuclear fuel investments are expected to be reduced by approximately $564 million and $91 million, respectively, as the nuclear fuel is consumed.

54



GUARANTEES AND OTHER ASSURANCES

As part of normal business activities, FirstEnergy enters into various agreements on behalf of its subsidiaries to provide financial or performance assurances to third parties. These agreements include contract guarantees, surety bonds, and LOCs. Some of the guaranteed contracts contain collateral provisions that are contingent upon FirstEnergy's credit ratings.

As of June 30, 2006, FirstEnergy's maximum exposure to potential future payments under outstanding guarantees and other assurances totaled approximately $3.5 billion, as summarized below:

   
Maximum
 
Guarantees and Other Assurances
 
Exposure
 
   
(In millions)
 
FirstEnergy Guarantees of Subsidiaries:
     
Energy and Energy-Related Contracts(1)
 
$
814
 
Other(2)
   
1,081
 
     
1,895
 
         
Surety Bonds
   
146
 
LOC(3)(4)
   
1,471
 
         
Total Guarantees and Other Assurances
 
$
3,512
 

 
(1)
Issued for open-ended terms, with a 10-day termination right by FirstEnergy.
 
(2)
Issued for various terms.
 
(3)
Includes $122 million issued for various terms under LOC capacity available under FirstEnergy’s revolving credit agreement and $730 million outstanding in support of pollution control revenue bonds issued with various maturities.
 
(4)
Includes approximately $194 million pledged in connection with the sale and leaseback of Beaver Valley Unit 2 by CEI and TE, $291 million pledged in connection with the sale and leaseback of Beaver Valley Unit 2 by OE and $134 million pledged in connection with the sale and leaseback of Perry by OE.

FirstEnergy guarantees energy and energy-related payments of its subsidiaries involved in energy commodity activities principally to facilitate normal physical transactions involving electricity, gas, emission allowances and coal. FirstEnergy also provides guarantees to various providers of subsidiary financing principally for the acquisition of property, plant and equipment. These agreements legally obligate FirstEnergy to fulfill the obligations of its subsidiaries directly involved in these energy and energy-related transactions or financings where the law might otherwise limit the counterparties' claims. If demands of a counterparty were to exceed the ability of a subsidiary to satisfy existing obligations, FirstEnergy's guarantee enables the counterparty's legal claim to be satisfied by FirstEnergy's other assets. The likelihood that such parental guarantees will increase amounts otherwise paid by FirstEnergy to meet its obligations incurred in connection with ongoing energy and energy-related contracts is remote.

While these types of guarantees are normally parental commitments for the future payment of subsidiary obligations, subsequent to the occurrence of a credit rating downgrade or “material adverse event” the immediate posting of cash collateral or provision of an LOC may be required of the subsidiary. As of June 30, 2006, FirstEnergy's maximum exposure under these collateral provisions was $501 million.

Most of FirstEnergy's surety bonds are backed by various indemnities common within the insurance industry. Surety bonds and related guarantees provide additional assurance to outside parties that contractual and statutory obligations will be met in a number of areas including construction contracts, environmental commitments and various retail transactions.

FirstEnergy has guaranteed the obligations of the operators of the TEBSA project up to a maximum of $6 million (subject to escalation) under the project's operations and maintenance agreement. In connection with the sale of TEBSA in January 2004, the purchaser indemnified FirstEnergy against any loss under this guarantee. FirstEnergy has also provided an LOC ($36 million as of June 30, 2006) which is renewable and declines yearly based upon the senior outstanding debt of TEBSA.

55


OFF-BALANCE SHEET ARRANGEMENTS

FirstEnergy has obligations that are not included on its Consolidated Balance Sheets related to the sale and leaseback arrangements involving Perry, Beaver Valley Unit 2 and the Bruce Mansfield Plant, which are satisfied through operating lease payments. The present value of these sale and leaseback operating lease commitments, net of trust investments, total $1.2 billion as of June 30, 2006.

FirstEnergy has equity ownership interests in certain businesses that are accounted for using the equity method. There are no undisclosed material contingencies related to these investments. Certain guarantees that FirstEnergy does not expect to have a material current or future effect on its financial condition, liquidity or results of operations are disclosed under Guarantees and Other Assurances above.

MARKET RISK INFORMATION

FirstEnergy uses various market risk sensitive instruments, including derivative contracts, primarily to manage the risk of price and interest rate fluctuations. FirstEnergy's Risk Policy Committee, comprised of members of senior management, provides general oversight to risk management activities throughout FirstEnergy and its subsidiaries.

Commodity Price Risk

FirstEnergy is exposed to financial and market risks resulting from the fluctuation of interest rates and commodity prices primarily due to fluctuations in electricity, energy transmission, natural gas, coal, nuclear fuel and emission allowance prices. To manage the volatility relating to these exposures, FirstEnergy uses a variety of non-derivative and derivative instruments, including forward contracts, options, futures contracts and swaps. The derivatives are used principally for hedging purposes. Derivatives that fall within the scope of SFAS 133 must be recorded at their fair value and marked to market. The majority of FirstEnergy's derivative hedging contracts qualify for the normal purchase and normal sale exception under SFAS 133 and are therefore excluded from the table below. Contracts that are not exempt from such treatment include certain power purchase agreements with NUG entities that were structured pursuant to the Public Utility Regulatory Policies Act of 1978. These non-trading contracts are adjusted to fair value at the end of each quarter, with a corresponding regulatory asset recognized for above-market costs. On April 1, 2006, FirstEnergy elected to apply the normal purchase and normal sale exception to certain NUG power purchase agreements with a fair value of $13 million (included in “Other” in the table below) in accordance with guidance in DIG C20. The change in the fair value of commodity derivative contracts related to energy production during the three months and six months ended June 30, 2006 is summarized in the following table:

 
Three Months Ended
 
Six Months Ended
 
Increase (Decrease) in the Fair Value
June 30, 2006
 
June 30, 2006
 
of Commodity Derivative Contracts
Non-Hedge
 
Hedge
 
Total
 
Non-Hedge
 
Hedge
 
Total
 
 
(In millions)
 
Change in the Fair Value of
 
 
 
 
 
 
 
 
 
 
 
 
Commodity Derivative Contracts:
 
 
 
 
 
 
 
 
 
 
 
 
Outstanding net liability at beginning of period
$
(1,129
)
$
(5
)
$
(1,134
)
$
(1,170
)
$
(3
)
$
(1,173
)
New contract value when entered
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Additions/change in value of existing contracts
 
(17
)
 
(3
)
 
(20
)
 
(30
)
 
(10
)
 
(40
)
Change in techniques/assumptions
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
 
-
 
Settled contracts
 
78
 
 
4
 
 
82
 
 
132
 
 
9
 
 
141
 
Other
 
(13
)
 
-
   
(13
)
 
(13
)
 
-
   
(13
)
Outstanding net liability at end of period (1)
 
(1,081
)
 
(4
)
 
(1,085
)
 
(1,081
)
 
(4
)
 
(1,085
)
 
 
   
 
   
 
   
 
   
 
   
 
   
Non-commodity Net Liabilities at End of Period:
 
   
 
   
 
   
 
   
 
   
 
   
Interest rate swaps (2)
 
-
 
 
(25
)
 
(25
)
 
-
 
 
(25
)
 
(25
)
Net Liabilities - Derivative Contracts
at End of Period
$
(1,081
)
$
(29
)
$
(1,110
)
$
(1,081
)
$
(29
)
$
(1,110
)
 
 
   
 
   
 
   
 
   
 
   
 
   
Impact of Changes in Commodity Derivative Contracts(3)
 
   
 
   
 
   
 
   
 
   
 
   
Income Statement effects (pre-tax)
$
(1
)
$
-
 
$
(1
)
$
(3
)
$
-
 
$
(3
)
Balance Sheet effects:
 
   
 
   
 
   
 
   
 
   
 
   
Other comprehensive income (pre-tax)
$
-
 
$
1
 
$
1
 
$
-
 
$
(1
)
$
(1
)
Regulatory assets (net)
$
(62
)
$
-
 
$
(62
)
$
(105
)
$
-
 
$
(105
)
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

(1) Includes $1,078 million in non-hedge commodity derivative contracts (primarily with NUGs), which are offset by a regulatory asset.
(2) Interest rate swaps are treated as cash flow or fair value hedges (see Interest Rate Swap Agreements below).
(3) Represents the change in value of existing contracts, settled contracts and changes in techniques/assumptions.

56



Derivatives are included on the Consolidated Balance Sheet as of June 30, 2006 as follows:

Balance Sheet Classification
 
Non-Hedge
 
Hedge
 
Total
 
   
(In millions)
 
Current-
             
Other assets
 
$
1
 
$
1
 
$
2
 
Other liabilities
   
(6
)
 
(4
)
 
(10
)
                     
Non-Current-
                   
Other deferred charges
   
47
   
29
   
76
 
Other noncurrent liabilities
   
(1,123
)
 
(55
)
 
(1,178
)
                     
Net liabilities
 
$
(1,081
)
$
(29
)
$
(1,110
)

The valuation of derivative contracts is based on observable market information to the extent that such information is available. In cases where such information is not available, FirstEnergy relies on model-based information. The model provides estimates of future regional prices for electricity and an estimate of related price volatility. FirstEnergy uses these results to develop estimates of fair value for financial reporting purposes and for internal management decision making. Sources of information for the valuation of commodity derivative contracts as of June 30, 2006 are summarized by year in the following table:

Source of Information
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
- Fair Value by Contract Year
 
2006(1)
 
2007
 
2008
 
2009
 
2010
 
Thereafter
 
Total
 
   
(In millions)
 
Prices actively quoted(2)
 
$
(1
)
$
(1
)
$
-
 
$
-
 
 $
-
 
$
-
 
$
(2
)
Other external sources(3)
 
 
(144
)
 
(251
)
 
(220
)
 
-
 
 
-
 
 
-
 
 
(615
)
Prices based on models
 
 
-
 
 
-
 
 
-
 
 
(161
)
 
(138
)
 
(169
)
 
(468
)
Total(4)
 
$
(145
)
$
(252
)
$
(220
)
$
(161
)
$
(138
)
$
(169
)
$
(1,085
)

(1) For the last two quarters of 2006.
(2) Exchange traded.
(3) Broker quote sheets.
 
(4)
Includes $1,078 million in non-hedge commodity derivative contracts (primarily with NUGs), which are offset by a regulatory asset.

FirstEnergy performs sensitivity analyses to estimate its exposure to the market risk of its commodity positions. A hypothetical 10% adverse shift (an increase or decrease depending on the derivative position) in quoted market prices in the near term on its derivative instruments would not have had a material effect on its consolidated financial position (assets, liabilities and equity) or cash flows as of June 30, 2006. Based on derivative contracts held as of June 30, 2006, an adverse 10% change in commodity prices would decrease net income by approximately $1 million during the next 12 months.

Interest Rate Swap Agreements - Fair Value Hedges

FirstEnergy utilizes fixed-for-floating interest rate swap agreements as part of its ongoing effort to manage the interest rate risk associated with its debt portfolio. These derivatives are treated as fair value hedges of fixed-rate, long-term debt issues - designed to protect against the risk of changes in the fair value of fixed-rate debt instruments when interest rates decrease. Swap maturities, call options, fixed interest rates and interest payment dates match those of the underlying obligations. During the first six months of 2006, FirstEnergy unwound swaps with a total notional amount of $350 million, for which FirstEnergy paid $1 million in cash. The loss will be recognized over the remaining maturity of each respective hedged security as increased interest expense. As of June 30, 2006, the debt underlying the $750 million outstanding notional amount of interest rate swaps had a weighted average fixed interest rate of 5.74%, which the swaps have converted to a current weighted average variable rate of 6.68%.

57



   
June 30, 2006
 
December 31, 2005
 
   
Notional
 
Maturity
 
Fair
 
Notional
 
Maturity
 
Fair
 
Interest Rate Swaps
 
Amount
 
Date
 
Value
 
Amount
 
Date
 
Value
 
   
(In millions)
 
(Fair value hedges)
 
$
100
   
2008
 
$
(4
)
$
100
   
2008
 
$
(3
)
     
50
   
2010
   
(2
)
 
50
   
2010
   
-
 
     
-
   
2011
   
-
   
50
   
2011
   
-
 
     
300
   
2013
   
(17
)
 
450
   
2013
   
(4
)
     
150
   
2015
   
(16
)
 
150
   
2015
   
(9
)
     
-
   
2016
   
-
   
150
   
2016
   
-
 
     
50
   
2025
   
(4
)
 
50
   
2025
   
(1
)
     
100
   
2031
   
(11
)
 
100
   
2031
   
(5
)
   
$
750
       
$
(54
)
$
1,100
       
$
(22
)

Forward Starting Swap Agreements - Cash Flow Hedges

FirstEnergy utilizes forward starting swap agreements (forward swaps) in order to hedge a portion of the consolidated interest rate risk associated with the anticipated future issuances of fixed-rate, long-term debt securities for one or more of its consolidated subsidiaries in 2006 through 2008. These derivatives are treated as cash flow hedges, protecting against the risk of changes in future interest payments resulting from changes in benchmark U.S. Treasury rates between the date of hedge inception and the date of the debt issuance. During the first six months of 2006, FirstEnergy revised the tenor and timing of its financing plans, and in the second quarter terminated forward swaps with an aggregate notional value of $600 million concurrent with its subsidiaries issuing long-term debt. FirstEnergy received $41 million in cash related to the termination. The gain associated with the ineffective portion of the terminated hedges ($6 million) was recognized in earnings, with the remainder to be recognized over the terms of the respective forward swaps. As of June 30, 2006, FirstEnergy had outstanding forward swaps with an aggregate notional amount of $550 million and an aggregate fair value of $29 million.

   
June 30, 2006
 
December 31, 2005
 
   
Notional
 
Maturity
 
Fair
 
Notional
 
Maturity
 
Fair
 
Forward Starting Swaps
 
Amount
 
Date
 
Value
 
Amount
 
Date
 
Value
 
   
(In millions)
 
(Cash flow hedges)
 
$
25
   
2015
 
$
1
 
$
25
   
2015
 
$
-
 
     
300
   
2016
   
14
   
600
   
2016
   
2
 
     
50
   
2017
   
3
   
25
   
2017
   
-
 
     
125
   
2018
   
8
   
275
   
2018
   
1
 
     
50
   
2020
   
3
   
50
   
2020
   
-
 
   
$
550
       
$
29
 
$
975
       
$
3
 

Equity Price Risk

Included in nuclear decommissioning trusts are marketable equity securities carried at their market value of approximately $1.1 billion as of June 30, 2006 and December 31, 2005. A hypothetical 10% decrease in prices quoted by stock exchanges would result in a $111 million reduction in fair value as of June 30, 2006.

CREDIT RISK

Credit risk is the risk of an obligor’s failure to meet the terms of an investment contract, loan agreement or otherwise perform as agreed. Credit risk arises from all activities in which success depends on issuer, borrower or counterparty performance, whether reflected on or off the balance sheet. FirstEnergy engages in transactions for the purchase and sale of commodities including gas, electricity, coal and emission allowances. These transactions are often with major energy companies within the industry.

FirstEnergy maintains credit policies with respect to its counterparties to manage overall credit risk. This includes performing independent risk evaluations, actively monitoring portfolio trends and using collateral and contract provisions to mitigate exposure. As part of its credit program, FirstEnergy aggressively manages the quality of its portfolio of energy contracts, evidenced by a current weighted average risk rating for energy contract counterparties of BBB (S&P). As of June 30, 2006, the largest credit concentration with one party (currently rated investment grade) represented 8.1% of FirstEnergy's total credit risk. Within FirstEnergy's unregulated energy subsidiaries, 99% of credit exposures, net of collateral and reserves, were with investment-grade counterparties as of June 30, 2006.

58



OUTLOOK

Regulatory Matters

In Ohio, New Jersey and Pennsylvania, laws applicable to electric industry restructuring contain similar provisions that are reflected in the Companies' respective state regulatory plans. These provisions include:

·
restructuring the electric generation business and allowing the Companies' customers to select a competitive electric generation supplier other than the Companies;
   
·
establishing or defining the PLR obligations to customers in the Companies' service areas;
   
·
providing the Companies with the opportunity to recover potentially stranded investment (or transition costs) not otherwise recoverable in a competitive generation market;
   
·
itemizing (unbundling) the price of electricity into its component elements - including generation, transmission, distribution and stranded costs recovery charges;
   
·
continuing regulation of the Companies' transmission and distribution systems; and
   
·
requiring corporate separation of regulated and unregulated business activities.

The Companies and ATSI recognize, as regulatory assets, costs which the FERC, PUCO, PPUC and NJBPU have authorized for recovery from customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets would have been charged to income as incurred. Regulatory assets that do not earn a current return totaled approximately $237 million as of June 30, 2006. The following table discloses the regulatory assets by company and by source:

 
June 30,
 
December 31,
 
Increase
 
Regulatory Assets*
 
2006
 
2005
 
(Decrease)
 
 
 
(In millions)
 
OE
 
$
 756
 
$
775
 
$
(19
)
CEI
 
 
 859
 
 
862
 
 
(3
)
TE
 
 
 267
 
 
287
 
 
(20
)
JCP&L
 
 
 2,122
 
 
2,227
 
 
(105
)
Met-Ed
 
 
 359
 
 
310
 
 
49
 
ATSI
 
 
 33
 
 
25
 
 
8
 
Total
 
$
 4,396
 
$
4,486
 
$
(90
)

 
*
Penn had net regulatory liabilities of approximately $59 million as of June 30, 2006 and December 31, 2005. Penelec had net regulatory liabilities of approximately $135 million and $163 million as of June 30, 2006 and December 31, 2005, respectively. These net regulatory liabilities are included in Other Noncurrent Liabilities on the Consolidated Balance Sheets.

Regulatory assets by source are as follows:

 
 
June 30,
 
December 31,
 
Increase
 
Regulatory Assets By Source
 
2006
 
2005
 
(Decrease)
 
 
 
(In millions)
 
Regulatory transition costs
 
 $
3,365
 
$
3,576
 
$
(211
)
Customer shopping incentives
 
 
644
 
 
884
 
 
(240
)
Customer receivables for future income taxes
 
 
219
 
 
217
 
 
2
 
Societal benefits charge
 
 
19
 
 
29
 
 
(10
)
Loss on reacquired debt
 
 
40
 
 
41
 
 
(1
)
Employee postretirement benefits costs
 
 
51
 
 
55
 
 
(4
)
Nuclear decommissioning, decontamination
 
 
 
 
 
 
 
 
 
 
and spent fuel disposal costs
 
 
(124
 
(126
)
 
2
 
Asset removal costs
 
 
(163
 
(365
)
 
202
 
Property losses and unrecovered plant costs
 
 
24
 
 
29
 
 
(5
)
MISO/PJM transmission costs
 
 
135
 
 
91
 
 
44
 
Fuel costs - RCP
 
 
51
 
 
-
 
 
51
 
Distribution costs - RCP
 
 
81
 
 
-
 
 
81
 
JCP&L reliability costs
 
 
19
 
 
23
 
 
(4
Other
 
 
35
 
 
32
 
 
 3
 
Total
 
$
4,396 
 
$
4,486
 
$
(90
)

59


Reliability Initiatives

FirstEnergy is proceeding with the implementation of the recommendations that were issued from various entities, including governmental, industry and ad hoc reliability entities (PUCO, FERC, NERC and the U.S. - Canada Power System Outage Task Force) in late 2003 and early 2004, regarding enhancements to regional reliability that were to be completed subsequent to 2004. FirstEnergy will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new, or material upgrades to existing, equipment. The FERC or other applicable government agencies and reliability coordinators, however, may take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to EPACT that could require additional, material expenditures.

As a result of outages experienced in JCP&L’s service area in 2002 and 2003, the NJBPU had implemented reviews into JCP&L’s service reliability. In 2004, the NJBPU adopted an MOU that set out specific tasks related to service reliability to be performed by JCP&L and a timetable for completion and endorsed JCP&L’s ongoing actions to implement the MOU. On June 9, 2004, the NJBPU approved a Stipulation that incorporates the final report of an SRM who made recommendations on appropriate courses of action necessary to ensure system-wide reliability. The Stipulation also incorporates the Executive Summary and Recommendation portions of the final report of a focused audit of JCP&L’s Planning and Operations and Maintenance programs and practices (Focused Audit). A final order in the Focused Audit docket was issued by the NJBPU on July 23, 2004. On February 11, 2005, JCP&L met with the DRA to discuss reliability improvements. The SRM completed his work and issued his final report to the NJBPU on June 1, 2006. A meeting was held between JCP&L and the NJBPU on June 29, 2006 to discuss the SRM’s final report. JCP&L filed a comprehensive response to the NJBPU on July 14, 2006. JCP&L continues to file compliance reports reflecting activities associated with the MOU and Stipulation.

EPACT provides for the creation of an ERO to establish and enforce reliability standards for the bulk power system, subject to FERC review. On February 3, 2006, the FERC adopted a rule establishing certification requirements for the ERO, as well as regional entities envisioned to assume monitoring responsibility for the new reliability standards. The FERC issued an order on rehearing on March 30, 2006, providing certain clarifications and essentially affirming the rule.

The NERC has been preparing the implementation aspects of reorganizing its structure to meet the FERC’s certification requirements for the ERO. The NERC made a filing with the FERC on April 4, 2006 to obtain certification as the ERO and to obtain FERC approval of delegation agreements with regional entities. The new FERC rule referred to above, further provides for reorganizing regional reliability organizations (regional entities) that would replace the current regional councils and for rearranging the relationship with the ERO. The “regional entity” may be delegated authority by the ERO, subject to FERC approval, for enforcing reliability standards adopted by the ERO and approved by the FERC. The ERO filing was noticed on April 7, 2006 and comments and reply comments were filed in May, June and July 2006. On July 20, 2006, the FERC certified NERC as the ERO to implement the provisions of Section 215 of the Federal Power Act. The FERC directed NERC to make a compliance filing within ninety days addressing such issues as the regional delegation agreements.

On April 4, 2006, NERC also submitted a filing with the FERC seeking approval of mandatory reliability standards. These reliability standards are based, with some modifications, on the current NERC Version O reliability standards with some additional standards. The reliability standards filing was noticed by the FERC on April 18, 2006. In that notice, the FERC announced its intent to issue a Notice of Proposed Rulemaking on the proposed reliability standards at a future date. On May 11, 2006, the FERC staff released a preliminary assessment that cited many deficiencies in the proposed reliability standards. The NERC and industry participants filed comments in response to the Staff’s preliminary assessment. The FERC held a technical conference on the proposed reliability standards on July 6, 2006. The chairman has indicated that the FERC intends to act on the proposed reliability standards by issuing a NOPR in September of this year. Interested parties will be given the opportunity to comment on the NOPR. NERC has requested an effective date of January 1, 2007 for the proposed reliability standards.

The ECAR, Mid-Atlantic Area Council, and Mid-American Interconnected Network reliability councils have completed the consolidation of these regions into a single new regional reliability organization known as ReliabilityFirst Corporation. ReliabilityFirst began operations as a regional reliability council under NERC on January 1, 2006 and intends to file and obtain certification consistent with the final rule as a “regional entity” under the ERO during 2006. All of FirstEnergy’s facilities are located within the ReliabilityFirst region.

On May 2, 2006, the NERC Board of Trustees adopted eight new cyber security standards that replaced interim standards put in place in the wake of the September 11, 2001 terrorist attacks, and thirteen additional reliability standards. The security standards became effective on June 1, 2006, and the remaining standards will become effective throughout 2006 and 2007. NERC intends to file the standards with the FERC and relevant Canadian authorities for approval.

60


FirstEnergy believes that it is in compliance with all current NERC reliability standards. However, it is expected that the FERC will adopt stricter reliability standards than those contained in the current NERC standards. The financial impact of complying with the new standards cannot be determined at this time. However, EPACT requires that all prudent costs incurred to comply with the new reliability standards be recovered in rates. If FirstEnergy is unable to meet the reliability standards for the bulk power system in the future, it could have a material adverse effect on the Company’s and its subsidiaries’ financial condition, results of operations and cash flows.

See Note 11 to the consolidated financial statements for a more detailed discussion of reliability initiatives.

Ohio

On October 21, 2003 the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO in an August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to establish generation service rates beginning January 1, 2006, in response to the PUCO’s concerns about price and supply uncertainty following the end of the Ohio Companies' transition plan market development period. In October 2004, the OCC and NOAC filed appeals with the Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in the proceeding as well as the associated entries on rehearing. On September 28, 2005, the Supreme Court of Ohio heard oral arguments on the appeals. On May 3, 2006, the Supreme Court of Ohio issued an opinion affirming the PUCO's order with respect to the approval of the rate stabilization charge, approval of the shopping credits, the granting of interest on shopping credit incentive deferral amounts, and approval of the Ohio Companies’ financial separation plan. It remanded one matter back to the PUCO for further consideration of the issue as to whether the RSP, as adopted by the PUCO, provided for sufficient means for customer participation in the competitive marketplace. On May 12, 2006, the Ohio Companies filed a Motion for Reconsideration with the Supreme Court of Ohio which was denied by the Court on June 21, 2006. The RSP contained a provision that permitted the Ohio Companies to withdraw and terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio, rejected all or part of the RSP. In such event, the Ohio Companies have 30 days from the final order or decision to provide notice of termination. On July 20, 2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding on Remand. In their Request, the Ohio Companies provided notice of termination to those provisions of the RSP subject to termination, subject to being withdrawn, and also set forth a framework for addressing the Supreme Court of Ohio’s findings on customer participation, requesting the PUCO to initiate a proceeding to consider the Ohio Companies’ proposal. If the PUCO approves a resolution to the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio Companies, the Ohio Companies’ termination will be withdrawn and considered to be null and void. Separately, the OCC and NOAC also submitted to the PUCO on July 20, 2006 a conceptual proposal dealing with the issue raised by the Supreme Court of Ohio. On July 26, 2006, the PUCO issued an Entry acknowledging the July 20, 2006 filings of the Ohio Companies and the OCC and NOAC, and giving the Ohio Companies 45 days to file a plan in a new docket to address the Court’s concern.

The Ohio Companies filed an application and stipulation with the PUCO on September 9, 2005 seeking approval of the RCP. On November 4, 2005, the Ohio Companies filed a supplemental stipulation with the PUCO, which constituted an additional component of the RCP filed on September 9, 2005. Major provisions of the RCP include:

 
Maintaining the existing level of base distribution rates through December 31, 2008 for OE and TE, and April 30, 2009 for CEI;
     
 
Deferring and capitalizing for future recovery (over a 25-year period) with carrying charges certain distribution costs to be incurred during the period January 1, 2006 through December 31, 2008, not to exceed $150 million in each of the three years;
     
 
Adjusting the RTC and extended RTC recovery periods and rate levels so that full recovery of authorized costs will occur as of December 31, 2008 for OE and TE and as of December 31, 2010 for CEI;
     
 
Reducing the deferred shopping incentive balances as of January 1, 2006 by up to $75 million for OE, $45 million for TE, and $85 million for CEI by accelerating the application of each respective company's accumulated cost of removal regulatory liability; and
     
 
Recovering increased fuel costs (compared to a 2002 baseline) of up to $75 million, $77 million, and $79 million, in 2006, 2007, and 2008, respectively, from all OE and TE distribution and transmission customers through a fuel recovery mechanism. OE, TE, and CEI may defer and capitalize (for recovery over a 25-year period) increased fuel costs above the amount collected through the fuel recovery mechanism.

61


The following table provides the estimated net amortization of regulatory transition costs and deferred shopping incentives (including associated carrying charges) under the RCP for the period 2006 through 2010:

Amortization
 
 
 
 
 
 
 
Total
 
Period
 
OE
 
CEI
 
TE
 
Ohio
 
 
 
(In millions)
 
2006
 
$
177
 
$
95
 
$
86
 
$
358
 
2007
 
 
180
 
 
113
 
 
90
 
 
383
 
2008
 
 
208
 
 
130
 
 
111
 
 
449
 
2009
 
 
-
 
 
211
 
 
-
 
 
211
 
2010
 
 
-
 
 
266
 
 
-
 
 
266
 
Total Amortization
 
$
565
 
$
815
 
$
287
 
$
1,667
 

On January 4, 2006, the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the RSP to provide customers with more certain rate levels than otherwise available under the RSP during the plan period. On January 10, 2006, the Ohio Companies filed a Motion for Clarification of the PUCO order approving the RCP. The Ohio Companies sought clarity on issues related to distribution deferrals, including requirements of the review process, timing for recognizing certain deferrals and definitions of the types of qualified expenditures. The Ohio Companies also sought confirmation that the list of deferrable distribution expenditures originally included in the revised stipulation fall within the PUCO order definition of qualified expenditures. On January 25, 2006, the PUCO issued an Entry on Rehearing granting in part, and denying in part, the Ohio Companies’ previous requests and clarifying issues referred to above. The PUCO granted the Ohio Companies’ requests to:

 
·
Recognize fuel and distribution deferrals commencing January 1, 2006;
     
 
·
Recognize distribution deferrals on a monthly basis prior to review by the PUCO Staff;
     
 
·
Clarify that the types of distribution expenditures included in the Supplemental Stipulation may be deferred; and
     
 
·
Clarify that distribution expenditures do not have to be “accelerated” in order to be deferred.

The PUCO approved the Ohio Companies’ methodology for determining distribution deferral amounts, but denied the Motion in that the PUCO Staff must verify the level of distribution expenditures contained in current rates, as opposed to simply accepting the amounts contained in the Ohio Companies’ Motion. On February 3, 2006, several other parties filed applications for rehearing on the PUCO's January 4, 2006 Order. The Ohio Companies responded to the applications for rehearing on February 13, 2006. In an Entry on Rehearing issued by the PUCO on March 1, 2006, all motions for rehearing were denied. Certain of these parties have subsequently filed notices of appeal with the Supreme Court of Ohio alleging various errors made by the PUCO in its order approving the RCP. The Ohio Companies’ Motion to Intervene in the appeals was granted by the Supreme Court on June 8, 2006. The Appellants’ Merit Briefs were filed at the Supreme Court on July 5, 2006. The Appellees include the PUCO and the Ohio Companies. The Appellees’ Merit Briefs are due on August 4, 2006. Appellants’ Reply Briefs will then be due on August 24, 2006.

On December 30, 2004, the Ohio Companies filed with the PUCO two applications related to the recovery of transmission and ancillary service related costs. The first application sought recovery of these costs beginning January 1, 2006. The Ohio Companies requested that these costs be recovered through a rider that would be effective on January 1, 2006 and adjusted each July 1 thereafter. The parties reached a settlement agreement that was approved by the PUCO on August 31, 2005. The incremental transmission and ancillary service revenues recovered from January 1 through June 30, 2006 were approximately $61 million. That amount included the recovery of a portion of the 2005 deferred MISO expenses as described below. On May 1, 2006, the Ohio Companies filed a modification to the rider to determine revenues ($141 million) from July 2006 through June 2007.

62


The second application sought authority to defer costs associated with transmission and ancillary service related costs incurred during the period October 1, 2003 through December 31, 2005. On May 18, 2005, the PUCO granted the accounting authority for the Ohio Companies to defer incremental transmission and ancillary service-related charges incurred as a participant in MISO, but only for those costs incurred during the period December 30, 2004 through December 31, 2005. Permission to defer costs incurred prior to December 30, 2004 was denied. The PUCO also authorized the Ohio Companies to accrue carrying charges on the deferred balances. On August 31, 2005, the OCC appealed the PUCO's decision. On January 20, 2006, the OCC sought rehearing of the PUCO’s approval of the recovery of deferred costs through the rider during the period January 1, 2006 through June 30, 2006. The PUCO denied the OCC's application on February 6, 2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate this appeal with the deferral appeals discussed above and to postpone oral arguments in the deferral appeal until after all briefs are filed in this most recent appeal of the rider recovery mechanism. On March 20, 2006, the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of the Ohio Companies' case with a similar case involving Dayton Power & Light Company. Oral arguments were heard on May 10, 2006. The Ohio Companies are unable to predict when a decision may be issued.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Ohio.

Pennsylvania

As of June 30, 2006, Met-Ed's and Penelec's regulatory deferrals pursuant to the 1998 Restructuring Settlement (including the Phase 2 Proceedings) and the FirstEnergy/GPU Merger Settlement Stipulation were $335 million and $57 million, respectively. Penelec's $57 million is subject to the pending resolution of taxable income issues associated with NUG trust fund proceeds. The PPUC is reviewing a January 2006 change in Met-Ed’s and Penelec’s NUG purchase power stranded cost accounting methodology. If the PPUC orders Met-Ed and Penelec to reverse the change in accounting methodology, this would result in a pre-tax loss of $10.3 million for Met-Ed.

On January 12, 2005, Met-Ed and Penelec filed, before the PPUC, a request for deferral of transmission-related costs beginning January 1, 2005. The OCA, OSBA, OTS, MEIUG, PICA, Allegheny Electric Cooperative and Pennsylvania Rural Electric Association all intervened in the case. Met-Ed and Penelec sought to consolidate this proceeding (and modified their request to provide deferral of 2006 transmission-related costs only) with the comprehensive rate filing they made on April 10, 2006 as described below. On May 4, 2006, the PPUC approved the modified request. Accordingly, Met-Ed and Penelec have deferred approximately $46 million and $12 million, respectively, representing transmission costs that were incurred from January 1, 2006 through June 30, 2006. On June 5, 2006, the OCA filed before the Commonwealth Court a petition for review of the PPUC's approval of the deferral. On July 12, 2006 the Commonwealth Court granted the PPUC’s motion to quash the OCA’s appeal. The ratemaking treatment of the deferrals will be determined in the comprehensive rate filing proceeding discussed further below.

Met-Ed and Penelec purchase a portion of their PLR requirements from FES through a wholesale power sales agreement. Under this agreement, FES retains the supply obligation and the supply profit and loss risk for the portion of power supply requirements not self-supplied by Met-Ed and Penelec under their contracts with NUGs and other unaffiliated suppliers. The FES arrangement reduces Met-Ed's and Penelec's exposure to high wholesale power prices by providing power at a fixed price for their uncommitted PLR energy costs during the term of the agreement with FES. The wholesale power sales agreement with FES could automatically be extended for each successive calendar year unless any party elects to cancel the agreement by November 1 of the preceding year. On November 1, 2005, FES and the other parties thereto amended the agreement to provide FES the right in 2006 to terminate the agreement at any time upon 60 days notice. On April 7, 2006, the parties to the wholesale power sales agreement entered into a Tolling Agreement that arises out of FES’ notice to Met-Ed and Penelec that FES elected to exercise its right to terminate the wholesale power sales agreement effective midnight December 31, 2006, because that agreement is not economically sustainable to FES.

In lieu of allowing such termination to become effective as of December 31, 2006, the parties agreed, pursuant to the Tolling Agreement, to amend the wholesale power sales agreement to provide as follows:

1. The termination provisions of the wholesale power sales agreement will be tolled for one year until December 31, 2007, provided that during such tolling period:

a. FES will be permitted to terminate the wholesale power sales agreement at any time with sixty days written notice;

b. Met-Ed and Penelec will procure through arrangements other than the wholesale power sales agreement beginning December 1, 2006 and ending December 31, 2007, approximately 33% of the amounts of capacity and energy necessary to satisfy their PLR obligations for which Committed Resources (i.e., non-utility generation under contract to Met-Ed and Penelec, Met-Ed- and Penelec-owned generating facilities, purchased power contracts and distributed generation) have not been obtained; and

63



c. FES will not be obligated to supply additional quantities of capacity and energy in the event that a supplier of Committed Resources defaults on its supply agreement.

2. During the tolling period, FES will not act as an agent for Met-Ed or Penelec in procuring the services under 1.(b) above; and

3. The pricing provision of the wholesale power sales agreement shall remain unchanged provided Met-Ed and Penelec comply with the provisions of the Tolling Agreement and any applicable provision of the wholesale power sales agreement.

In the event that FES elects not to terminate the wholesale power sales agreement effective midnight December 31, 2007, similar tolling agreements effective after December 31, 2007 are expected to be considered by FES for subsequent years if Met-Ed and Penelec procure through arrangements other than the wholesale power sales agreement approximately 64%, 83% and 95% of the additional amounts of capacity and energy necessary to satisfy their PLR obligations for 2008, 2009 and 2010, respectively, for which Committed Resources have not been obtained from the market.

The wholesale power sales agreement, as modified by the Tolling Agreement, requires Met-Ed and Penelec to satisfy the portion of their PLR obligations currently supplied by FES from unaffiliated suppliers at prevailing prices, which are likely to be higher than the current price charged by FES under the current agreement and, as a result, Met-Ed’s and Penelec’s purchased power costs could materially increase. If Met-Ed and Penelec were to replace the entire FES supply at current market power prices without corresponding regulatory authorization to increase their generation prices to customers, each company would likely incur a significant increase in operating expenses and experience a material deterioration in credit quality metrics. Under such a scenario, each company's credit profile would no longer be expected to support an investment grade rating for its fixed income securities. There can be no assurance, however, that if FES ultimately determines to terminate, or significantly modify the agreement, timely regulatory relief will be granted by the PPUC pursuant to the April 10, 2006 comprehensive rate filing discussed below, or, to the extent granted, adequate to mitigate such adverse consequences.

Met-Ed and Penelec made a comprehensive rate filing with the PPUC on April 10, 2006 that addresses a number of transmission, distribution and supply issues. If Met-Ed's and Penelec's preferred approach involving accounting deferrals is approved, the filing would increase annual revenues by $216 million and $157 million, respectively. That filing includes, among other things, a request to charge customers for an increasing amount of market priced power procured through a CBP as the amount of supply provided under the existing FES agreement is phased out in accordance with the April 7, 2006 Tolling Agreement described above. Met-Ed and Penelec also requested approval of the January 12, 2005 petition for the deferral of transmission-related costs discussed above, but only for those costs incurred during 2006. In this rate filing, Met-Ed and Penelec also requested recovery of annual transmission and related costs incurred on or after January 1, 2007, plus the amortized portion of 2006 costs over a ten-year period, along with applicable carrying charges, through an adjustable rider similar to that implemented in Ohio. Changes in the recovery of NUG expenses and the recovery of Met-Ed's non-NUG stranded costs are also included in the filing. The filing contemplates a reduction in distribution rates for Met-Ed of $37 million annually and an increase in distribution rates for Penelec of $20 million annually. The PPUC suspended the effective date (June 10, 2006) of the rate changes for seven months after the filing as permitted under Pennsylvania law. If the PPUC adopts the overall positions taken in the intervenors’ testimony as filed, this would have a material adverse effect on the financial statements of FirstEnergy, Met-Ed and Penelec. Hearings are scheduled for late August 2006 and a PPUC decision is expected early in the first quarter of 2007.

Under Pennsylvania's electric competition law, Penn is required to secure generation supply for customers who do not choose alternative suppliers for their electricity. On October 11, 2005, Penn filed a plan with the PPUC to secure electricity supply for its customers at set rates following the end of its transition period on December 31, 2006. Penn recommended that the RFP process cover the period January 1, 2007 through May 31, 2008. To the extent that an affiliate of Penn supplies a portion of the PLR load included in the RFP, authorization to make the affiliate sale must be obtained from the FERC. Hearings before the PPUC were held on January 10, 2006 with main briefs filed on January 27, 2006 and reply briefs filed on February 3, 2006. On February 16, 2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with modifications. On April 20, 2006, the PPUC approved the Recommended Decision with additional modifications to use an RFP process to obtain Penn’s power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submissions for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

64



On May 25, 2006, Penn filed a Petition for Review of the PPUC’s Orders of April 28, 2006 and May 4, 2006, which together decided the issues associated with Penn’s proposed Interim PLR Supply Plan. Penn has asked the Commonwealth Court to review the PPUC’s decision to deny its recovery of certain PLR costs via a reconciliation mechanism and its decision to impose a geographic limitation on the sources of alternative energy credits. On June 7, 2006, the PaDEP filed a Petition for Review appealing the PPUC’s ruling on the method by which alternative energy credits may be acquired and traded. Penn is unable to predict the outcome of this appeal.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Pennsylvania.

New Jersey

JCP&L is permitted to defer for future collection from customers the amounts by which its costs of supplying BGS to non-shopping customers and costs incurred under NUG agreements exceed amounts collected through BGS and NUGC rates and market sales of NUG energy and capacity. As of June 30, 2006, the accumulated deferred cost balance totaled approximately $638 million. New Jersey law allows for securitization of JCP&L's deferred balance upon application by JCP&L and a determination by the NJBPU that the conditions of the New Jersey restructuring legislation are met. On February 14, 2003, JCP&L filed for approval to securitize the July 31, 2003 deferred balance. On June 8, 2006, the NJBPU approved JCP&L’s request to issue securitization bonds associated with BGS stranded cost deferrals. On August 4, 2006, JCP&L Transition Funding II, a wholly owned subsidiary of JCP&L, secured pricing on the issuance of $182 million of transition bonds with a weighted average interest rate of 5.5%.

On December 2, 2005, JCP&L filed a request for recovery of $165 million of actual above-market NUG costs incurred from August 1, 2003 through October 31, 2005 and forecasted above-market NUG costs for November and December 2005. On February 23, 2006, JCP&L filed updated data reflecting actual amounts through December 31, 2005 of $154 million of cost incurred since July 31, 2003. On March 29, 2006, a pre-hearing conference was held with the presiding ALJ. A schedule for the proceeding was established including a discovery period and evidentiary hearings scheduled for September 2006.

An NJBPU Decision and Order approving a Phase II Stipulation of Settlement and resolving the Motion for Reconsideration of the Phase I Order was issued on May 31, 2005. The Phase II Settlement includes a performance standard pilot program with potential penalties of up to 0.25% of allowable equity return. The Order requires that JCP&L file quarterly reliability reports (CAIDI and SAIFI information related to the performance pilot program) through December 2006 and updates to reliability related project expenditures until all projects are completed. The last of the quarterly reliability reports was submitted on June 12, 2006. As of June 30, 2006, there were no performance penalties issued by the NJBPU.

On August 1, 2005, the NJBPU established a proceeding to determine whether additional ratepayer protections are required at the state level in light of the repeal of PUHCA pursuant to the EPACT. An NJBPU proposed rulemaking to address the issues was published in the NJ Register on December 19, 2005. The proposal would prevent a holding company that owns a gas or electric public utility from investing more than 25% of the combined assets of its utility and utility-related subsidiaries into businesses unrelated to the utility industry. A public hearing was held on February 7, 2006 and comments were submitted to the NJBPU. The NJBPU Staff issued a draft proposal on March 31, 2006 addressing various issues including access to books and records, ring-fencing, cross subsidization, corporate governance and related matters. With the approval of the NJBPU Staff, the affected utilities jointly submitted an alternative proposal on June 1, 2006. Comments on the alternative proposal were submitted on June 15, 2006. JCP&L is unable to predict the outcome of this proposal.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in New Jersey.

FERC Matters

On November 18, 2004, the FERC issued an order eliminating the RTOR for transmission service between the MISO and PJM regions. The FERC also ordered the MISO, PJM and the transmission owners within MISO and PJM to submit compliance filings containing a SECA mechanism to recover lost RTOR revenues during a 16-month transition period from load serving entities. The FERC issued orders in 2005 setting the SECA for hearing. ATSI, JCP&L, Met-Ed, Penelec, and FES continue to be involved in the FERC hearings concerning the calculation and imposition of the SECA charges. The hearing was held in May 2006. Initial briefs were submitted on June 9, 2006, and reply briefs were filed on June 27, 2006. The FERC has ordered the Presiding Judge to issue an initial decision by August 11, 2006.

65



On November 1, 2004, ATSI filed with FERC a request to defer approximately $54 million of costs to be incurred from 2004 through 2007 in connection with ATSI’s VMEP, which represents ATSI’s adoption of newly identified industry “best practices” for vegetation management. On March 4, 2005, the FERC approved ATSI’s request to defer the VMEP costs (approximately $33 million deferred as of June 30, 2006). On March 28, 2006, ATSI and MISO filed with the FERC a request to modify ATSI’s Attachment O formula rate to include revenue requirements associated with recovery of deferred VMEP costs over a five-year period. The requested effective date to begin recovery was June 1, 2006. Various parties filed comments responsive to the March 28, 2006 submission. The FERC conditionally approved the filing on May 22, 2006, subject to a compliance filing that ATSI made on June 13, 2006. A request for rehearing of the FERC’s May 22, 2006 Order was filed by a party, which ATSI answered. On July 21, 2006, the FERC issued an order stating that it needs more time to consider the matter. In light of that order, there is no time period by which the FERC must act on the pending rehearing request. On July 14, 2006, the FERC accepted the ATSI’s June 13, 2006 compliance filing. The estimated annual revenues to ATSI from the VMEP cost recovery is $12 million.

On January 24, 2006, ATSI and MISO filed a request with the FERC to correct ATSI’s Attachment O formula rate to reverse revenue credits associated with termination of revenue streams from transitional rates stemming from FERC’s elimination of RTOR. Revenues formerly collected under these rates were included in, and served to reduce, ATSI’s zonal transmission rate under the Attachment O formula. Absent the requested correction, elimination of these revenue streams would not be fully reflected in ATSI’s formula rate until June 1, 2008. On March 16, 2006, the FERC approved the revenue credit correction without suspension, effective April 1, 2006. One party sought rehearing of the FERC's order. The request for rehearing of this order was denied on June 27, 2006. The FERC accepted MISO’s and ATSI’s revised tariff sheets for filing on June 7, 2006. The estimated annual revenue impact of the correction mechanism is approximately $40 million effective on June 1, 2006.
 
        On January 31, 2005, certain PJM transmission owners made three filings with the FERC pursuant to a settlement agreement previously approved by the FERC. JCP&L, Met-Ed and Penelec were parties to that proceeding and joined in two of the filings. In the first filing, the settling transmission owners submitted a filing justifying continuation of their existing rate design within the PJM RTO. In the second filing, the settling transmission owners proposed a revised Schedule 12 to the PJM tariff designed to harmonize the rate treatment of new and existing transmission facilities. Interventions and protests were filed on February 22, 2005. In the third filing, Baltimore Gas and Electric Company and Pepco Holdings, Inc. requested a formula rate for transmission service provided within their respective zones. On May 31, 2005, the FERC issued an order on these cases. First, it set for hearing the existing rate design and indicated that it will issue a final order within six months. American Electric Power Company, Inc. filed in opposition proposing to create a "postage stamp" rate for high voltage transmission facilities across PJM. Second, the FERC approved the proposed Schedule 12 rate harmonization. Third, the FERC accepted the proposed formula rate, subject to refund and hearing procedures. On June 30, 2005, the settling PJM transmission owners filed a request for rehearing of the May 31, 2005 order. On March 20, 2006 a settlement was filed with FERC in the formula rate proceeding that generally accepts the companies' formula rate proposal. The FERC issued an order approving this settlement on April 19, 2006. Hearings in the PJM rate design case concluded in April 2006. On July 13, 2006, an Initial Decision was issued by the ALJ. The ALJ adopted the Trial Staff’s position that the cost of all PJM transmission facilities should be recovered through a postage stamp rate. The ALJ recommended an April 1, 2006 effective date for this change in rate design. If the FERC accepts this recommendation, the transmission rate applicable to many load zones in PJM would increase. FirstEnergy believes that significant additional transmission revenues would have to be recovered from the JCP&L, Met-Ed and Penelec transmission zones within PJM. The Companies, as part of the Responsible Pricing Alliance, intend to submit a brief on exceptions within thirty days of the initial decision. Following submission of reply exceptions, the case is expected to be reviewed by the FERC with a decision anticipated in the fourth quarter of 2006.
 
On November 1, 2005, FES filed two power sales agreements for approval with the FERC. One power sales agreement provided for FES to provide the PLR requirements of the Ohio Companies at a price equal to the retail generation rates approved by the PUCO for a period of three years beginning January 1, 2006. The Ohio Companies will be relieved of their obligation to obtain PLR power requirements from FES if the Ohio CBP results in a lower price for retail customers. A similar power sales agreement between FES and Penn permits Penn to obtain its PLR power requirements from FES at a fixed price equal to the retail generation price during 2006. The PPUC approved Penn's plan with modifications on April 20, 2006 to use an RFP process to obtain its power supply requirements after 2006 through two separate solicitations. An initial RFP solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submission for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

66



On December 29, 2005, the FERC issued an order setting the two power sales agreements for hearing. The order criticized the Ohio CBP, and required FES to submit additional evidence in support of the reasonableness of the prices charged in the power sales agreements. A pre-hearing conference was held on January 18, 2006 to determine the hearing schedule in this case. Under the procedural schedule approved in this case, FES expected an initial decision to be issued in late January 2007. However, on July 14, 2006, the Chief Judge granted the joint motion of FES and the Trial Staff to appoint a settlement judge in this proceeding. The procedural schedule has been suspended pending negotiations among the parties.

Environmental Matters

FirstEnergy accrues environmental liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in FirstEnergy’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

On December 1, 2005, FirstEnergy issued a comprehensive report to shareholders regarding air emissions regulations and an assessment of future risks and mitigation efforts. The report is available on FirstEnergy's Web site at www.firstenergycorp.com/environmental.

Clean Air Act Compliance
 
        FirstEnergy is required to meet federally approved SO2 regulations. Violations of such regulations can result in shutdown of the generating unit involved and/or civil or criminal penalties of up to $32,500 for each day the unit is in violation. The EPA has an interim enforcement policy for SO2 regulations in Ohio that allows for compliance based on a 30-day averaging period. FirstEnergy cannot predict what action the EPA may take in the future with respect to the interim enforcement policy.
 
        The EPA Region 5 issued a Finding of Violation and NOV to the Bay Shore Power Plant dated June 15, 2006 alleging violations to various sections of the Clean Air Act. A meeting has been scheduled for August 8, 2006 to discuss the alleged violations with the EPA.

FirstEnergy believes it is complying with SO2 reduction requirements under the Clean Air Act Amendments of 1990 by burning lower-sulfur fuel, generating more electricity from lower-emitting plants, and/or using emission allowances. NOX reductions required by the 1990 Amendments are being achieved through combustion controls and the generation of more electricity at lower-emitting plants. In September 1998, the EPA finalized regulations requiring additional NOX reductions from FirstEnergy's facilities. The EPA's NOX Transport Rule imposes uniform reductions of NOX emissions (an approximate 85% reduction in utility plant NOX emissions from projected 2007 emissions) across a region of nineteen states (including Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based on a conclusion that such NOX emissions are contributing significantly to ozone levels in the eastern United States. FirstEnergy believes its facilities are also complying with the NOX budgets established under State Implementation Plans through combustion controls and post-combustion controls, including Selective Catalytic Reduction and Selective Non-Catalytic Reduction systems, and/or using emission allowances.

National Ambient Air Quality Standards

In July 1997, the EPA promulgated changes in the NAAQS for ozone and fine particulate matter. In March 2005, the EPA finalized CAIR covering a total of 28 states (including Michigan, New Jersey, Ohio and Pennsylvania) and the District of Columbia based on proposed findings that air emissions from 28 eastern states and the District of Columbia significantly contribute to non-attainment of the NAAQS for fine particles and/or the "8-hour" ozone NAAQS in other states. CAIR provides each affected state until 2006 to develop implementing regulations to achieve additional reductions of NOX and SO2 emissions in two phases (Phase I in 2009 for NOX, 2010 for SO2 and Phase II in 2015 for both NOX and SO2). FirstEnergy's Michigan, Ohio and Pennsylvania fossil-fired generation facilities will be subject to caps on SO2 and NOX emissions, whereas its New Jersey fossil-fired generation facility will be subject to a cap on NOX emissions only. According to the EPA, SO2 emissions will be reduced by 45% (from 2003 levels) by 2010 across the states covered by the rule, with reductions reaching 73% (from 2003 levels) by 2015, capping SO2 emissions in affected states to just 2.5 million tons annually. NOX emissions will be reduced by 53% (from 2003 levels) by 2009 across the states covered by the rule, with reductions reaching 61% (from 2003 levels) by 2015, achieving a regional NOX cap of 1.3 million tons annually. The future cost of compliance with these regulations may be substantial and will depend on how they are ultimately implemented by the states in which the Companies operate affected facilities.

67


Mercury Emissions

In December 2000, the EPA announced it would proceed with the development of regulations regarding hazardous air pollutants from electric power plants, identifying mercury as the hazardous air pollutant of greatest concern. In March 2005, the EPA finalized CAMR, which provides for a cap-and-trade program to reduce mercury emissions from coal-fired power plants in two phases. Initially, mercury emissions will be capped nationally at 38 tons by 2010 (as a "co-benefit" from implementation of SO2 and NOX emission caps under the EPA's CAIR program). Phase II of the mercury cap-and-trade program will cap nationwide mercury emissions from coal-fired power plants at 15 tons per year by 2018. However, the final rules give states substantial discretion in developing rules to implement these programs. In addition, both CAIR and CAMR have been challenged in the United States Court of Appeals for the District of Columbia. FirstEnergy's future cost of compliance with these regulations may be substantial and will depend on how they are ultimately implemented by the states in which FirstEnergy operates affected facilities.

The model rules for both CAIR and CAMR contemplate an input-based methodology to allocate allowances to affected facilities. Under this approach, allowances would be allocated based on the amount of fuel consumed by the affected sources. FirstEnergy would prefer an output-based generation-neutral methodology in which allowances are allocated based on megawatts of power produced. Since this approach is based on output, new and non-emitting generating facilities, including renewables and nuclear, would be entitled to their proportionate share of the allowances. Consequently, FirstEnergy would be disadvantaged if these model rules were implemented because FirstEnergy’s substantial reliance on non-emitting (largely nuclear) generation is not recognized under the input-based allocation.

Pennsylvania has proposed a new rule to regulate mercury emissions from coal-fired power plants that does not provide a cap and trade approach as in CAMR, but rather follows a command and control approach imposing emission limits on individual sources. If adopted as proposed, Pennsylvania’s mercury regulation would deprive FirstEnergy of mercury emission allowances that were to be allocated to the Mansfield Plant under CAMR and that would otherwise be available for achieving FirstEnergy system-wide compliance. The future cost of compliance with these regulations, if adopted and implemented as proposed, may be substantial.

W. H. Sammis Plant

In 1999 and 2000, the EPA issued NOV or Compliance Orders to nine utilities alleging violations of the Clean Air Act based on operation and maintenance of 44 power plants, including the W. H. Sammis Plant, which was owned at that time by OE and Penn. In addition, the DOJ filed eight civil complaints against various investor-owned utilities, including a complaint against OE and Penn in the U.S. District Court for the Southern District of Ohio. These cases are referred to as New Source Review cases. On March 18, 2005, OE and Penn announced that they had reached a settlement with the EPA, the DOJ and three states (Connecticut, New Jersey, and New York) that resolved all issues related to the W. H. Sammis Plant New Source Review litigation. This settlement agreement was approved by the Court on July 11, 2005, and requires reductions of NOX and SO2 emissions at the W. H. Sammis Plant and other coal fired plants through the installation of pollution control devices and provides for stipulated penalties for failure to install and operate such pollution controls in accordance with that agreement. Consequently, if FirstEnergy fails to install such pollution control devices, for any reason, including, but not limited to, the failure of any third-party contractor to timely meet its delivery obligations for such devices, FirstEnergy could be exposed to penalties under the settlement agreement. Capital expenditures necessary to meet those requirements are currently estimated to be $1.5 billion (the primary portion of which is expected to be spent in the 2008 to 2011 time period). On August 26, 2005, FGCO entered into an agreement with Bechtel Power Corporation under which Bechtel will engineer, procure, and construct air quality control systems for the reduction of sulfur dioxide emissions. The settlement agreement also requires OE and Penn to spend up to $25 million toward environmentally beneficial projects, which include wind energy purchased power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty of $8.5 million. Results for the first quarter of 2005 included the penalties paid by OE and Penn of $7.8 million and $0.7 million, respectively. OE and Penn also recognized liabilities in the first quarter of 2005 of $9.2 million and $0.8 million, respectively, for probable future cash contributions toward environmentally beneficial projects.

Climate Change

In December 1997, delegates to the United Nations' climate summit in Japan adopted an agreement, the Kyoto Protocol, to address global warming by reducing the amount of man-made GHG emitted by developed countries by 5.2% from 1990 levels between 2008 and 2012. The United States signed the Kyoto Protocol in 1998 but it failed to receive the two-thirds vote of the United States Senate required for ratification. However, the Bush administration has committed the United States to a voluntary climate change strategy to reduce domestic GHG intensity - the ratio of emissions to economic output - by 18% through 2012. The EPACT established a Committee on Climate Change Technology to coordinate federal climate change activities and promote the development and deployment of GHG reducing technologies.

68



FirstEnergy cannot currently estimate the financial impact of climate change policies, although the potential restrictions on CO2 emissions could require significant capital and other expenditures. However, the CO2 emissions per kilowatt-hour of electricity generated by the Companies is lower than many regional competitors due to the Companies' diversified generation sources which include low or non-CO2 emitting gas-fired and nuclear generators.

Regulation of Hazardous Waste

The Companies have been named as PRPs at waste disposal sites, which may require cleanup under the Comprehensive Environmental Response, Compensation, and Liability Act of 1980. Allegations of disposal of hazardous substances at historical sites and the liability involved are often unsubstantiated and subject to dispute; however, federal law provides that all PRPs for a particular site are liable on a joint and several basis. Therefore, environmental liabilities that are considered probable have been recognized on the Consolidated Balance Sheet as of June 30, 2006, based on estimates of the total costs of cleanup, the Companies' proportionate responsibility for such costs and the financial ability of other unaffiliated entities to pay. In addition, JCP&L has accrued liabilities for environmental remediation of former manufactured gas plants in New Jersey. Those costs are being recovered by JCP&L through a non-bypassable SBC. Total liabilities of approximately $70 million have been accrued through June 30, 2006.

See Note 10(B) to the consolidated financial statements for further details and a complete discussion of environmental matters.

Other Legal Proceedings

Power Outages and Related Litigation

On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

69



FirstEnergy companies also are defending six separate complaint cases before the PUCO relating to the August 14, 2003 power outage. Two cases were originally filed in Ohio State courts but were subsequently dismissed for lack of subject matter jurisdiction and further appeals were unsuccessful. In these cases the individual complainants—three in one case and four in the other—sought to represent others as part of a class action. The PUCO dismissed the class allegations, stating that its rules of practice do not provide for class action complaints. Three other pending PUCO complaint cases were filed by various insurance carriers either in their own name as subrogees or in the name of their insured. In each of these three cases, the carrier seeks reimbursement from various FirstEnergy companies (and, in one case, from PJM, MISO and American Electric Power Company, Inc., as well) for claims paid to insureds for damages allegedly arising as a result of the loss of power on August 14, 2003. The listed insureds in these cases, in many instances, are not customers of any FirstEnergy company. The sixth case involves the claim of a non-customer seeking reimbursement for losses incurred when its store was burglarized on August 14, 2003. FirstEnergy filed a Motion to Dismiss on June 13, 2006. It is currently expected that this case will be summarily dismissed, although the Motion is still pending. On March 7, 2006, the PUCO issued a ruling applicable to all pending cases. Among its various rulings, the PUCO consolidated all of the pending outage cases for hearing; limited the litigation to service-related claims by customers of the Ohio operating companies; dismissed FirstEnergy as a defendant; ruled that the U.S.-Canada Power System Outage Task Force Report was not admissible into evidence; and gave the plaintiffs additional time to amend their complaints to otherwise comply with the PUCO’s underlying order. Also, most complainants, along with the FirstEnergy companies, filed applications for rehearing with the PUCO over various rulings contained in the March 7, 2006 order. On April 26, 2006, the PUCO granted rehearing to allow the insurance company claimants, as insurers, to prosecute their claims in their name so long as they also identify the underlying insured entities and the Ohio utilities that provide their service. The PUCO denied all other motions for rehearing. The plaintiffs in each case have since filed an amended complaint and the named FirstEnergy companies have answered and also have filed a motion to dismiss each action. These motions are pending. Additionally, on June 23, 2006, one of the insurance carrier complainants filed an appeal with the Ohio Supreme Court over the PUCO’s denial of their motion for rehearing on the issue of the admissibility of the Task Force Report and the dismissal of FirstEnergy Corp. as a respondent. Briefing is expected to be completed on this appeal by mid-September. It is unknown when the Supreme Court will rule on the appeal. No estimate of potential liability is available for any of these cases.

In addition to the above proceedings, FirstEnergy was named in a complaint filed in Michigan State Court by an individual who is not a customer of any FirstEnergy company. FirstEnergy's motion to dismiss the matter was denied on June 2, 2006. FirstEnergy has since filed an appeal, which is pending. A responsive pleading to this matter has been filed. Also, the complaint has been amended to include an additional party. No estimate of potential liability has been undertaken in this matter.

FirstEnergy was also named, along with several other entities, in a complaint in New Jersey State Court. The allegations against FirstEnergy were based, in part, on an alleged failure to protect the citizens of Jersey City from an electrical power outage. None of FirstEnergy’s subsidiaries serve customers in Jersey City. A responsive pleading has been filed. On April 28, 2006, the Court granted FirstEnergy's motion to dismiss. The plaintiff has not appealed.

FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Nuclear Plant Matters

On January 20, 2006, FENOC announced that it had entered into a deferred prosecution agreement with the U.S. Attorney’s Office for the Northern District of Ohio and the Environmental Crimes Section of the Environment and Natural Resources Division of the DOJ related to FENOC’s communications with the NRC during the fall of 2001 in connection with the reactor head issue at the Davis-Besse Nuclear Power Station. Under the agreement, which expires on December 31, 2006, the United States acknowledged FENOC’s extensive corrective actions at Davis-Besse, FENOC’s cooperation during investigations by the DOJ and the NRC, FENOC’s pledge of continued cooperation in any related criminal and administrative investigations and proceedings, FENOC’s acknowledgement of responsibility for the behavior of its employees, and its agreement to pay a monetary penalty. The DOJ will refrain from seeking an indictment or otherwise initiating criminal prosecution of FENOC for all conduct related to the statement of facts attached to the deferred prosecution agreement, as long as FENOC remains in compliance with the agreement, which FENOC fully intends to do. FENOC paid a monetary penalty of $28 million (not deductible for income tax purposes) which reduced First Energy's earnings by $0.09 per common share in the fourth quarter of 2005.

70



On April 21, 2005, the NRC issued a NOV and proposed a $5.45 million civil penalty related to the degradation of the Davis-Besse reactor vessel head issue discussed above. FirstEnergy accrued $2 million for a potential fine prior to 2005 and accrued the remaining liability for the proposed fine during the first quarter of 2005. On September 14, 2005, FENOC filed its response to the NOV with the NRC. FENOC accepted full responsibility for the past failure to properly implement its boric acid corrosion control and corrective action programs. The NRC NOV indicated that the violations do not represent current licensee performance. FirstEnergy paid the penalty in the third quarter of 2005. On January 23, 2006, FENOC supplemented its response to the NRC's NOV on the Davis-Besse head degradation to reflect the deferred prosecution agreement that FENOC had reached with the DOJ.

On August 12, 2004, the NRC notified FENOC that it would increase its regulatory oversight of the Perry Nuclear Power Plant as a result of problems with safety system equipment over the preceding two years and the licensee's failure to take prompt and corrective action. FENOC operates the Perry Nuclear Power Plant.

On April 4, 2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry Nuclear Power Plant as identified in the NRC's annual assessment letter to FENOC. Similar public meetings are held with all nuclear power plant licensees following issuance by the NRC of their annual assessments. According to the NRC, overall the Perry Plant operated "in a manner that preserved public health and safety" even though it remained under heightened NRC oversight. During the public meeting and in the annual assessment, the NRC indicated that additional inspections will continue and that the plant must improve performance to be removed from the Multiple/Repetitive Degraded Cornerstone Column of the Action Matrix.

On September 28, 2005, the NRC sent a CAL to FENOC describing commitments that FENOC had made to improve the performance at the Perry Plant and stated that the CAL would remain open until substantial improvement was demonstrated. The CAL was anticipated as part of the NRC's Reactor Oversight Process. In the NRC's 2005 annual assessment letter dated March 2, 2006 and associated meetings to discuss the performance of Perry on March 14, 2006, the NRC again stated that the Perry Plant continued to operate in a manner that "preserved public health and safety." However, the NRC also stated that increased levels of regulatory oversight would continue until sustained improvement in the performance of the facility was realized. If performance does not improve, the NRC has a range of options under the Reactor Oversight Process, from increased oversight to possible impact to the plant’s operating authority. Although FirstEnergy is unable to predict the impact of the ultimate disposition of this matter, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

As of December 16, 2005, NGC acquired ownership of the nuclear generation assets transferred from OE, CEI, TE and Penn with the exception of leasehold interests of OE and TE in certain of the nuclear plants that are subject to sale and leaseback arrangements with non-affiliates.

Other Legal Matters

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to FirstEnergy’s normal business operations pending against FirstEnergy and its subsidiaries. The other material items not otherwise discussed above are described below.

On October 20, 2004, FirstEnergy was notified by the SEC that the previously disclosed informal inquiry initiated by the SEC's Division of Enforcement in September 2003 relating to the restatements in August 2003 of previously reported results by FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have become the subject of a formal order of investigation. The SEC's formal order of investigation also encompasses issues raised during the SEC's examination of FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with this notification, FirstEnergy received a subpoena asking for background documents and documents related to the restatements and Davis-Besse issues. On December 30, 2004, FirstEnergy received a subpoena asking for documents relating to issues raised during the SEC's PUHCA examination. On August 24, 2005, additional information was requested regarding Davis-Besse related disclosures, which FirstEnergy has provided. FirstEnergy has cooperated fully with the informal inquiry and will continue to do so with the formal investigation.

On August 22, 2005, a class action complaint was filed against OE in Jefferson County, Ohio Common Pleas Court, seeking compensatory and punitive damages to be determined at trial based on claims of negligence and eight other tort counts alleging damages from W.H. Sammis Plant air emissions. The two named plaintiffs are also seeking injunctive relief to eliminate harmful emissions and repair property damage and the institution of a medical monitoring program for class members.


71


JCP&L's bargaining unit employees filed a grievance challenging JCP&L's 2002 call-out procedure that required bargaining unit employees to respond to emergency power outages. On May 20, 2004, an arbitration panel concluded that the call-out procedure violated the parties' collective bargaining agreement. At the conclusion of the June 1, 2005 hearing, the Arbitrator decided not to hear testimony on damages and closed the proceedings. On September 9, 2005, the Arbitrator issued an opinion to award approximately $16 million to the bargaining unit employees. On February 6, 2006, the federal court granted a Union motion to dismiss JCP&L's appeal of the award as premature. JCP&L will file its appeal again in federal district court once the damages associated with this case are identified at an individual employee level. JCP&L recognized a liability for the potential $16 million award in 2005.

The City of Huron filed a complaint against OE with the PUCO challenging the ability of electric distribution utilities to collect transition charges from a customer of a newly-formed municipal electric utility. The complaint was filed on May 28, 2003, and OE timely filed its response on June 30, 2003. In a related filing, the Ohio Companies filed for approval with the PUCO of a tariff that would specifically allow the collection of transition charges from customers of municipal electric utilities formed after 1998. Both filings were consolidated for hearing and decision described above. An adverse ruling could negatively affect full recovery of transition charges by the utility. Hearings on the matter were held in August 2005. Initial briefs from all parties were filed on September 22, 2005 and reply briefs were filed on October 14, 2005. On May 10, 2006, the PUCO issued its Opinion and Order dismissing the City’s complaint and approving the related tariffs, thus affirming OE’s entitlement to recovery of its transition charges. The City of Huron filed an application for rehearing of the PUCO’s decision on June 9, 2006 and OE filed a memorandum in opposition to that application on June 19, 2006. The PUCO denied the City’s application for rehearing on June 28, 2006. The City of Huron has 60 days from the denial of rehearing to appeal the PUCO’s decision.

If it were ultimately determined that FirstEnergy or its subsidiaries have legal liability or are otherwise made subject to liability based on the above matters, it could have a material adverse effect on FirstEnergy’s or its subsidiaries’ financial condition, results of operations and cash flows.

See Note 10(C) to the consolidated financial statements for further details and a complete discussion of these and other legal proceedings.

NEW ACCOUNTING STANDARDS AND INTERPRETATIONS

FSP FIN 46(R)-6 - “Determining the Variability to Be Considered in Applying FASB Interpretation No. 46(R)”

In April 2006, the FASB issued FSP FIN 46(R)-6 that addresses how a reporting enterprise should determine the variability to be considered in applying FASB Interpretation No. 46 (revised December 2003). FirstEnergy adopted FIN 46(R) in the first quarter of 2004, consolidating VIE’s when FirstEnergy or one of its subsidiaries is determined to be the VIE’s primary beneficiary. The variability that is considered in applying Interpretation 46(R) affects the determination of (a) whether the entity is a VIE; (b) which interests are variable interests in the entity; and (c) which party, if any, is the primary beneficiary of the VIE. This FSP states that the variability to be considered shall be based on an analysis of the design of the entity, involving two steps:


Step 1:
Analyze the nature of the risks in the entity
Step 2:
Determine the purpose(s) for which the entity was created and determine the variability the entity is designed to create and pass along to its interest holders.
.
After determining the variability to consider, the reporting enterprise can determine which interests are designed to absorb that variability. The guidance in this FSP is applied prospectively to all entities (including newly created entities) with which that enterprise first becomes involved and to all entities previously required to be analyzed under Interpretation 46(R) when a reconsideration event has occurred after July 1, 2006. FirstEnergy does not expect this Statement to have a material impact on its financial statements.

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. FirstEnergy is currently evaluating the impact of this Statement.

72



SUBSEQUENT EVENTS

Pennsylvania Law Change

On July 12, 2006, the Governor of Pennsylvania signed House Bill 859, which increases the net operating loss deduction allowed for the corporate net income tax from $2 million to $3 million, or the greater of 12.5% of taxable income. As a result, FirstEnergy expects to recognize a net operating loss benefit of $2.2 million (net of federal tax benefit) in the third quarter of 2006.

New Jersey Law Change

On July 8, 2006, the Governor of New Jersey signed tax legislation that increased the current New Jersey Corporate Business tax by an additional 4% surtax, which increases the effective tax from 9% to 9.36%. This increase applies to JCP&L’s 2006 through 2008 tax years and is not expected to have a material impact on FirstEnergy’s or JCP&L’s results of operations.

73


 
                          
CONSOLIDATED STATEMENTS OF INCOME AND COMPREHENSIVE INCOME
 
(Unaudited)
 
                          
                          
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
                          
   
2006
 
2005
 
2006
 
2005
 
                          
STATEMENTS OF INCOME
 
(In thousands)
 
                          
REVENUES
       
$
573,092
 
$
716,612
 
$
1,159,295
 
$
1,442,970
 
                                 
EXPENSES:
                               
Fuel
         
2,821
   
12,006
   
5,772
   
23,922
 
Purchased power
         
293,033
   
227,507
   
576,053
   
474,097
 
Nuclear operating costs
         
43,506
   
92,607
   
84,590
   
188,260
 
Other operating costs
         
91,604
   
95,589
   
182,414
   
178,768
 
Provision for depreciation
         
17,547
   
31,654
   
35,563
   
57,706
 
Amortization of regulatory assets
         
43,444
   
109,670
   
97,305
   
221,441
 
Deferral of new regulatory assets
         
(42,083
)
 
(39,026
)
 
(78,323
)
 
(63,821
)
General taxes
       
43,931
   
46,043
   
89,826
   
94,121
 
Total expenses
       
493,803
   
576,050
   
993,200
   
1,174,494
 
                                 
OPERATING INCOME
       
79,289
   
140,562
   
166,095
   
268,476
 
                                 
OTHER INCOME (EXPENSE):
                               
Investment income
         
32,818
   
22,482
   
65,860
   
43,089
 
Miscellaneous expense
         
(1,001
)
 
(2,161
)
 
(804
)
 
(23,897
)
Interest expense
         
(17,366
)
 
(21,402
)
 
(35,598
)
 
(39,605
)
Capitalized interest
         
643
   
3,006
   
1,134
   
5,241
 
Subsidiary's preferred stock dividend requirements
       
(155
)
 
(738
)
 
(311
)
 
(1,378
)
Total other income (expense)
       
14,939
   
1,187
   
30,281
   
(16,550
)
                                 
INCOME TAXES
       
35,019
   
94,653
   
73,337
   
148,073
 
                                 
NET INCOME
       
59,209
   
47,096
   
123,039
   
103,853
 
                                 
PREFERRED STOCK DIVIDEND REQUIREMENTS AND
                               
REDEMPTION PREMIUM
       
3,587
   
658
   
4,246
   
1,317
 
                                 
EARNINGS ON COMMON STOCK
       
$
55,622
 
$
46,438
 
$
118,793
 
$
102,536
 
                                 
                                 
                                 
                                 
                                 
STATEMENTS OF COMPREHENSIVE INCOME
                               
                                 
NET INCOME
       
$
59,209
 
$
47,096
 
$
123,039
 
$
103,853
 
                                 
OTHER COMPREHENSIVE INCOME (LOSS):
                               
Unrealized gain (loss) on available for sale securities
         
(4,063
)
 
(12,960
)
 
1,672
   
(15,677
)
Income tax expense (benefit) related to other
                               
     comprehensive income
       
(1,466
)
 
(4,546
)
 
603
   
(5,670
)
Other comprehensive income (loss), net of tax
       
(2,597
)
 
(8,414
)
 
1,069
   
(10,007
)
                                 
TOTAL COMPREHENSIVE INCOME
       
$
56,612
 
$
38,682
 
$
124,108
 
$
93,846
 
                                 
The preceding Notes to Consolidated Financial Statements as they relate to Ohio Edison Company are an integral part of these
statements.
                               
 
 
74

 
 
OHIO EDISON COMPANY
 
   
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
 
June 30,
 
December 31,
 
 
2006
 
2005
 
   
(In thousands)
 
ASSETS
           
CURRENT ASSETS:
           
Cash and cash equivalents
   
$
545,292
     
$
929
 
Receivables-
                   
Customers (less accumulated provisions of $8,627,000 and $7,619,000, respectively,
                   
for uncollectible accounts)
     
250,079
       
290,887
 
Associated companies
     
165,501
       
187,072
 
Other (less accumulated provisions of $52,000 and $4,000, respectively,
                   
for uncollectible accounts)
     
11,491
       
15,327
 
Notes receivable from associated companies
     
506,337
       
536,629
 
Prepayments and other
   
22,794
     
93,129
 
     
1,501,494
     
1,123,973
 
UTILITY PLANT:
                   
In service
     
2,558,212
       
2,526,851
 
Less - Accumulated provision for depreciation
   
996,261
     
984,463
 
       
1,561,951
       
1,542,388
 
Construction work in progress
     
63,277
     
58,785
 
     
1,625,228
     
1,601,173
 
OTHER PROPERTY AND INVESTMENTS:
                   
Long-term notes receivable from associated companies
     
1,676,228
       
1,758,776
 
Investment in lease obligation bonds
     
310,285
       
325,729
 
Nuclear plant decommissioning trusts
     
106,360
       
103,854
 
Other
   
40,968
     
44,210
 
     
2,133,841
     
2,232,569
 
DEFERRED CHARGES AND OTHER ASSETS:
                   
Regulatory assets
     
756,481
       
774,983
 
Prepaid pension costs
     
227,815
       
224,813
 
Property taxes
     
52,897
       
52,875
 
Unamortized sale and leaseback costs
     
52,637
       
55,139
 
Other
   
26,988
     
31,752
 
     
1,116,818
     
1,139,562
 
     
$
6,377,381
     
$
6,097,277
 
LIABILITIES AND CAPITALIZATION
                   
CURRENT LIABILITIES:
                   
Currently payable long-term debt
   
$
225,625
     
$
280,255
 
Short-term borrowings-
                   
Associated companies
     
2,161
       
57,715
 
Other
     
22,431
       
143,585
 
Accounts payable-
                   
Associated companies
     
123,912
       
172,511
 
Other
     
12,312
       
9,607
 
Accrued taxes
     
173,248
       
163,870
 
Accrued interest
     
7,150
       
8,333
 
Other
   
64,098
     
61,726
 
     
630,937
     
897,602
 
CAPITALIZATION:
                   
Common stockholder's equity-
                   
Common stock, without par value, authorized 175,000,000 shares - 100 shares outstanding
     
2,296,525
       
2,297,253
 
Accumulated other comprehensive income
     
5,163
       
4,094
 
Retained earnings
   
285,434
     
200,844
 
Total common stockholder's equity
     
2,587,122
       
2,502,191
 
Preferred stock not subject to mandatory redemption
     
60,965
       
60,965
 
Preferred stock of consolidated subsidiary not subject to mandatory redemption
     
14,105
       
14,105
 
Long-term debt and other long-term obligations
   
1,521,863
     
1,019,642
 
     
4,184,055
     
3,596,903
 
NONCURRENT LIABILITIES:
                   
Accumulated deferred income taxes
     
747,568
       
769,031
 
Accumulated deferred investment tax credits
     
22,307
       
24,081
 
Asset retirement obligation
     
85,578
       
82,527
 
Retirement benefits
     
294,755
       
291,051
 
Deferred revenues - electric service programs
     
104,855
       
121,693
 
Other
   
307,326
     
314,389
 
     
1,562,389
     
1,602,772
 
COMMITMENTS AND CONTINGENCIES (Note 10)
           
     
$
6,377,381
     
$
6,097,277
 
                     
The preceding Notes to Consolidated Financial Statements as they relate to Ohio Edison Company are an integral part of these balance
sheets.
           
 
 
75

 

OHIO EDISON COMPANY
 
                
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
                
       
Six Months Ended
 
       
June 30,  
 
       
 Restated
     
   
 
 
2006
 
2005
 
   
(In thousands)
 
                
CASH FLOWS FROM OPERATING ACTIVITIES:
              
Net income
       
$
123,039
 
$
103,853
 
Adjustments to reconcile net income to net cash from operating activities -
                   
Provision for depreciation
         
35,563
   
57,706
 
Amortization of regulatory assets
         
97,305
   
221,441
 
Deferral of new regulatory assets
         
(78,323
)
 
(63,821
)
Nuclear fuel and lease amortization
         
721
   
18,663
 
Amortization of lease costs
         
(4,334
)
 
(2,952
)
Deferred income taxes and investment tax credits, net
         
(17,351
)
 
(5,142
)
Accrued compensation and retirement benefits
         
930
   
3,504
 
Decrease (increase) in operating assets -
                   
Receivables
         
66,215
   
77,745
 
Materials and supplies
         
-
   
(18,149
)
Prepayments and other current assets
         
(7,913
)
 
(7,220
)
Increase (decrease) in operating liabilities -
                   
Accounts payable
         
(45,894
)
 
(85,227
)
Accrued taxes
         
9,378
   
19,078
 
Accrued interest
         
(1,183
)
 
(791
)
Electric service prepayment programs
         
(16,838
)
 
132,151
 
Other
         
(8,772
)
 
12,876
 
Net cash provided from operating activities
       
152,543
   
463,715
 
                     
CASH FLOWS FROM FINANCING ACTIVITIES:
                   
New Financing -
                   
Long-term debt
         
599,778
   
146,450
 
Short-term borrowings, net
         
-
   
47,442
 
Redemptions and Repayments -
                   
Preferred stock
         
-
   
(37,750
)
Long-term debt
         
(145,316
)
 
(260,508
)
Short-term borrowings, net
         
(176,708
)
 
-
 
Dividend Payments -
                   
Common stock
         
(35,000
)
 
(177,000
)
Preferred stock
         
(1,317
)
 
(1,317
)
Net cash provided from (used for) financing activities
       
241,437
   
(282,683
)
                     
CASH FLOWS FROM INVESTING ACTIVITIES:
                   
Property additions
         
(63,294
)
 
(121,458
)
Proceeds from nuclear decommissioning trust fund sales
         
30,269
   
122,374
 
Investments in nuclear decommissioning trust funds
         
(30,961
)
 
(138,144
)
Loan repayments from (loans to) associated companies, net
         
112,840
   
(58,540
)
Cash investments
         
78,248 
   
 
Other
         
23,281 
   
14,789 
 
Net cash provided from (used for) investing activities
       
150,383
   
(180,979
)
                     
Net increase in cash and cash equivalents
         
544,363
   
53
 
Cash and cash equivalents at beginning of period
         
929
   
1,230
 
Cash and cash equivalents at end of period
       
$
545,292
 
$
1,283
 
 
                   
The preceding Notes to Consolidated Financial Statements as they relate to Ohio Edison Company are an integral part of these statements. 
 
76

 
 
 
 
 
 
Report of Independent Registered Public Accounting Firm



To the Stockholder and Board of
Directors of Ohio Edison Company:

We have reviewed the accompanying consolidated balance sheet of Ohio Edison Company and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statements of cash flows for the six-month periods ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.

As described in the section entitled "Restatement of the Consolidated Statements of Cash Flows" included in Note 1 to the consolidated interim financial statements, the Company has restated its previously issued consolidated interim financial statements for the quarter ended June 30, 2006.
 
We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 and conditional asset retirement obligations as of December 31, 2005 as discussed in Note 2(G) and Note 11 to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.

 
PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006, except as to Note 1, which is as of October 31, 2006




77


OHIO EDISON COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


OE is a wholly owned electric utility subsidiary of FirstEnergy. OE and its wholly owned subsidiary, Penn, conduct business in portions of Ohio and Pennsylvania, providing regulated electric distribution services. Penn’s rate restructuring plan and its associated transition charge revenue recovery was completed in 2005. The OE Companies also provide generation services to those customers electing to retain the OE Companies as their power supplier. Power supply requirements of the OE Companies are provided by FES - an affiliated company.

FirstEnergy Intra-System Generation Asset Transfers

In 2005, the Ohio Companies and Penn entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively. The generating plant interests transferred did not include OE's leasehold interests in certain of the plants that are currently subject to sale and leaseback arrangements with non-affiliates.

On October 24, 2005, the OE Companies completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.

On December 16, 2005, the OE Companies completed the intra-system transfer of their ownership interests in the nuclear generation assets to NGC through an asset spin-off in the form of a dividend. FENOC continues to operate and maintain the nuclear generation assets.

These transactions were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants.

The transfers affect the OE Companies' comparative earnings results with reductions in both revenues and expenses. Revenues are reduced due to the termination of certain arrangements with FES, under which the OE Companies previously sold their nuclear-generated KWH to FES and leased their non-nuclear generation assets to FGCO, a subsidiary of FES. Their expenses are lower due to the nuclear fuel and operating costs assumed by NGC as well as depreciation and property tax expenses assumed by FGCO and NGC related to the transferred generating assets. With respect to OE's retained leasehold interests in the Perry Plant and Beaver Valley Unit 2, OE has continued the nuclear-generated KWH sales arrangement with FES for the associated output and continues to be obligated on the applicable portion of expenses related to those interests. In addition, the OE Companies receive interest income on associated company notes receivable from the transfer of their generation net assets. FES will continue to provide OE’s PLR requirements under revised purchased power arrangements for the three-year period beginning January 1, 2006 and Penn’s during 2006 (see Outlook - Regulatory Matters).




78


The effects on the OE Companies' results of operations in the second quarter and first six months of 2006 as compared to the same periods of 2005 from the generation asset transfers (also reflecting OE's retained leasehold interests discussed above) are summarized in the following table:

Intra-System Generation Asset Transfers
Income Statement Effects
 
Three Months
   
Six Months
 
Increase (Decrease)
 
(In millions)
 
Revenues:
           
Non-nuclear generating units rent
(a)
 $
(44)
   
 $
(89)
 
Nuclear generated KWH sales
(b)
 
 (67)
   
 
 (131)
 
Total - Revenues Effect
   
(111)
     
(220)
 
Expenses:
               
Fuel costs - nuclear
(c)
 
(9)
     
(18)
 
Nuclear operating costs
(c)
 
(43)
     
(89)
 
Provision for depreciation
(d)
 
(17)
     
(28)
 
General taxes
(e)
 
(3)
     
(6)
 
Total - Expenses Effect
   
(72)
     
(141)
 
Operating Income Effect
   
(39)
     
(79)
 
Other Income:
               
Interest income from notes receivable
(f)
 
14
     
30
 
Nuclear decommissioning trust earnings
(g)
 
(4)
     
(6)
 
Capitalized Interest
(h)
 
(2)
   
 
 (4)
 
Total - Other Income Effect
 
 
 8
   
 
 20
 
Income taxes
(i)
 
(13)
     
(24)
 
Net Income Effect
 
 $
(18)
   
 $
 (35)
 
                 
(a) Elimination of non-nuclear generation assets lease to FGCO.
(b) Reduction of nuclear generated wholesale KWH sales to FES.
(c) Reduction of nuclear fuel and operating costs.
(d) Reduction of depreciation expense and asset retirement obligation accretion related to generation assets.
(e) Reduction of property tax expense on generation assets.
(f) Interest income on associated company notes receivable from the transfer of generation net assets.
(g) Reduction of earnings on nuclear decommissioning trusts.
(h) Reduction of allowance for borrowed funds used during construction on nuclear capital expenditures.
(i) Income tax effect of the above adjustments.

Restatement of Consolidated Statement of Cash Flows

As further discussed in Note 1 to the Consolidated Financial Statements, OE is restating its Consolidated Statement of Cash Flows for the six months ended June 30, 2006. This corrects a misclassification of a $78 million cash receipt from the liquidation of cash investments (restricted cash related to the 2005 generation asset transfers) in the first quarter of 2006 and the termination of a lease arrangement in the second quarter of 2006. The cash receipt was previously reported in cash flows from operating activities and should have been reported in cash flows from investing activities. This correction resulted in a $78 million decrease in the previously reported cash flows from operating activities and a corresponding increase in cash flows from investing activities in OE’s Consolidated Statements of Cash Flows for the six months ended June 30, 2006. The second quarter of 2006 also included an immaterial misclassification of a non-cash item related to OE’s termination of a capital lease. This lease arrangement termination was previously reported as a $12 million use of cash under “Nuclear fuel and lease amortization” in cash flows from operating activities, a $2 million use of cash under “Redemptions and repayments” in cash flows from financing activities and a $14 million source of cash under “Property additions” in cash flows used for investing activities. However, this non-cash transaction should not have been reflected in the statements of cash flows. This correction on resulted in a $12 million increase in cash flows from operating activities, a $2 million increase in cash from financing activities and a $14 million increase in cash used for investing activities. These corrections resulted in revisions in the previously reported Management’s Discussion and Analysis of Results of Operations only to Capital Resources and Liquidity under the Cash Flows From Operating Activities, Cash Flows From Financing Activities and Cash Flows From Investing Activities sections. The restatement does not change OE’s previously reported consolidated statements of income and comprehensive income for the three months and six months ended June 30, 2006 or its consolidated balance sheet as of June 30, 2006.

79

 
Results of Operations

Earnings on common  stock in the  second  quarter of 2006  increased  to  $56  million  from $46  million  in  the  second  quarter of 2005.   In the first six months of 2006, arnings on common stock increased to $119 million from $103 million in the same period of 2005. The increase in earnings in both periods of 2006 primarily resulted from lower expenses and increased other income, partially offset by lower revenues principally from the asset transfer effects shown in the table above. Earnings in both periods of 2005 were also reduced by a one-time income tax charge of $36 million from the enactment of tax legislation in Ohio. Earnings in the first six months of 2005 was additionally reduced by charges relating to a $8.5 million civil penalty payable to the Department of Justice and $10 million for environmental projects in connection with the Sammis Plant settlement (see Outlook — Environmental Matters).

Revenues

Revenues decreased by $144 million or 20.0% in the second quarter of 2006 compared with the same period in 2005, primarily due to the generation asset transfer impact summarized in the table above. Excluding the effects of the asset transfer, revenues in the second quarter of 2006 decreased $33 million, primarily due to decreases of $70 million and $112 million in wholesale sales and distribution revenues, respectively, partially offset by increases in retail generation revenues of $125 million and reduced customer shopping incentives of $21 million.

In the first six months of 2006 compared with the same period in 2005, revenues decreased by $284 million or 19.7%, primarily from the generation asset transfer impact summarized in the table above. Excluding the effects of the asset transfer, revenues in the first six months of 2006 decreased $64 million, primarily due to decreases of $130 million and $210 million in wholesale sales and distribution revenues, respectively, partially offset by increases in retail generation revenues of $232 million and reduced customer shopping incentives of $38 million.

The lower wholesale revenues in both periods of 2006 reflect the termination of a non-affiliated wholesale sales agreement and the cessation of the MSG sales arrangements under OE’s transition plan in December 2005. OE had been required to provide the MSG to non-affiliated alternative suppliers.

Changes in electric generation KWH sales and revenues in the second quarter and first six months of 2006 from the corresponding periods of 2005 are summarized in the following table.

Changes in Generation KWH Sales
 
Three Months
 
Six Months
 
Increase (Decrease)
 
 
 
 
 
Electric Generation:
 
 
 
 
 
Retail
 
 
13.8
%
 
12.5
%
Wholesale
 
 
(84.2)
%
 
(82.8)
%
Net Decrease in Generation Sales
 
 
(31.4)
%
 
(29.7)
%
 
 
 
Three Months
 
Six Months
 
   
(In millions)
 
Retail Generation:
 
 
 
 
 
 Residential  $   41     $ 84   
 Commercial     38     70   
 Industrial     46      78   
 Total Retail Generation     125      232   
 Wholesale     (70)      (130 
Net Decrease in Generation Revenues
 
 
55
 
$
102
 
 
      Increased retail generation revenues for the second quarter of 2006 as shown in the table above resulted from higher KWH sales and higher unit prices. The increase in generation KWH sales primarily resulted from decreased customer shopping, as the percentage of generation services provided by alternative suppliers to total sales delivered in OE's service area decreased by: residential - 10.4 percentage points; commercial - 12.5 percentage points; and industrial - 11.2 percentage points. The decrease in shopping resulted from certain alternative energy suppliers terminating their supply arrangements with OE’s shopping customers in the fourth quarter of 2005. Higher unit prices for generation reflected the rate stabilization charge and the fuel recovery rider that both became effective in the first quarter of 2006 under provisions of the RSP and RCP.

80

 
      Retail generation revenues increased in the first six months of 2006 compared to the same period of 2005 for the reasons described above. The increase in generation KWH sales primarily resulted from a decrease in customer shopping, as the percentage of generation services provided by alternative suppliers to total sales delivered in OE's service area decreased by: residential - 9.5 percentage points; commercial - 11.8 percentage points; and industrial - 10.2 percentage points. Higher unit prices for generation reflected the impact of the RSP and RCP described above.

        Changes in distribution KWH deliveries and revenues in the second quarter and first six months of 2006 from the corresponding periods of 2005 are summarized in the following table.

Changes in Distribution KWH Deliveries
 
Three Months
 
Six Months
 
Increase (Decrease)
 
 
 
 
 
Distribution Deliveries:
 
 
 
 
 
 
 
Residential
 
 
(6.3)
%
 
(3.8)
%
Commercial
 
 
(2.2)
%
 
(1.6)
%
Industrial
 
 
2.7
%
 
0.5
%
Net Decrease in Distribution Deliveries
 
 
(1.7)
%
 
(1.6)
%
 
 
 
Changes in Distribution KWH Deliveries
 
Three Months
 
Six Months
 
Increase (Decrease)
 
 
 
 
 
Residential
 
 
(48
)    
 
(88)
 
Commercial
 
 
(34
)
 
(65
)
Industrial
 
 
(30
)
 
(57
)
Net Decrease in Distribution Deliveries
 
$
(112
)
$
(210
)
 
        Lower distribution throughput revenues as shown in the table above in the second quarter and first six months of 2006 reflects lower composite prices and reduced KWH deliveries. The lower unit prices in both periods were due to the completion of the generation-related transition cost recovery under the OE Companies’ respective rate restructuring plans in 2005, partially offset by increased transmission rates to recover MISO costs beginning in 2006 (see Outlook - Regulatory Matters). Lower distribution KWH deliveries to residential and commercial customers reflected the impact of milder weather conditions in the second quarter and first six months of 2006, compared to the same periods of 2005. KWH deliveries to industrial customers increased slightly in both periods due to the recovering steel industry in the OE Companies’ service territory.

Under the Ohio transition plan, OE had provided incentives to customers to encourage switching to alternative energy providers, which reduced OE’s revenues by $21 million in the second quarter of 2005 and $38 million in the first six months of 2005. These revenue reductions, which were deferred for future recovery and did not affect earnings, ceased in 2006. The deferred shopping incentives (Extended RTC) are now being recovered under the RCP (see Outlook - Regulatory Matters).

Expenses

Total expenses decreased by $82 million in the second quarter of 2006 and $181 million in the first six months of 2006 from the same periods of 2005 principally due to the effects of the generation asset transfer shown in the table above. Excluding the asset transfer effects, the following table presents changes from the prior year by expense category.


Expenses - Changes
 
Three Months
 
Six Months
Increase (Decrease)
 
(In millions)
Purchased power costs
 
$
66
 
$
102
 
Nuclear operating costs
 
 
(6
)
 
(14
)
Other operating costs
 
 
(4
)
 
4
 
Provision for depreciation
   
2
   
6
 
Amortization of regulatory assets
   
(66
)
 
(124
)
Deferral of new regulatory assets
   
(3
)
 
(15
)
General taxes
 
 
1
 
 
2
 
Net decrease in expenses
 
$
(10
)
$
(39
)
 
 
 
 
 
 
 
 

81

 
 
        Increased purchased power costs in the second quarter and first six months of 2006 reflected higher unit prices associated with the new power supply agreement with FES, partially offset by a decrease in KWH purchased to meet the lower net generation sales requirements. Excluding the effects of the generation asset transfers, the lower nuclear operating costs for OE’s nuclear leasehold interests were primarily due to the absence in 2006 of the Beaver Valley Unit 2 refueling outage and Perry Nuclear Power Plant scheduled refueling outage (including an unplanned extension) that was completed on May 6, 2005. The decrease in other operating costs during the second quarter of 2006 was primarily due to lower associated company (FES) transmission expenses as a result of alternative energy suppliers terminating their supply arrangements with OE’s shopping customer in the fourth quarter of 2005. The increase in other operating costs in the first six months of 2006 was primarily due to increased transmission expenses related to MISO Day 2 operations that began on April 1, 2005.
 
        Excluding the effects of the generation asset transfers, higher depreciation expense in the second quarter and first six months of 2006 reflected capital additions subsequent to the second quarter of 2005. Lower amortization of regulatory assets in both periods was due to the completion of the generation-related transition cost amortization under the OE Companies' respective transition plans, partially offset by the amortization of deferred MISO costs being recovered in 2006. The higher deferrals of new regulatory assets in the second quarter and first six months of 2006 primarily resulted from the deferral of fuel ($14 million and $25 million, respectively) and distribution costs ($22 million and $39 million, respectively) under the RCP, partially offset by lower MISO cost deferrals ($12 million and $11 million, respectively) and the decrease in shopping incentive deferrals ($21 million and $38 million, respectively) which ceased in 2006 under the Ohio transition plan. The deferral of interest on the unamortized shopping incentive balances continues under the RCP.

Excluding the effects of the generation asset transfers, higher general taxes in both periods reflects the phase-in of the Ohio commercial activity tax that became effective July 1, 2005.

Other Income

Other income increased $14 million in the second quarter of 2006 and $47 million in the first six months of 2006 as compared with the same periods of 2005, primarily due to the effects of the generation asset transfers. Excluding the effects of the generation asset transfers, the $5 million increase in the second quarter is primarily due to lower interest expense, reflecting debt redemptions subsequent to the second quarter of 2005.

Excluding the effects of the generation asset transfers, the $28 million increase in the first six months is primarily due to lower interest expense and the absence in 2006 of the 2005 charges of $8.5 million for a civil penalty payable to the DOJ and $10 million for environmental projects in connection with the Sammis New Source Review settlement (see Outlook - Environmental Matters).

Income Taxes

Income taxes decreased $60 million in the second quarter of 2006 and $75 million in the first six months of 2006 compared with the same periods of 2005. Excluding the effects of the generation asset transfer, income taxes decreased $47 million in the second quarter of 2006 and $50 million in the first six months of 2006. As a result of new Ohio tax legislation in 2005, OE wrote off $36 million in net deferred tax benefits in the second quarter of 2005. The remainder of the net change in both the second quarter and the six-month period was mainly due to an increase in taxable income, partially offset by a reduction in the tax rates due to the continuing phase-out of the income-based Ohio franchise tax.

Capital Resources and Liquidity

OE’s cash requirements in 2006 for operating expenses, construction expenditures and scheduled debt maturities are expected to be met with cash from operations, short-term credit arrangements and funds from capital markets. OE repurchased $500 million of common stock from FirstEnergy and redeemed $64 million of preferred stock in July 2006 with proceeds of senior notes issued in June 2006. Available borrowing capacity under credit facilities will be used to manage working capital requirements.

Changes in Cash Position

OE had $545 million of cash and cash equivalents as of June 30, 2006 compared with $1 million as of December 31, 2005. The major sources for changes in these balances are summarized below.

82

 
    Cash Flows From Operating Activities

Cash provided from operating activities of $153 million (as restated) during the first six months of 2006, compared with the corresponding period in 2005, was as follows:

 
 
 
Six Months Ended
 
 
 
 
June 30,
 
 Operating Cash Flows
 
 
2006
 
2005
 
       
(In millions)
 
Cash earnings (1)k
 
 
$
141
 
$
329
 
Working capital and other
 
 
 
12
 
 
135
 
Net cash provided from operating activities
 
 
$
153
 
$
464
 
(1) Cash earnings are a non-GAAP measure (see reconciliation below).
 
 
 
 
 
 
 
 

Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. OE believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income:
 
   
Six Months Ended
 
 
 
June 30,
 
Reconciliation of Cash Earnings
 
2006
 
2005
 
     
(In millions)
 
Net income (GAAP)
 
$
123
 
$
104
 
Non-cash charges (credits):
 
 
   
 
 
 
Provision for depreciation
 
 
36
 
 
58
 
Amortization of regulatory assets
 
 
97
 
 
221
 
Deferral of new regulatory assets
 
 
(78
)
 
(64
)
Nuclear fuel and capital lease amortization
 
 
1
 
 
19
 
Amortization of electric service obligation
   
(17
)
 
(4
)
Amortization of lease costs
   
(4
)
 
(3
)
Deferred income taxes and investment tax credits, net
 
 
(17
)
 
(5
)
Accrued compensation and retirement benefits
 
 
--
 
 
3
 
Cash earnings (Non-GAAP)
 
$
141
 
$
329
 
 
 
 
 
 
 
 
 

Net cash provided from operating activities decreased $311 million in the first six months of 2006, compared with the same period in 2005, due to a $123 million decrease from changes in working capital and a $188 million decrease in cash earnings as described above under “Results from Operations.” The decrease in working capital primarily reflects the absence in 2006 of $136 million in funds received for the Energy for Education program in 2005, partially offset by changes in accounts payable of $39 million.

Cash Flows From Financing Activities

Net cash provided from financing activities increased to $241 million (as restated) in the first six months of 2006 from $283 million used for financing activities in the first six months of 2005. The increase primarily reflected more long-term debt financing, and decreases of $153 million in redemptions of preferred stock and long-term debt and $142 million in common stock dividend payments to FirstEnergy, partially offset by higher repayments of short-term borrowings to associated companies.

OE had approximately $1.1 billion of cash and temporary cash investments (which include short-term notes receivable from associated companies) and $25 million of short-term indebtedness as of June 30, 2006. OE has authorization from the PUCO to incur short-term debt of up to $500 million, which is available through the bank facility and the utility money pool described below. Penn has authorization from the SEC, continued by FERC rules adopted as a result of EPACT's repeal of PUHCA, to incur short-term debt up to its charter limit of $44 million as of June 30, 2006, and also has access to the bank facility and the utility money pool.

OES Capital is a wholly owned subsidiary of OE whose borrowings are secured by customer accounts receivable purchased from OE. OES Capital can borrow up to $170 million under a receivables financing arrangement. As a separate legal entity with separate creditors, OES Capital would have to satisfy its obligations to creditors before any of its remaining assets could be made available to OE. As of June 30, 2006, the facility was not drawn.

83

 
        Penn Power Funding LLC (Penn Funding), a wholly owned subsidiary of Penn, is a limited liability company whose borrowings are secured by customer accounts receivable purchased from Penn. Penn Funding can borrow up to $25 million under a receivables financing arrangement which expires July 28, 2007. As a separate legal entity with separate creditors, Penn Funding would have to satisfy its obligations to creditors before any of its remaining assets could be made available to Penn. As of June 30, 2006, the facility was drawn for $19 million.

As of June 30, 2006, OE and Penn had the aggregate capability to issue approximately $592 million of additional FMB on the basis of property additions and retired bonds under the terms of their respective mortgage indentures. The issuance of FMB by OE is also subject to provisions of its senior note indenture generally limiting the incurrence of additional secured debt, subject to certain exceptions that would permit, among other things, the issuance of secured debt (including FMB) (i) supporting pollution control notes or similar obligations, or (ii) as an extension, renewal or replacement of previously outstanding secured debt. In addition, OE is permitted under the indenture to incur additional secured debt not otherwise permitted by a specified exception of up to $735 million as of June 30, 2006. Based upon applicable earnings coverage tests in their respective charters, OE and Penn could issue a total of $2.7 billion of preferred stock (assuming no additional debt was issued) as of June 30, 2006. As a result of OE redeeming all of its outstanding preferred stock on July 7, 2006, the applicable earnings coverage test is inoperable for OE. In the event that OE issues preferred stock in the future, the applicable earnings coverage test will govern the amount of additional preferred stock that OE may issue.

        As of June 30, 2006, OE had approximately $400 million of capacity remaining unused under its existing shelf registration.

FirstEnergy, OE, Penn, CEI, TE, JCP&L, Met-Ed, Penelec, FES and ATSI, as Borrowers, have entered into a syndicated $2 billion five-year revolving credit facility with a syndicate of banks that expires in June 2010. Borrowings under the facility are available to each Borrower separately and mature on the earlier of 364 days from the date of borrowing or the commitment termination date, as the same may be extended. OE's borrowing limit under the facility is $500 million and Penn’s is $50 million, subject in each case to applicable regulatory approvals.

Under the revolving credit facility, borrowers may request the issuance of LOCs expiring up to one year from the date of issuance. The stated amount of outstanding LOCs will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit. Total unused borrowing capability under existing credit facilities and accounts receivable financing facilities totaled $726 million as of June 30, 2006.

The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, debt to total capitalization as defined under the revolving credit facility was 40% for OE and 34% for Penn.

The facility does not contain any provisions that either restricts the ability of OE and Penn to borrow or accelerate repayment of outstanding advances as a result of any change in credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to OE’s and Penn’s credit ratings.

       OE and Penn have the ability to borrow from their regulated affiliates and FirstEnergy to meet their short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving a loan under the money pool agreements must repay the principal amount, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings in the first six months of 2006 was 4.86%.

OE’s access to the capital markets and the costs of financing are influenced by the ratings of its securities. The ratings outlook from S&P on all securities is stable. The ratings outlook from Moody's and Fitch on all securities is positive.

On April 3, 2006, pollution control notes that were formerly obligations of OE and Penn were refinanced and became obligations of FGCO and NGC. The proceeds from the refinancings were used to repay a portion of their associated company notes payable to Penn and OE. With those repayments, OE redeemed $74.8 million and Penn redeemed $6.95 million of pollution control notes having variable interest rates.

Cash Flows From Investing Activities

Net cash provided from investing activities was $150 million (as restated) in the first six months of 2006 compared to $181 million used for investing activities in the first six months of 2005. The change resulted primarily from a $171 million increase in loan repayments from associated companies, $78 million from the liquidation of cash investments and a $58 million decrease in property additions, which reflects the impact of the generation asset transfers.

84

 
        During the second half of 2006, capital requirements for property additions and capital leases are expected to be approximately $46 million. OE has additional requirements of approximately $2 million to meet requirements for maturing long-term debt during the remainder of 2006. These cash requirements are expected to be satisfied from a combination of internal cash and short-term credit arrangements. OE’s capital spending for the period 2006-2010 is expected to be approximately $624 million, of which approximately $108 million applies to 2006.

Off-Balance Sheet Arrangements

Obligations not included on OE’s Consolidated Balance Sheets primarily consist of sale and leaseback arrangements involving Perry Unit 1 and Beaver Valley Unit 2. The present value of these operating lease commitments, net of trust investments, was $640 million as of June 30, 2006.

Equity Price Risk

Included in OE’s nuclear decommissioning trust investments are marketable equity securities carried at their market value of approximately $70 million and $67 million as of June 30, 2006 and December 31, 2005, respectively. A hypothetical 10% decrease in prices quoted by stock exchanges would result in a $7 million reduction in fair value as of June 30, 2006. Changes in the fair value of these investments are recorded in OCI unless recognized as a result of a sale or recognized as regulatory assets or liabilities.

Outlook

The electric industry continues to transition to a more competitive environment and all of the OE Companies’ customers can select alternative energy suppliers. The OE Companies continue to deliver power to residential homes and businesses through their existing distribution system, which remains regulated. Customer rates have been restructured into separate components to support customer choice. In Ohio and Pennsylvania, the OE Companies have a continuing responsibility to provide power to those customers not choosing to receive power from an alternative energy supplier subject to certain limits.

Regulatory Matters

Regulatory assets and liabilities are costs which have been authorized by the PUCO, the PPUC and the FERC for recovery from or credit to customers in future periods or for which authorization is probable. Without the probability of such authorization, costs currently recorded as regulatory assets and liabilities would have been charged to income as incurred. All regulatory assets are expected to be recovered under the provisions of the OE Companies’ transition plans and rate restructuring plans. OE‘s regulatory assets were $756 million and $775 million as of June 30, 2006 and December 31, 2005, respectively. Penn had net regulatory liabilities of $59 million as of June 30, 2006 and December 31, 2005, which are included in Other Noncurrent Liabilities on the Consolidated Balance Sheets as of June 30, 2006 and December 31, 2005.

On October 21, 2003 the Ohio Companies filed their RSP case with the PUCO. On August 5, 2004, the Ohio Companies accepted the RSP as modified and approved by the PUCO in an August 4, 2004 Entry on Rehearing, subject to a CBP. The RSP was intended to establish generation service rates beginning January 1, 2006, in response to the PUCO’s concerns about price and supply uncertainty following the end of the Ohio Companies' transition plan market development period. In October 2004, the OCC and NOAC filed appeals with the Supreme Court of Ohio to overturn the original June 9, 2004 PUCO order in the proceeding as well as the associated entries on rehearing. On September 28, 2005, the Supreme Court of Ohio heard oral arguments on the appeals. On May 3, 2006, the Supreme Court of Ohio issued an opinion affirming the PUCO's order with respect to the approval of the rate stabilization charge, approval of the shopping credits, the granting of interest on shopping credit incentive deferral amounts, and approval of the Ohio Companies’ financial separation plan. It remanded one matter back to the PUCO for further consideration of the issue as to whether the RSP, as adopted by the PUCO, provided for sufficient means for customer participation in the competitive marketplace. On May 12, 2006, the Ohio Companies filed a Motion for Reconsideration with the Supreme Court of Ohio which was denied by the Court on June 21, 2006. The RSP contained a provision that permitted the Ohio Companies to withdraw and terminate the RSP in the event that the PUCO, or the Supreme Court of Ohio, rejected all or part of the RSP. In such event, the Ohio Companies have 30 days from the final order or decision to provide notice of termination. On July 20, 2006 the Ohio Companies filed with the PUCO a Request to Initiate a Proceeding on Remand. In their Request, the Ohio Companies provided notice of termination to those provisions of the RSP subject to termination, subject to being withdrawn, and also set forth a framework for addressing the Supreme Court of Ohio’s findings on customer participation, requesting the PUCO to initiate a proceeding to consider the Ohio Companies’ proposal. If the PUCO approves a resolution to the issues raised by the Supreme Court of Ohio that is acceptable to the Ohio Companies, the Ohio Companies’ termination will be withdrawn and considered to be null and void. Separately, the OCC and NOAC also submitted to the PUCO on July 20, 2006 a conceptual proposal dealing with the issue raised by the Supreme Court of Ohio. On July 26, 2006, the PUCO issued an Entry acknowledging the July 20, 2006 filings of the Ohio Companies and the OCC and NOAC, and giving the Ohio Companies 45 days to file a plan in a new docket to address the Court’s concern.

85

 
        The Ohio Companies filed an application and stipulation with the PUCO on September 9, 2005 seeking approval of the RCP. On November 4, 2005, the Ohio Companies filed a supplemental stipulation with the PUCO, which constituted an additional component of the RCP filed on September 9, 2005. Major provisions of the RCP include:

 
 
Maintaining the existing level of base distribution rates through December 31, 2008 for OE;
     
 
Deferring and capitalizing for future recovery (over a 25-year period) with carrying charges certain distribution costs to be incurred by all of the Ohio Companies during the period January 1, 2006 through December 31, 2008, not to exceed $150 million in each of the three years;
     
 
Adjusting the RTC and extended RTC recovery periods and rate levels so that full recovery of authorized costs will occur as of December 31, 2008 for OE;
     
 
Reducing the deferred shopping incentive balances as of January 1, 2006 by up to $75 million for OE by accelerating the application of its accumulated cost of removal regulatory liability; and
     
 
Recovering increased fuel costs (compared to a 2002 baseline) of up to $75 million, $77 million, and $79 million, in 2006, 2007, and 2008, respectively, from all OE and TE distribution and transmission customers through a fuel recovery mechanism. The Ohio Companies may defer and capitalize (for recovery over a 25-year period) increased fuel costs above the amount collected through the fuel recovery mechanism.

The following table provides OE’s estimated net amortization of regulatory transition costs and deferred shopping incentives (including associated carrying charges) under the RCP for the period 2006 through 2008:

Amortization
 
 
 
Period
 
Amortization
 
 
2006
 
$
177
 
2007
 
 
180
 
2008
 
 
208
 
Total Amortization
 
$
565
 

On January 4, 2006, the PUCO approved, with modifications, the Ohio Companies’ RCP to supplement the RSP to provide customers with more certain rate levels than otherwise available under the RSP during the plan period. On January 10, 2006, the Ohio Companies filed a Motion for Clarification of the PUCO order approving the RCP. The Ohio Companies sought clarity on issues related to distribution deferrals, including requirements of the review process, timing for recognizing certain deferrals and definitions of the types of qualified expenditures. The Ohio Companies also sought confirmation that the list of deferrable distribution expenditures originally included in the revised stipulation fall within the PUCO order definition of qualified expenditures. On January 25, 2006, the PUCO issued an Entry on Rehearing granting in part, and denying in part, the Ohio Companies’ previous requests and clarifying issues referred to above. The PUCO granted the Ohio Companies’ requests to:

 
·
Recognize fuel and distribution deferrals commencing January 1, 2006;
     
 
·
Recognize distribution deferrals on a monthly basis prior to review by the PUCO Staff;
     
 
·
Clarify that the types of distribution expenditures included in the Supplemental Stipulation may be deferred; and
     
 
·
Clarify that distribution expenditures do not have to be “accelerated” in order to be deferred.
     

The PUCO approved the Ohio Companies’ methodology for determining distribution deferral amounts, but denied the Motion in that the PUCO Staff must verify the level of distribution expenditures contained in current rates, as opposed to simply accepting the amounts contained in the Ohio Companies’ Motion. On February 3, 2006, several other parties filed applications for rehearing on the PUCO's January 4, 2006 Order. The Ohio Companies responded to the applications for rehearing on February 13, 2006. In an Entry on Rehearing issued by the PUCO on March 1, 2006, all motions for rehearing were denied. Certain of these parties have subsequently filed notices of appeal with the Supreme Court of Ohio alleging various errors made by the PUCO in its order approving the RCP. The Ohio Companies’ Motion to Intervene in the appeals was granted by the Supreme Court on June 8, 2006. The Appellants’ Merit Briefs were filed at the Supreme Court on July 5, 2006. The Appellees include the PUCO and the Ohio Companies. The Appellees’ Merit Briefs are due on August 4, 2006. Appellants’ Reply Briefs will then be due on August 24, 2006.

86

 
        On December 30, 2004, OE filed with the PUCO two applications related to the recovery of transmission and ancillary service related costs. The first application sought recovery of these costs beginning January 1, 2006. The Ohio Companies requested that these costs be recovered through a rider that would be effective on January 1, 2006 and adjusted each July 1 thereafter. The parties reached a settlement agreement that was approved by the PUCO on August 31, 2005. The incremental transmission and ancillary service revenues recovered from January 1 through June 30, 2006 were approximately $31 million. That amount included the recovery of a portion of the 2005 deferred MISO
 
expenses as described below. On May 1, 2006, OE filed a modification to the rider to determine revenues ($71 million) from July 2006 through June 2007.

The second application sought authority to defer costs associated with transmission and ancillary service related costs incurred during the period October 1, 2003 through December 31, 2005. On May 18, 2005, the PUCO granted the accounting authority for the Ohio Companies to defer incremental transmission and ancillary service-related charges incurred as a participant in MISO, but only for those costs incurred during the period December 30, 2004 through December 31, 2005. Permission to defer costs incurred prior to December 30, 2004 was denied. The PUCO also authorized the Ohio Companies to accrue carrying charges on the deferred balances. On August 31, 2005, the OCC appealed the PUCO's decision. On January 20, 2006, the OCC sought rehearing of the PUCO’s approval of the recovery of deferred costs through the rider during the period January 1, 2006 through June 30, 2006. The PUCO denied the OCC's application on February 6, 2006. On March 23, 2006, the OCC appealed the PUCO's order to the Ohio Supreme Court. On March 27, 2006, the OCC filed a motion to consolidate this appeal with the deferral appeals discussed above and to postpone oral arguments in the deferral appeal until after all briefs are filed in this most recent appeal of the rider recovery mechanism. On March 20, 2006, the Ohio Supreme Court, on its own motion, consolidated the OCC's appeal of the Ohio Companies' case with a similar case involving Dayton Power & Light Company. Oral arguments were heard on May 10, 2006. The Ohio Companies are unable to predict when a decision may be issued.

Under Pennsylvania's electric competition law, Penn is required to secure generation supply for customers who do not choose alternative suppliers for their electricity. On October 11, 2005, Penn filed a plan with the PPUC to secure electricity supply for its customers at set rates following the end of its transition period on December 31, 2006. Penn recommended that the RFP process cover the period January 1, 2007 through May 31, 2008. To the extent that an affiliate of Penn supplies a portion of the PLR load included in the RFP, authorization to make the affiliate sale must be obtained from the FERC. Hearings before the PPUC were held on January 10, 2006 with main briefs filed on January 27, 2006 and reply briefs filed on February 3, 2006. On February 16, 2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with modifications. On April 20, 2006, the PPUC approved the Recommended Decision with additional modifications to use an RFP process to obtain Penn’s power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submissions for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

On May 25, 2006, Penn filed a Petition for Review of the PPUC’s Orders of April 28, 2006 and May 4, 2006, which together decided the issues associated with Penn’s proposed Interim PLR Supply Plan. Penn has asked the Commonwealth Court to review the PPUC’s decision to deny its recovery of certain PLR costs via a reconciliation mechanism and its decision to impose a geographic limitation on the sources of alternative energy credits. On June 7, 2006, the PaDEP filed a Petition for Review appealing the PPUC’s ruling on the method by which alternative energy credits may be acquired and traded. Penn is unable to predict the outcome of this appeal.

On November 1, 2005, FES filed two power sales agreements for approval with the FERC. One power sales agreement provided for FES to provide the PLR requirements of the Ohio Companies at a price equal to the retail generation rates approved by the PUCO for a period of three years beginning January 1, 2006. The Ohio Companies will be relieved of their obligation to obtain PLR power requirements from FES if the Ohio CBP results in a lower price for retail customers. A similar power sales agreement between FES and Penn permits Penn to obtain its PLR power requirements from FES at a fixed price equal to the retail generation price during 2006. The PPUC approved Penn's plan with modifications on April 20, 2006 to use an RFP process to obtain its power supply requirements after 2006 through two separate solicitations. An initial RFP process was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submission for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

87

 
 
        On December 29, 2005, the FERC issued an order setting the two power sales agreements for hearing. The order criticized the Ohio CBP, and required FES to submit additional evidence in support of the reasonableness of the prices charged in the power sales agreements. A pre-hearing conference was held on January 18, 2006 to determine the hearing schedule in this case. Under the procedural schedule approved in this case, FES expected an initial decision to be issued in late January 2007. However, on July 14, 2006, the Chief Judge granted the joint motion of FES and the Trial Staff to appoint a settlement judge in this proceeding. The procedural schedule has been suspended pending negotiations among the parties.

 
        See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Ohio and Pennsylvania and a detailed discussion of reliability initiatives, including initiatives by the PPUC, that impact Penn.
 
        Environmental Matters

OE accrues environmental liabilities only when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in OE’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

W. H. Sammis Plant-

    In 1999 and 2000, the EPA issued NOV or Compliance Orders to nine utilities alleging violations of the Clean Air Act based on operation and maintenance of 44 power plants, including the W. H. Sammis Plant, which was owned at that time by OE and Penn. In addition, the DOJ filed eight civil complaints against various investor-owned utilities, including a complaint against OE and Penn in the U.S. District Court for the Southern District of Ohio. These cases are referred to as New Source Review cases. On March 18, 2005, OE and Penn announced that they had reached a settlement with the EPA, the DOJ and three states (Connecticut, New Jersey, and New York) that resolved all issues related to the W. H. Sammis Plant New Source Review litigation. This settlement agreement was approved by the Court on July 11, 2005, and requires reductions of NOX and SO2 emissions at the W. H. Sammis Plant and other coal fired plants through the installation of pollution control devices and provides for stipulated penalties for failure to install and operate such pollution controls in accordance with that agreement. Those requirements will be the responsibility of FGCO. The settlement agreement also requires OE and Penn to spend up to $25 million toward environmentally beneficial projects, which include wind energy purchased power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty of $8.5 million. Results for the first quarter of 2005 included the penalties paid by OE and Penn of $7.8 million and $0.7 million, respectively. OE and Penn also recognized liabilities in the first quarter of 2005 of $9.2 million and $0.8 million, respectively, for probable future cash contributions toward environmentally beneficial projects.

See Note 10(B) to the consolidated financial statements for further details and a complete discussion of environmental matters.

Other Legal Proceedings

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to OE’s normal business operations pending against OE and its subsidiaries. The other potentially material items not otherwise discussed above are described below.

Power Outages and Related Litigation-

On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively  enhance  the  reliability  of its  electric
 
 
88

 
system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

FirstEnergy companies also are defending six separate complaint cases before the PUCO relating to the August 14, 2003 power outage. Two cases were originally filed in Ohio State courts but were subsequently dismissed for lack of subject matter jurisdiction and further appeals were unsuccessful. In these cases the individual complainants—three in one case and four in the other—sought to represent others as part of a class action. The PUCO dismissed the class allegations, stating that its rules of practice do not provide for class action complaints. Three other pending PUCO complaint cases, were filed by various insurance carriers either in their own name as subrogees or in the name of their insured. In each of these three cases, the carrier seeks reimbursement from various FirstEnergy companies (and, in one case, from PJM, MISO and American Electric Power Company, Inc., as well) for claims paid to insureds for damages allegedly arising as a result of the loss of power on August 14, 2003. The listed insureds in these cases, in many instances, are not customers of any FirstEnergy company. The sixth case involves the claim of a non-customer seeking reimbursement for losses incurred when its store was burglarized on August 14, 2003. FirstEnergy filed a Motion to Dismiss on June 13, 2006. It is currently expected that this case will be summarily dismissed, although the Motion is still pending. On March 7, 2006, the PUCO issued a ruling applicable to all pending cases. Among its various rulings, the PUCO consolidated all of the pending outage cases for hearing; limited the litigation to service-related claims by customers of the Ohio operating companies; dismissed FirstEnergy as a defendant; ruled that the U.S.-Canada Power System Outage Task Force Report was not admissible into evidence; and gave the plaintiffs additional time to amend their complaints to otherwise comply with the PUCO’s underlying order. Also, most complainants, along with the FirstEnergy companies, filed applications for rehearing with the PUCO over various rulings contained in the March 7, 2006 order. On April 26, 2006, the PUCO granted rehearing to allow the insurance company claimants, as insurers, to prosecute their claims in their name so long as they also identify the underlying insured entities and the Ohio utilities that provide their service. The PUCO denied all other motions for rehearing. The plaintiffs in each case have since filed an amended complaint and the named FirstEnergy companies have answered and also have filed a motion to dismiss each action. These motions are pending. Additionally, on June 23, 2006, one of the insurance carrier complainants filed an appeal with the Ohio Supreme Court over the PUCO’s denial of their motion for rehearing on the issue of the admissibility of the Task Force Report and the dismissal of FirstEnergy Corp. as a respondent. Briefing is expected to be completed on this appeal by mid-September. It is unknown when the Supreme Court will rule on the appeal. No estimate of potential liability is available for any of these cases.

FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Nuclear Plant Matters-

As of December 16, 2005, NGC acquired ownership of the nuclear generation assets transferred from OE, Penn, CEI and TE with the exception of leasehold interests of OE and TE in certain of the nuclear plants that are subject to sale and leaseback arrangements with non-affiliates. Excluding OE's retained leasehold interests in Beaver Valley Unit 2 (21.66%) and Perry (12.58%), the transfer included the OE Companies’ prior owned interests in Beaver Valley Unit 1 (100%), Beaver Valley Unit 2 (33.96%) and Perry (22.66%).

On August 12, 2004, the NRC notified FENOC that it would increase its regulatory oversight of the Perry Nuclear Power Plant as a result of problems with safety system equipment over the preceding two years and the licensee's failure to take prompt and corrective action. FENOC operates the Perry Nuclear Power Plant.

On April 4, 2005, the NRC held a public meeting to discuss FENOC’s performance at the Perry Nuclear Power Plant as identified in the NRC's annual assessment letter to FENOC. Similar public meetings are held with all nuclear power plant licensees following issuance by the NRC of their annual assessments. According to the NRC, overall the Perry Plant operated "in a manner that preserved public health and safety" even though it remained under heightened NRC oversight. During the public meeting and in the annual assessment, the NRC indicated that additional inspections will continue and that the plant must improve performance to be removed from the Multiple/Repetitive Degraded Cornerstone Column of the Action Matrix.

89

 
 
        On September 28, 2005, the NRC sent a CAL to FENOC describing commitments that FENOC had made to improve the performance at the Perry Plant and stated that the CAL would remain open until substantial improvement was demonstrated. The CAL was anticipated as part of the NRC's Reactor Oversight Process. In the NRC's 2005 annual assessment letter dated March 2, 2006 and associated meetings to discuss the performance of Perry on March 14, 2006, the NRC again stated that the Perry Plant continued to operate in a manner that "preserved public health and safety." However, the NRC also stated that increased levels of regulatory oversight would continue until sustained improvement in the performance of the facility was realized. If performance does not improve, the NRC has a range of options under the Reactor Oversight Process, from increased oversight to possible impact to the plant’s operating authority. Although FirstEnergy is unable to predict the impact of the ultimate disposition of this matter, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

Other Legal Matters-

On October 20, 2004, FirstEnergy was notified by the SEC that the previously disclosed informal inquiry initiated by the SEC's Division of Enforcement in September 2003 relating to the restatements in August 2003 of previously reported results by FirstEnergy and the Ohio Companies, and the Davis-Besse extended outage, have become the subject of a formal order of investigation. The SEC's formal order of investigation also encompasses issues raised during the SEC's examination of FirstEnergy and the Companies under the now repealed PUHCA. Concurrent with this notification, FirstEnergy received a subpoena asking for background documents and documents related to the restatements and Davis-Besse issues. On December 30, 2004, FirstEnergy received a subpoena asking for documents relating to issues raised during the SEC's PUHCA examination. On August 24, 2005, additional information was requested regarding Davis-Besse related disclosures, which FirstEnergy has provided. FirstEnergy has cooperated fully with the informal inquiry and will continue to do so with the formal investigation.

On August 22, 2005, a class action complaint was filed against OE in Jefferson County, Ohio Common Pleas Court, seeking compensatory and punitive damages to be determined at trial based on claims of negligence and eight other tort counts alleging damages from W.H. Sammis Plant air emissions. The two named plaintiffs are also seeking injunctive relief to eliminate harmful emissions and repair property damage and the institution of a medical monitoring program for class members.

The City of Huron filed a complaint against OE with the PUCO challenging the ability of electric distribution utilities to collect transition charges from a customer of a newly-formed municipal electric utility. The complaint was filed on May 28, 2003, and OE timely filed its response on June 30, 2003. In a related filing, the Ohio Companies filed for approval with the PUCO of a tariff that would specifically allow the collection of transition charges from customers of municipal electric utilities formed after 1998. Both filings were consolidated for hearing and decision described above. An adverse ruling could negatively affect full recovery of transition charges by the utility. Hearings on the matter were held in August 2005. Initial briefs from all parties were filed on September 22, 2005 and reply briefs were filed on October 14, 2005. On May 10, 2006, the PUCO issued its Opinion and Order dismissing the City’s complaint and approving the related tariffs, thus affirming OE’s entitlement to recovery of its transition charges. The City of Huron filed an application for rehearing of the PUCO’s decision on June 9, 2006 and OE filed a memorandum in opposition to that application on June 19, 2006. The PUCO denied the City’s application for rehearing on June 28, 2006. The City of Huron has 60 days from the denial of rehearing to appeal the PUCO’s decision.

If it were ultimately determined that FirstEnergy or its subsidiaries have legal liability or are otherwise made subject to liability based on the above matters, it could have a material adverse effect on FirstEnergy’s or its subsidiaries’ financial condition, results of operations and cash flows.

See Note 10(C) to the consolidated financial statements for further details and a complete discussion of these and other legal proceedings.

NEW ACCOUNTING STANDARDS AND INTERPRETATIONS

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. OE is currently evaluating the impact of this Statement.

90


PENNSYLVANIA POWER COMPANY
 
                          
CONSOLIDATED STATEMENTS OF INCOME
 
(Unaudited)
 
                          
   
Three Months Ended
 
Six Months Ended
 
   
June 30,
 
June 30,
 
   
2006
 
2005
 
2006
 
2005
 
STATEMENTS OF INCOME
 
(In thousands)
 
                          
REVENUES
       
$
80,650
 
$
134,282
 
$
163,369
 
$
268,766
 
                                 
EXPENSES:
                               
Fuel
         
-
   
5,526
   
-
   
11,146
 
Purchased power
         
56,513
   
42,726
   
111,269
   
89,706
 
Nuclear operating costs
         
-
   
19,765
   
-
   
39,713
 
Other operating costs
         
14,124
   
16,743
   
28,328
   
29,511
 
Provision for depreciation
         
1,695
   
3,810
   
4,126
   
7,504
 
Amortization of regulatory assets
         
-
   
9,833
   
3,411
   
19,715
 
General taxes
       
5,670
   
6,444
   
11,504
   
12,916
 
Total expenses
       
78,002
   
104,847
   
158,638
   
210,211
 
                                 
OPERATING INCOME
       
2,648
   
29,435
   
4,731
   
58,555
 
                                 
OTHER INCOME (EXPENSE):
                               
Miscellaneous income
         
3,388
   
924
   
6,851
   
(223
)
Interest expense
         
(1,407
)
 
(2,787
)
 
(5,362
)
 
(5,106
)
Capitalized interest
       
48
   
1,476
   
82
   
2,843
 
Total other income (expense)
       
2,029
   
(387
)
 
1,571
   
(2,486
)
                                 
INCOME TAXES
       
1,928
   
13,337
   
2,807
   
25,356
 
                                 
                                 
NET INCOME
       
2,749
   
15,711
   
3,495
   
30,713
 
                                 
PREFERRED STOCK DIVIDEND REQUIREMENTS
       
155
   
738
   
311
   
1,378
 
                                 
EARNINGS ON COMMON STOCK
       
$
2,594
 
$
14,973
 
$
3,184
 
$
29,335
 
                                 
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Power Company are an integral part
of these statements.
                               
 
 
91

 

PENNSYLVANIA POWER COMPANY
 
                   
CONSOLIDATED BALANCE SHEETS
 
(Unaudited)
 
   
June 30,
 
December 31,
     
   
2006
 
2005
 
   
(In thousands)
     
ASSETS
                 
CURRENT ASSETS:
                 
Cash and cash equivalents
       
$
38
       
$
24
 
Receivables -
                         
Customers (less accumulated provisions of $1,073,000 and $1,087,000,
                         
respectively, for uncollectible accounts)
         
38,303
         
44,555
 
Associated companies
         
81,688
         
115,441
 
Other
         
1,332
         
2,889
 
Notes receivable from associated companies
         
1,838
         
1,699
 
Prepayments and other
       
17,728
       
86,995
 
         
140,927
       
251,603
 
UTILITY PLANT:
                         
In service
         
365,959
         
359,069
 
Less - Accumulated provision for depreciation
       
131,181
       
129,118
 
         
234,778
       
229,951
 
Construction work in progress-
       
5,457
       
3,775
 
         
240,235
       
233,726
 
OTHER PROPERTY AND INVESTMENTS:
                         
Long-term notes receivable from associated companies
         
276,052
         
283,248
 
Other
       
350
       
351
 
         
276,402
       
283,599
 
                           
DEFERRED CHARGES AND OTHER ASSETS:
                         
Prepaid pension costs
         
43,056
         
42,243
 
Other
         
1,775
         
3,829
 
         
44,831
       
46,072
 
                           
         
$
702,395
       
$
815,000
 
LIABILITIES AND CAPITALIZATION
                         
CURRENT LIABILITIES:
                         
Currently payable long-term debt
       
$
15,474
       
$
69,524
 
Short-term borrowings -
                         
Associated companies
         
2,161
         
12,703
 
Other
         
19,000
         
-
 
Accounts payable -
                         
Associated companies
         
20,420
         
73,444
 
Other
         
2,073
         
1,828
 
Accrued taxes
         
23,029
         
28,632
 
Accrued interest
         
1,070
         
1,877
 
Other
       
6,874
       
8,086
 
         
90,101
       
196,094
 
CAPITALIZATION:
                         
Common stockholder's equity
                         
Common stock, $30 par value, authorized 6,500,000 shares-
                         
6,290,000 shares outstanding
         
188,700
         
188,700
 
Other paid in capital
         
71,136
         
71,136
 
Retained earnings
       
40,281
       
37,097
 
Total common stockholder's equity
         
300,117
         
296,933
 
Preferred stock
         
14,105
         
14,105
 
Long-term debt and other long-term obligations
       
123,343
       
130,677
 
         
437,565
       
441,715
 
NONCURRENT LIABILITIES:
                         
Accumulated deferred income taxes
         
63,698
         
66,576
 
Retirement benefits
         
46,845
         
45,967
 
Regulatory liabilities
         
58,822
         
58,637
 
Other
       
5,364
       
6,011
 
         
174,729
       
177,191
 
COMMITMENTS AND CONTINGENCIES (Note 10)
                 
         
$
702,395
       
$
815,000
 
                           
                           
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Power Company are an integral
 
 
92

 

PENNSYLVANIA POWER COMPANY
 
                
CONSOLIDATED STATEMENTS OF CASH FLOWS
 
(Unaudited)
 
                
       
Six Months Ended
 
       
 June 30,  
 
       
 Restated
     
   
 
 
2006
 
2005
 
       
(In thousands)
 
                
CASH FLOWS FROM OPERATING ACTIVITIES:
              
Net income
       
$
3,495
 
$
30,713
 
Adjustments to reconcile net income to net cash from operating activities -
                   
Provision for depreciation
         
4,126
   
7,504
 
Amortization of regulatory assets
         
3,411
   
19,715
 
Nuclear fuel and other amortization
         
-
   
8,278
 
Deferred income taxes and investment tax credits, net
         
(2,383
)
 
(4,955
)
Decrease (increase) in operating assets -
                   
Receivables
         
41,562
   
10,838
 
Materials and supplies
         
-
   
(806
)
Prepayments and other current assets
         
(8,981
)
 
(8,260
)
Increase (decrease) in operating liabilities -
                   
Accounts payable
         
(52,779
)
 
(19,895
)
Accrued taxes
         
(5,602
)
 
12,103
 
Accrued interest
         
(807
)
 
116
 
Other
         
(3,290
)
 
463
 
 Net cash provided from (used for) operating activities
       
(21,248
)
 
55,814
 
                     
CASH FLOWS FROM FINANCING ACTIVITIES:
                   
New Financing -
                   
Short-term borrowings, net
         
8,458
   
33,745
 
Redemptions and Repayments -
                   
Preferred stock
         
-
   
(37,750
)
Long-term debt
         
(61,899
)
 
(810
)
Short-term borrowings, net
         
-
   
-
 
Dividend Payments -
                   
Common stock
         
-
   
(8,000
)
Preferred stock
         
(311
)
 
(1,378
)
 Net cash used for financing activities
       
(53,752
)
 
(14,193
)
                     
CASH FLOWS FROM INVESTING ACTIVITIES:
                   
Property additions
         
(10,216
)
 
(41,093
)
Proceeds from nuclear decommissioning trust fund sales
         
-
   
36,995
 
Investments in nuclear decommissioning trust funds
         
-
   
(37,792
)
Loan repayments from associated companies
         
7,057
   
173
 
Cash investments
   
 
   
78,248
    -  
Other
         
(75
)
 
82
 
 Net cash Provided from (used for) investing activities
       
75,014
   
(41,635
)
                     
Net increase (decrease) in cash and cash equivalents
         
14
   
(14
)
Cash and cash equivalents at beginning of period
         
24
   
38
 
Cash and cash equivalents at end of period
       
$
38
 
$
24
 
 
                   
The preceding Notes to Consolidated Financial Statements as they relate to Pennsylvania Power Company are an integral part of
these statements.
 


 
 
 
 
 
 



93





Report of Independent Registered Public Accounting Firm



To the Stockholder and Board of
Directors of Pennsylvania Power Company:

We have reviewed the accompanying consolidated balance sheet of Pennsylvania Power Company and its subsidiaries as of June 30, 2006, and the related consolidated statements of income and comprehensive income for each of the three-month and six-month periods ended June 30, 2006 and 2005 and the consolidated statements of cash flows for the six-month periods ended June 30, 2006 and 2005. These interim financial statements are the responsibility of the Company’s management.

We conducted our review in accordance with the standards of the Public Company Accounting Oversight Board (United States). A review of interim financial information consists principally of applying analytical procedures and making inquiries of persons responsible for financial and accounting matters. It is substantially less in scope than an audit conducted in accordance with the standards of the Public Company Accounting Oversight Board, the objective of which is the expression of an opinion regarding the financial statements taken as a whole. Accordingly, we do not express such an opinion.

Based on our review, we are not aware of any material modifications that should be made to the accompanying consolidated interim financial statements for them to be in conformity with accounting principles generally accepted in the United States of America.
 
As described in the section entitled "Restatement of the Consolidated Statements of Cash Flows" included in Note 1 to the consolidated interim financial statements, the Company has restated its previously issued consolidated interim financial statements for the quarter ended June 30, 2006.
 
We have previously audited, in accordance with the standards of the Public Company Accounting Oversight Board (United States), the consolidated balance sheet as of December 31, 2005, and the related consolidated statements of income, capitalization, common stockholder’s equity, preferred stock, cash flows and taxes for the year then ended (not presented herein), and in our report [which contained references to the Company’s change in its method of accounting for asset retirement obligations as of January 1, 2003 as discussed in Note 2(G) and Note 8 to those consolidated financial statements] dated February 27, 2006, we expressed an unqualified opinion on those consolidated financial statements. In our opinion, the information set forth in the accompanying consolidated balance sheet as of December 31, 2005, is fairly stated in all material respects in relation to the consolidated balance sheet from which it has been derived.

 
PricewaterhouseCoopers LLP
Cleveland, Ohio
August 4, 2006, except as to Note 1, which is as of October 31, 2006






94


PENNSYLVANIA POWER COMPANY

MANAGEMENT’S DISCUSSION AND ANALYSIS OF
RESULTS OF OPERATIONS AND FINANCIAL CONDITION


Penn is a wholly owned, electric utility subsidiary of OE. Penn conducts business in western Pennsylvania, providing regulated electric distribution services. Penn also provides generation services to those customers electing to retain Penn as their power supplier. Penn's rate restructuring plan and its associated transition charge revenue recovery was completed in 2005. Its power supply requirements are provided by FES - an affiliated company.

FirstEnergy Intra-System Generation Asset Transfers

In 2005, Penn and the Ohio Companies entered into certain agreements implementing a series of intra-system generation asset transfers that were completed in the fourth quarter of 2005. The asset transfers resulted in the respective undivided ownership interests of the Ohio Companies and Penn in FirstEnergy’s nuclear and non-nuclear generation assets being owned by NGC and FGCO, respectively.

On October 24, 2005, Penn completed the intra-system transfer of non-nuclear generation assets to FGCO. Prior to the transfer, FGCO, as lessee under a Master Facility Lease with the Ohio Companies and Penn, leased, operated and maintained the non-nuclear generation assets that it now owns. The asset transfers were consummated pursuant to FGCO's purchase option under the Master Facility Lease.

On December 16, 2005, Penn completed the intra-system transfer of its ownership interests in the nuclear generation assets to NGC through an asset spin-off in the form of a dividend. FENOC continues to operate and maintain the nuclear generation assets.

These transactions were undertaken pursuant to the Ohio Companies’ and Penn’s restructuring plans that were approved by the PUCO and the PPUC, respectively, under applicable Ohio and Pennsylvania electric utility restructuring legislation. Consistent with the restructuring plans, generation assets that had been owned by the Ohio Companies and Penn were required to be separated from the regulated delivery business of those companies through transfer to a separate corporate entity. The transactions essentially completed the divestitures contemplated by the restructuring plans by transferring the ownership interests to NGC and FGCO without impacting the operation of the plants.

The transfers will affect Penn’s comparative earnings results with reductions in both revenues and expenses. Revenues are reduced due to the termination of certain arrangements with FES, under which Penn previously sold its nuclear-generated KWH to FES and leased its non-nuclear generation assets to FGCO, a subsidiary of FES. Penn’s expenses are lower due to the nuclear fuel and operating costs assumed by NGC as well as depreciation and property tax expenses assumed by FGCO and NGC related to the transferred generating assets. In addition, Penn receives interest income on associated company notes receivable from the transfer of its generation net assets. FES will continue to provide Penn’s PLR requirements under revised purchased power arrangements during 2006 (see Outlook -- Regulatory Matters).

95


The effects on Penn’s results of operations in the second quarter and first six months of 2006 compared to the same periods of 2005 from the generation asset transfers are summarized in the following table:

Intra-System Generation Asset Transfers
Income Statement Effects
 
Three Months
   
Six Months
 
Increase (Decrease)
 
(In millions)
 
Revenues:
           
Non-nuclear generating units rent
(a)
 $
(5)
   
 $
(10)
 
Nuclear generated KWH sales
(b)
 
 (38)
   
 
 (76)
 
Total - Revenues Effect
   
(43)
     
(86)
 
Expenses:
               
Fuel costs - nuclear
(c)
 
(5)
     
(11)
 
Nuclear operating costs
(c)
 
(20)
     
(40)
 
Provision for depreciation
(d)
 
(1)
     
(3)
 
General taxes
(e)
 
(1)
     
(1)
 
Total - Expenses Effect
   
(27)
     
(54)
 
Operating Income Effect
   
(16)
     
(32)
 
Other Income:
               
Interest income from notes receivable
(f)
 
2
     
5
 
Capitalized Interest
(g)
 
(1)
   
 
 (3)
 
Total - Other Income Effect
 
 
1
   
 
2
 
Income taxes
(h)
 
(6)
     
(12)
 
Net Income Effect
 
 $
(9)
   
 $
 (18)
 
                 
                 
(a) Elimination of non-nuclear generation assets lease to FGCO
(b) Reduction of nuclear generated wholesale KWH sales to FES
(c) Reduction of nuclear fuel and operating costs.
(d) Reduction of depreciation expense and asset retirement obligation accretion related to generation assets.
(e) Reduction of property tax expense on generation assets.
(f ) Interest income on associated company notes receivable from the transfer of generation net assets.
(g) Reduction of allowance for borrowed funds used during construction on nuclear capital expenditures.
(h) Income tax effect of the above adjustments.
 
 


Restatement of Consolidated Statement of Cash Flows

As further discussed in Note 1 to the Consolidated Financial Statements, Penn is restating its Consolidated Statement of Cash Flows for the six months ended June 30, 2006. This corrects a misclassification of a $78 million cash receipt from the liquidation of cash investments (restricted cash related to the 2005 generation asset transfers) in the first quarter of 2006. The cash receipt was previously reported in cash flows from operating activities and should have been reported in cash flows from investing activities. This correction resulted in a $78 million decrease in the previously reported cash flows from operating activities and a corresponding increase in cash flows from investing activities in Penn’s Consolidated Statements of Cash Flows for the six months ended June 30, 2006. This resulted in revisions in the previously reported Management’s Discussion and Analysis of Results of Operations only to Capital Resources and Liquidity under the Cash Flows From Operating Activities and Cash Flows From Investing Activities sections. The restatement does not change Penn’s previously reported consolidated statements of income and comprehensive income for the three months and six months ended June 30, 2006 or its consolidated balance sheet as of June 30, 2006.
 
Results of Operations

Earnings on common stock in the second quarter of 2006 decreased to $2.6 million from $15 million in the second quarter of 2005. During the first six months of 2006 earnings on common stock decreased to $3.2 million from $29 million in the first six months of 2005. The lower earnings resulted principally from the generation asset transfer effects shown in the table above.

96

 
    Revenues

Revenues decreased by $54 million, or 40%, and $105 million, or 39%, in the second quarter of 2006 and the first six months of 2006, respectively, as compared with the same period of 2005, primarily due to the generation asset transfer impact displayed in the table above. Excluding the effects of the asset transfer, revenues decreased by $11 million, or 12% and $19 million, or 11%, in the second quarter and the first six months of 2006, respectively. The decreases in the second quarter and the first half of 2006 resulted
from lower distribution revenues ($9 million and $18 million, respectively) primarily reflecting the completion of Penn's generation-related transition cost recovery under Penn’s rate restructuring plan, and lower wholesale revenues ($6 million and $12 million, respectively) resulting from the termination of a wholesale sales agreement with a non-affiliate in December 2005. These decreases were partially offset by an increase in retail generation revenues of $5 million in the second quarter of 2006 and $11 million in the first six months of 2006, primarily from higher composite unit prices associated with a 5% rate increase for generation permitted by the PPUC for all customer classes - total retail generation KWH sales remained substantially unchanged.

Lower distribution KWH deliveries to residential and commercial customers in the second quarter and first six months of 2006 reflect the impact of milder weather conditions compared to the same periods of 2005. Higher KWH deliveries to industrial customers in both periods of 2006 are largely due to increased demand from the steel sector.

Changes in distribution deliveries in the second quarter and the first six months of 2006 from the same periods of 2005 are summarized in the following table:

Changes in Distribution Deliveries
 
Three Months
 
Six Months
 
 
Increase (Decrease)
 
 
 
 
 
Distribution Deliveries:
 
 
 
 
 
Residential
 
 
(7.8)
%
 
(4.9)
%
Commercial
 
 
(4.1)
%
 
(2.7)
%
Industrial
 
 
10.3
%
 
7.2
%
Total Distribution Deliveries
   
-
%
 
(0.04)
%
 
 
 
 
 
 
 
 

Expenses

Total expenses decreased by $27 million in the second quarter and $52 million in the first six months of 2006 from the same periods of 2005 principally due to the generation asset transfer impact as shown previously. Excluding the asset transfer effects, the following presents changes from the prior year by expense category:

Expenses - Changes
 
Three Months
 
Six Months
 
 
 
(In millions)
 
Increase (Decrease)
 
 
 
 
 
Purchased power costs
 
$
14
 
$
21
 
Other operating costs
 
 
(3)
 
 
(1)
 
Provision for depreciation
   
(1)
   
-
 
Amortization of regulatory assets
 
 
(10)
 
 
(16)
 
General Taxes
   
-
   
(1)
 
Net change in expenses
 
$
-
 
$
3
 

Increased purchased power costs in the second quarter and the first six months of 2006, compared with the same periods of 2005, resulted from higher unit prices associated with a new power supply agreement with FES, partially offset by decreases in KWH purchased due to lower generation sales requirements. Other operating costs decreased primarily due to lower employee benefit costs and a decrease in the use of outside contractors for tree trimming. The provision for depreciation included an immaterial pretax adjustment of $0.7 million ($0.4 million net of tax) applicable to prior periods.

Amortization of regulatory assets was lower in the second quarter and the first six months of 2006 as compared to the same periods of 2005 due to the completion of Penn's rate restructuring plan and related transition cost amortization.
 
 
97

 
Other Income (Expense)

Investment income increased $2 million in the second quarter and $7 million the first six months of 2006, compared with the same periods of 2005, primarily due to the impact of the generation asset transfer.
 
 
Net Interest Charges

Net interest charges were substantially unchanged in the second quarter and increased $3 million in the first six months as compared to the same periods of 2005 primarily due to the reduction of capitalized interest related to the generation asset transfer.

Capital Resources and Liquidity

Penn’s cash requirements in 2006 for expenses, construction expenditures and scheduled debt maturities are expected to be met with a combination of cash from operations and short-term credit arrangements. Available borrowing capacity under credit facilities will be used to manage working capital requirements.

Changes in Cash Position

Penn had $38,000 of cash and cash equivalents as of June 30, 2006 compared with $24,000 as of December 31, 2005. The major sources for changes in these balances are summarized below.

Cash Flows From Operating Activities

Net cash of $21 million (as restated) used for operating activities in the first six months of 2006, compared with $56 million provided from operating activities in the corresponding 2005 period, was as follows:

 
 
Six Months Ended
 
 
 
June 30,
 
 Operating Cash Flows
 
2006
 
2005
 
     
(in millions)
 
Cash earnings (*)
 
$
9
 
$
62
 
Working capital and other
 
 
(30)
 
 
(6
)
Net cash provided from (used for) operating activities
 
$
(21)
 
$
56
 
               
               
(*) Cash earnings are a non-GAAP measure (see reconciliation below).

Cash earnings (in the table above) are not a measure of performance calculated in accordance with GAAP. Penn believes that cash earnings are a useful financial measure because it provides investors and management with an additional means of evaluating its cash-based operating performance. The following table reconciles cash earnings with net income:

     
Six Months Ended
 
 
 
 
June 30,
 
Reconciliation of Cash Earnings
 
 
2006
 
2005
 
     
(in millions)
Net income (GAAP)
 
 
$
3
 
$
31
 
Non-cash charges (credits):
 
 
 
   
 
 
 
Provision for depreciation
 
 
 
4
 
 
8
 
Amortization of regulatory assets
 
 
 
3
 
 
20
 
Nuclear fuel and other amortization
 
 
 
-
 
 
8
 
Deferred income taxes and investment tax credits, net
 
 
 
(2)
 
 
(5
Other non-cash items
 
 
 
1
 
 
-
 
Cash earnings (Non-GAAP)
 
 
$
9
 
$
62
 

The $53 million decrease in cash earnings for the first six months of 2006, as compared to the corresponding period of 2005, is described above under “Results of Operations”, and resulted principally from the impact of the generation asset transfer. The $24 million change in working capital was primarily due to increased cash outflows from the settlement of accounts payable of $33 million and an $18 million change in accrued taxes, partially offset by increases in cash provided from the settlement of receivables of $31 million.

98

 
    Cash Flows From Financing Activities

Net cash used for financing activities totaled $54 million in the first six months of 2006, compared with $14 million in the same period of 2005. The $40 million increase resulted from $62 million of long-term debt redemptions in 2006 principally related to the generation asset transfer discussed above and a $25 million decrease in short-term borrowings, partially offset by decreases of $38 million in preferred stock redemptions and reductions of $8 million in common stock dividend payments to OE as compared to the first six months of 2005.
 
      Penn had $2 million of cash and temporary investments (which included short-term notes receivable from associated companies) and $21 million of short-term indebtedness as of June 30, 2006. Penn has authorization from the SEC, continued by FERC rules adopted as a result of EPACT's repeal of PUHCA, to incur short-term debt up to its charter limit of $44 million (including the utility money pool). Penn had the capability to issue $66 million of additional FMB on the basis of property additions and retired bonds as of June 30, 2006. Based upon applicable earnings coverage tests, Penn could issue up to $290 million of preferred stock (assuming no additional debt was issued) as of June 30, 2006.

Short-term borrowings outstanding as of June 30, 2006, consisted of $19 million of borrowings from affiliates. Penn Power Funding LLC (Penn Funding), a wholly owned subsidiary of Penn, is a limited liability company whose borrowings are secured by customer accounts receivable purchased from Penn. Penn Funding can borrow up to $25 million under a receivables financing arrangement at rates based on bank commercial paper rates. The financing arrangements require payment of an annual facility fee of 0.125% on the entire finance limit. Penn Funding’s receivables financing agreements expire June 28, 2007. As a separate legal entity with separate creditors, it would have to satisfy its separate obligations to creditors before any of its remaining assets could be made available to Penn.

Penn has the ability to borrow under a syndicated $2 billion five-year revolving credit facility, which expires in June 2010, along with FirstEnergy, OE, CEI, TE, JCP&L, Met-Ed, Penelec, FES, and ATSI. Borrowings under the facility are available to each Borrower separately and will mature on the earlier of 364 days from the date of borrowing or the commitment termination date. Penn's borrowing limit under the facility is $50 million.

Under the revolving credit facility, borrowers may request the issuance of LOC’s expiring up to one year from the date of issuance. The stated amount of outstanding LOC’s will count against total commitments available under the facility and against the applicable borrower’s borrowing sub-limit. Total unused borrowing capability under the existing credit facility and accounts receivable financing facilities totaled $56 million as of June 30, 2006.

The revolving credit facility contains financial covenants requiring each borrower to maintain a consolidated debt to total capitalization ratio of no more than 65%. As of June 30, 2006, Penn's debt to total capitalization as defined under the revolving credit facility was 34%.

The facility does not contain any provisions that either restrict Penn's ability to borrow or accelerate repayment of outstanding advances as a result of any change in its credit ratings. Pricing is defined in “pricing grids”, whereby the cost of funds borrowed under the facility is related to Penn's credit ratings.

Penn has the ability to borrow from its regulated affiliates and FirstEnergy to meet its short-term working capital requirements. FESC administers this money pool and tracks surplus funds of FirstEnergy and its regulated subsidiaries. Companies receiving a loan under the money pool agreements must repay the principal amount, together with accrued interest, within 364 days of borrowing the funds. The rate of interest is the same for each company receiving a loan from the pool and is based on the average cost of funds available through the pool. The average interest rate for borrowings under these arrangements in the first six months of 2006 was 4.86%.

Penn's access to the capital markets and the costs of financing are influenced by the ratings of its securities and the securities of OE and FirstEnergy. The rating outlook from S&P on all securities is stable. Moody's and Fitch's ratings outlook on all securities is positive.

In the first six months of 2006, pollution control notes that were formerly obligations of Penn were refinanced and became obligations of FGCO and NGC. The proceeds from the refinancings were used to repay a portion of their associated company notes payable to Penn. With those repayments, Penn redeemed pollution control notes in the principal amount of $16.8 million at 5.9%, $12.7 million at 6.15%, $14.25 million at 6%, $10.3 million at 3.61%, and $6.95 million at 5.45%.

99

 
    Cash Flows From Investing Activities

Net cash provided from investing activities totaled $75 million (as restated) in the first six months of 2006, compared with net cash of $42 million used for investing activities in the same period of 2005. The $117 million change reflects $78 million from the liquidation of cash investments, a $31 million reduction in property additions, principally as a result of the generation asset transfer discussed above and a $7 million increase in loan repayments from associated companies.

During the last half of 2006, capital requirements for property additions are expected to be approximately $8 million. Penn has sinking fund requirements of approximately $0.5 million for maturing long-term debt during the remainder of 2006. These cash requirements are expected to be satisfied from internal cash and short-term credit arrangements.
  
            Penn’s capital spending for the period 2006-2010 is expected to be approximately $90 million of which approximately $18 million applies to 2006. Penn had no other material obligations as of June 30, 2006 that have not been recognized on its Consolidated Balance Sheet.
 
 
100

 
OUTLOOK

The electric industry continues to transition to a more competitive environment and all of Penn’s customers can select alternative energy suppliers. Penn continues to deliver power to residential homes and businesses through its existing distribution system, which remains regulated. Customer rates have been restructured into separate components to support customer choice. Penn has a continuing responsibility to provide power to those customers not choosing to receive power from an alternative energy supplier subject to certain limits.

Regulatory Matters

Regulatory assets and liabilities are costs which have been authorized by the PPUC and the FERC for recovery from or credit to customers in future periods and, without such authorization, would have been charged or credited to income when incurred. Penn’s net regulatory liabilities were approximately $59 million as of June 30, 2006 and December 31, 2005, and are included under Noncurrent Liabilities on the Consolidated Balance Sheets.

Under Pennsylvania's electric competition law, Penn is required to secure generation supply for customers who do not choose alternative suppliers for their electricity. On October 11, 2005, Penn filed a plan with the PPUC to secure electricity supply for its customers at set rates following the end of its transition period on December 31, 2006. Penn recommended that the RFP process cover the period January 1, 2007 through May 31, 2008. To the extent that an affiliate of Penn supplies a portion of the PLR load included in the RFP, authorization to make the affiliate sale must be obtained from the FERC. Hearings before the PPUC were held on January 10, 2006 with main briefs filed on January 27, 2006 and reply briefs filed on February 3, 2006. On February 16, 2006, the ALJ issued a Recommended Decision to adopt Penn's RFP process with modifications. On April 20, 2006, the PPUC approved the Recommended Decision with additional modifications to use an RFP process to obtain Penn’s power supply requirements after 2006 through two separate solicitations. An initial solicitation was held for Penn in May 2006 with all tranches fully subscribed. On June 2, 2006, the PPUC approved the bid results for the first solicitation. On July 18, 2006, the second PLR solicitation was held for Penn. The tranches for the Residential Group and Small Commercial Group were fully subscribed. However, supply was only acquired for three of the five tranches for the Large Commercial Group. On July 20, 2006, the PPUC approved the submissions for the second bid. A residual solicitation is scheduled to be held on August 15, 2006 for the two remaining Large Commercial Group tranches. Acceptance of the winning bids is subject to approval by the PPUC.

On November 1, 2005, FES filed a power sales agreement for approval with the FERC that would permit Penn to obtain its PLR power requirements from FES at a fixed price equal to the retail generation price during 2006. As discussed above, subsequent to the PPUC’s approval of Penn's plan for the RFP process to obtain its post 2006 power supply requirements, the customer power supply requirements for all of the residential and the small commercial sectors and the majority of the large commercial sector tranches have been fully subscribed and the bids approved by the PPUC. An additional solicitation for the remaining two large commercial sector tranches is scheduled for August 15, 2006.

On May 25, 2006, Penn filed a Petition for Review of the PPUC’s Orders of April 28, 2006 and May 4, 2006, which together decided the issues associated with Penn’s proposed Interim PLR Supply Plan. Penn has asked the Commonwealth Court to review the PPUC’s decision to deny its recovery of certain PLR costs via a reconciliation mechanism and its decision to impose a geographic limitation on the sources of alternative energy credits. On June 7, 2006, the PaDEP filed a Petition for Review appealing the PPUC’s ruling on the method by which alternative energy credits may be acquired and traded. Penn is unable to predict the outcome of this appeal.

See Note 11 to the consolidated financial statements for further details and a complete discussion of regulatory matters in Pennsylvania.

Environmental Matters

Penn accrues environmental liabilities when it concludes that it is probable that it has an obligation for such costs and can reasonably estimate the amount of such costs. Unasserted claims are reflected in Penn’s determination of environmental liabilities and are accrued in the period that they are both probable and reasonably estimable.

101



W. H. Sammis Plant

In 1999 and 2000, the EPA issued NOV or Compliance Orders to nine utilities alleging violations of the Clean Air Act based on operation and maintenance of 44 power plants, including the W. H. Sammis Plant, which was owned at that time by OE and Penn. In addition, the DOJ filed eight civil complaints against various investor-owned utilities, including a complaint against OE and Penn in the U.S. District Court for the Southern District of Ohio. These cases are referred to as New Source Review cases. On March 18, 2005, OE and Penn announced that they had reached a settlement with the EPA, the DOJ and three states (Connecticut, New Jersey, and New York) that resolved all issues related to the W. H. Sammis Plant New Source Review litigation. This settlement agreement was approved by the Court on July 11, 2005, and requires reductions of NOX and SO2 emissions at the W. H. Sammis Plant and other coal fired plants through the installation of pollution control devices and provides for stipulated penalties for failure to install and operate such pollution controls in accordance with that agreement. Those requirements will be the responsibility of FGCO. The settlement agreement also requires OE and Penn to spend up to $25 million toward environmentally beneficial projects, which include wind energy purchased power agreements over a 20-year term. OE and Penn agreed to pay a civil penalty of $8.5 million. Results for the first quarter of 2005 included the penalties paid by OE and Penn of $7.8 million and $0.7 million, respectively. OE and Penn also recognized liabilities in the first quarter of 2005 of $9.2 million and $0.8 million, respectively, for probable future cash contributions toward environmentally beneficial projects.
 
Other Legal Proceedings

There are various lawsuits, claims (including claims for asbestos exposure) and proceedings related to Penn’s normal business operations pending against Penn. The other material items not otherwise discussed above are described below.

Power Outages and Related Litigation

On August 14, 2003, various states and parts of southern Canada experienced widespread power outages. The outages affected approximately 1.4 million customers in FirstEnergy's service area. The U.S. - Canada Power System Outage Task Force’s final report in April 2004 on the outages concluded, among other things, that the problems leading to the outages began in FirstEnergy’s Ohio service area. Specifically, the final report concluded, among other things, that the initiation of the August 14, 2003 power outages resulted from an alleged failure of both FirstEnergy and ECAR to assess and understand perceived inadequacies within the FirstEnergy system; inadequate situational awareness of the developing conditions; and a perceived failure to adequately manage tree growth in certain transmission rights of way. The Task Force also concluded that there was a failure of the interconnected grid's reliability organizations (MISO and PJM) to provide effective real-time diagnostic support. The final report is publicly available through the Department of Energy’s Web site (www.doe.gov). FirstEnergy believes that the final report does not provide a complete and comprehensive picture of the conditions that contributed to the August 14, 2003 power outages and that it does not adequately address the underlying causes of the outages. FirstEnergy remains convinced that the outages cannot be explained by events on any one utility's system. The final report contained 46 “recommendations to prevent or minimize the scope of future blackouts.” Forty-five of those recommendations related to broad industry or policy matters while one, including subparts, related to activities the Task Force recommended be undertaken by FirstEnergy, MISO, PJM, ECAR, and other parties to correct the causes of the August 14, 2003 power outages. FirstEnergy implemented several initiatives, both prior to and since the August 14, 2003 power outages, which were independently verified by NERC as complete in 2004 and were consistent with these and other recommendations and collectively enhance the reliability of its electric system. FirstEnergy’s implementation of these recommendations in 2004 included completion of the Task Force recommendations that were directed toward FirstEnergy. FirstEnergy is also proceeding with the implementation of the recommendations that were to be completed subsequent to 2004 and will continue to periodically assess the FERC-ordered Reliability Study recommendations for forecasted 2009 system conditions, recognizing revised load forecasts and other changing system conditions which may impact the recommendations. Thus far, implementation of the recommendations has not required, nor is expected to require, substantial investment in new or material upgrades to existing equipment. The FERC or other applicable government agencies and reliability coordinators may, however, take a different view as to recommended enhancements or may recommend additional enhancements in the future as the result of adoption of mandatory reliability standards pursuant to the EPACT that could require additional material expenditures.

FirstEnergy is vigorously defending these actions, but cannot predict the outcome of any of these proceedings or whether any further regulatory proceedings or legal actions may be initiated against the Companies. Although unable to predict the impact of these proceedings, if FirstEnergy or its subsidiaries were ultimately determined to have legal liability in connection with these proceedings, it could have a material adverse effect on FirstEnergy's or its subsidiaries' financial condition, results of operations and cash flows.

102



See Note 10(C) to the consolidated financial statements for further details and a complete discussion of other legal proceedings.
 
New Accounting Standards and Interpretations

FIN 48 - “Accounting for Uncertainty in Income Taxes - an interpretation of FASB Statement No. 109.”

In June 2006, the FASB issued FIN 48 which clarifies the accounting for uncertainty in income taxes recognized in an enterprise’s financial statements in accordance with FASB Statement No. 109, “Accounting for Income Taxes.” This interpretation prescribes a recognition threshold and measurement attribute for the financial statement recognition and measurement of a tax position taken or expected to be taken on a tax return. This interpretation also provides guidance on derecognition, classification, interest, penalties, accounting in interim periods, disclosure and transition. The evaluation of a tax position in accordance with this interpretation will be a two-step process. The first step will determine if it is more likely than not that a tax position will be sustained upon examination and should therefore be recognized. The second step will measure a tax position that meets the more likely than not recognition threshold to determine the amount of benefit to recognize in the financial statements. This interpretation is effective for fiscal years beginning after December 15, 2006. Penn is currently evaluating the impact of this Statement.

103




ITEM 4. CONTROLS AND PROCEDURES
 

The applicable registrant's chief executive officer and chief financial officer have reviewed and evaluated the registrant's disclosure controls and procedures. The term disclosure controls and procedures means controls and other procedures of a registrant that are designed to ensure that information required to be disclosed by the registrant in the reports that it files or submits under the Securities Exchange Act of 1934 (15 U.S.C. 78a et seq.) is recorded, processed, summarized and reported, within the time periods specified in the Securities and Exchange Commission's rules and forms. Disclosure controls and procedures include, without limitation, controls and procedures designed to ensure that information required to be disclosed by an issuer in the reports that it files or submits under that Act is accumulated and communicated to the registrant's management, including its principal executive and principal financial officers, or persons performing similar functions, as appropriate to allow timely decisions regarding required disclosure. Based upon that evaluation, those officers concluded that, as of the end of the period covered by this report, the applicable registrant's disclosure controls and procedures were ineffective as of June 30, 2006.

As reported in this Form 10-Q/A, the registrants have amended their Form 10-Q for the second quarter of 2006 to restate their respective Consolidated Statements of Cash Flows for a misclassification between cash from operating activities and cash from investing activities. The restatement did not affect the registrants’ Consolidated Statements of Income and Comprehensive Income or Consolidated Balance Sheets.

The restatement resulted principally from the misclassification of cash flows related to cash receipts from the liquidation of a temporary cash investment (restricted cash related to the 2005 generation asset transfer), as fully discussed in Note 1 to the accompanying consolidated interim financial statements. The cash flows had been classified in operating activities, rather than investing activities. Accordingly, the restatements will solely affect the classification of these activities and the subtotals of cash flows from operating and investing activities presented in the affected Consolidated Statements of Cash Flows, but will have no impact on the net increase (decrease) in total cash and cash equivalents for the six months ended June 30, 2006.
 
The restatement described above resulted from a deficiency in the internal controls over the preparation and review of the Consolidated Statement of Cash Flows. The registrants modified the internal controls over the preparation and review of their Consolidated Statements of Cash Flows during the third quarter of 2006. Management has implemented a process to aid in ensuring the correct classification of items included in the consolidated statement of cash flows, including a control over the preparation and review of manual reclassifications. Accordingly, management believes that this enhancement accentuates the existing internal controls and remediated the control deficiency discussed above. There have been no other changes made in the registrants' internal control over financial reporting that occurred during the registrants’ third quarter of 2006 that have materially affected, or are reasonably likely to materially affect, the registrants' internal control over financial reporting. Based on the remediation of the control deficiency, the applicable registrant's chief executive officer and chief financial officer have concluded that the disclosure controls and procedures were effective as of the filing date of this amended Form 10-Q.
 


104


ITEM 6. EXHIBITS

Exhibit
Number
 
 
     
FirstEnergy
 
     
 
12*
Fixed charge ratios
 
15
Letter from independent registered public accounting firm
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
     
OE
 
     
 
12*
Fixed charge ratios
 
15
Letter from independent registered public accounting firm
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
   
Penn
 
 
15
Letter from independent registered public accounting firm
 
31.1
Certification of chief executive officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
31.2
Certification of chief financial officer, as adopted pursuant to Rule 13a-15(e)/15d-(e).
 
32.1
Certification of chief executive officer and chief financial officer, pursuant to 18 U.S.C. Section 1350.
     
     

*Indicates the items that have not been revised and are not included in this Form 10-Q/A. Reference is made to the original Form 10-Q filed on August 7, 2006 for the complete text of such items.

Pursuant to reporting requirements of respective financings, FirstEnergy and OE are required to file fixed charge ratios as an exhibit to this Form 10-Q. Penn does not have a similar financing reporting requirement and has not filed its fixed charge ratios.

Pursuant to paragraph (b)(4)(iii)(A) of Item 601 of Regulation S-K, neither FirstEnergy, OE, and Penn have filed as an exhibit to this Form 10-Q any instrument with respect to long-term debt if the respective total amount of securities authorized thereunder does not exceed 10% of their respective total assets of FirstEnergy and its subsidiaries on a consolidated basis, or respectively, OE and Penn but hereby agree to furnish to the Commission on request any such documents.


105


SIGNATURE



Pursuant to the requirements of the Securities Exchange Act of 1934, each Registrant has duly caused this report to be signed on its behalf by the undersigned thereunto duly authorized.

 
November 1, 2006
 




 
FIRSTENERGY CORP.
 
Registrant
   
 
OHIO EDISON COMPANY
 
Registrant
   
   
 
PENNSYLVANIA POWER COMPANY
 
Registrant
   
 


 
     /s/ Harvey L. Wagner
 
                  Harvey L. Wagner
 
Vice President, Controller
 
and Chief Accounting Officer
 
 
106