Form 6-K

 

 

UNITED STATES

SECURITIES AND EXCHANGE COMMISSION

Washington, D.C. 20549

 

 

Form 6-K

 

 

REPORT OF FOREIGN PRIVATE ISSUER

PURSUANT TO RULE 13a-16 OR 15d-16

UNDER THE SECURITIES EXCHANGE ACT OF 1934

October 22, 2013

 

 

 

BHP BILLITON LIMITED   BHP BILLITON PLC
(ABN 49 004 028 077)   (REG. NO. 3196209)
(Exact name of Registrant as specified in its charter)   (Exact name of Registrant as specified in its charter)

 

 

 

VICTORIA, AUSTRALIA   ENGLAND AND WALES
(Jurisdiction of incorporation or organisation)   (Jurisdiction of incorporation or organisation)

180 LONSDALE STREET, MELBOURNE,

VICTORIA

3000 AUSTRALIA

 

NEATHOUSE PLACE, LONDON,

UNITED KINGDOM

(Address of principal executive offices)   (Address of principal executive offices)

 

 

Indicate by check mark whether the registrant files or will file annual reports under cover of Form 20-F or Form 40-F:  x Form 20-F    ¨ Form 40-F

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(1):  ¨

Indicate by check mark if the registrant is submitting the Form 6-K in paper as permitted by Regulation S-T Rule 101(b)(7):  ¨

Indicate by check mark whether the registrant by furnishing the information contained in this Form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under the Securities Exchange Act of 1934:  ¨ Yes    x No

If “Yes” is marked, indicate below the file number assigned to the registrant in connection with Rule 12g3-2(b): n/a

 

 

 


NEWS RELEASE    LOGO

 

Release Time            IMMEDIATE
Date    22 October 2013
Number    24/13

BHP BILLITON OPERATIONAL REVIEW

FOR THE QUARTER ENDED 30 SEPTEMBER 2013

 

  BHP Billiton maintained strong momentum in the September 2013 quarter as production increased by 11%i from the prior corresponding period. Optimisation of the Western Australia Iron Ore (WAIO) supply chain continues to unlock substantial value with 2014 financial year production guidance raised to 212 million tonnes (100% basis). Full year production guidance is maintained for Petroleum, Copper and Coal.

 

  Total petroleum production for the September 2013 quarter was a record 62.7 million barrels of oil equivalent. A 16% increase in liquids production was underpinned by significant growth in Onshore US volumes, primarily in the Black Hawk, and the start-up of a new production well at Atlantis. An additional Atlantis production well is scheduled for completion in the second half of the 2014 financial year.

 

  Queensland Coal continued to benefit from its focus on productivity as it sustained an annualised production rate of 61 million tonnes (100% basis) in the September 2013 quarter.

 

  Four major projects delivered first production, including the WAIO Jimblebar Mine Expansion where first production was achieved approximately six months ahead of the original schedule. All other projects are tracking to plan.

 

  Our ability to simplify our portfolio and focus on our diversified pillars of Petroleum, Copper, Iron Ore and Coal remains an important point of differentiation. Since the beginning of the 2013 financial year the Group has completed major transactions totalling US$6.5 billion, which includes US$2.2 billion received in the financial year to date.

BHP Billiton Chief Executive Officer, Andrew Mackenzie, said: “Our pursuit of productivity gains and operating excellence is already yielding strong results. There is no better example than in our Iron Ore business, where the deployment of mobile crushing units and the continued debottlenecking of the supply chain has underpinned a five million tonne increase in Western Australia Iron Ore’s production guidance for the 2014 financial year.

“We continue to build on the substantial US$2.7 billion reduction in controllable cash costs delivered in the 2013 financial year with strong momentum maintained in the first quarter. In addition, a 25 per cent reduction in capital and exploration expenditure to US$16 billionii in the 2014 financial year has significantly increased internal competition for capital. Our rate of expenditure will decline again next year and if our investment criteria cannot be met in any one project, product or geography, we will redirect our capital elsewhere or we will not invest.

“Active management of our portfolio has also delivered significant value for our shareholders. In this financial year completed transactions have already delivered proceeds of US$2.2 billion, further strengthening our solid A balance sheet. With strong production growth and our overriding commitment to substantially increase free cash flow, we are well positioned to grow returns to our shareholders.”

 

i  Refers to copper equivalent production based on average realised product prices for the 2013 financial year.
ii  Capital and exploration expenditure guidance excludes deferred stripping and refers to BHP Billiton’s equity interest.

Note: Unless specified otherwise: variance analysis relates to the relative performance of BHP Billiton and/or its operations during the September 2013 quarter compared with the September 2012 quarter; all references to production and capital expenditure are BHP Billiton share and reflect the adoption of the new accounting standard (IFRS 10); and all references to project capacity are 100 per cent.


Summary

 

Production summary

   SEP
2013
QTR
     SEP Q13
vs

SEP Q12
    SEP Q13
vs
JUN Q13
 

Total petroleum products (million boe)

     62.7         2     6

Copper (‘000 tonnes)

     403.3         6     –13

Iron ore (‘000 tonnes)

     48,848         23     2

Metallurgical coal (‘000 tonnes)

     10,185         14     –6

Energy coal (‘000 tonnes)

     19,639         3     6

Alumina (‘000 tonnes)

     1,251         7     –1

Aluminium (‘000 tonnes)

     310         15     0

Manganese ore (‘000 tonnes)

     2,046         –5     –9

Manganese alloy (‘000 tonnes)

     137         5     –25

Nickel (‘000 tonnes)

     40.4         9     0

BHP Billiton maintained strong momentum in the September 2013 quarter as production increased by 11 per cent from the prior corresponding period. Optimisation of the WAIO supply chain continues to unlock substantial value with 2014 financial year production guidance raised to 212 million tonnes (100 per cent basis). Full year production guidance is maintained for Petroleum, Copper and Coal.

Our WAIO business achieved another major milestone during the quarter with first production delivered from the Jimblebar Mine Expansion, six months ahead of its original schedule. The ramp up of phase one capacity to 35 million tonnes per annum (mtpa) is expected to be completed by the end of the 2015 financial year. Together with the recent installation of four mobile crushers, this will increase total WAIO supply chain capacity to in excess of 220 mtpa (100 per cent basis). Longer term, a low cost option to expand Jimblebar to 55 mtpa and the broader debottlenecking of the supply chain is expected to underpin capital efficient growth in capacity to approximately 260 mtpa to 270 mtpa (100 per cent basis).

First production was also achieved at Macedon, Bass Strait Turrum and North West Shelf North Rankin B Gas Compression (all Australia). In addition, the Newcastle Third Port Stage 3 project (Australia) achieved mechanical completion. These projects will not be reported in future quarterly reports. The remaining 12 major projects are tracking to plan.

During the September 2013 quarter, BHP Billiton announced an investment of US$3.4 billion (100 per cent basis) to construct a desalination facility which will deliver sustainable water supply to Escondida (Chile) over the long term. In addition, BHP Billiton announced it is investing US$2.6 billion to finish the excavation and lining of the Jansen Potash project (Canada) production and service shafts, and to continue the installation of essential surface infrastructure and utilities. Completion of both shafts is expected during the 2016 calendar year, while the associated works program will extend into the 2017 calendar year.

BHP Billiton’s active program of portfolio simplification has delivered proceeds of US$2.2 billion since the commencement of the 2014 financial year with the completion of the Jimblebar (Australia) and Pinto Valley (US) transactions. In addition, the Group priced a four tranche, US$5.0 billion Global Bond during the September 2013 quarter. The proceeds will be used for general corporate purposes.

The new International Financial Reporting Standard (IFRS) 10 came into effect from 1 July 2013. The application of this accounting standard requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically. This report has been prepared on the basis of this new accounting standard and references to BHP Billiton share now include 100 per cent of Escondida. As a consequence, BHP Billiton’s copper production guidance for the 2014 financial year now refers to 1.7 million tonnes, although the Group’s equity interest remains unchanged at 1.2 million tonnes.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    2


Petroleum and Potash

Production

 

     SEP
2013
QTR
     SEP Q13
vs

SEP Q12
    SEP Q13
vs
JUN Q13
 

Crude oil, condensate and natural gas liquids (‘000 boe)

     26,053         16     11

Natural gas (bcf)

     219.66         –6     2

Total petroleum products (million boe)

     62.7         2     6

Total petroleum production – Total petroleum production for the September 2013 quarter was a record 62.7 million barrels of oil equivalent (BHP Billiton share). Guidance for the 2014 financial year remains unchanged at 250 million barrels of oil equivalent (BHP Billiton share).

Crude oil, condensate and natural gas liquids – A 16 per cent increase in liquids production in the September 2013 quarter was underpinned by significant growth in Onshore US volumes, primarily in the Black Hawk, and the start-up of a new production well at Atlantis (US). An additional Atlantis production well is scheduled for completion in the second half of the 2014 financial year. A significant increase in the number of producing wells in the liquids rich Eagle Ford contributed to a 29 per cent increase in Onshore US liquids production from the June 2013 quarter.

Planned maintenance and new well tie-ins at Pyrenees (Australia) are expected to impact conventional liquids production during the December 2013 quarter with the floating production storage and off-take (FPSO) facility offline for approximately one month. These additional production wells will mitigate natural field decline in the second half of the 2014 financial year.

Natural gas – Natural gas production declined by six per cent in the September 2013 quarter. The successful delivery of first gas from the Macedon project in August 2013 only partially offset softer seasonal demand at Bass Strait and lower production at Haynesville (US), following our deliberate decision to prioritise Onshore US development drilling in the liquids rich Black Hawk region of the Eagle Ford.

Projects

 

Project and ownership

   Capital
expenditure
(US$m)
     Initial
production
target date
   

Capacity

  

Progress

Macedon (Australia)

71.43% (operator)

     1,050         CY13      200 million cubic feet of gas per day.    First gas sales achieved in August 2013. The overall project is 100% complete.

Bass Strait Turrum (Australia)

50% (non-operator)

     1,350         CY13 iii    11,000 barrels of condensate per day and processing capacity of 200 million cubic feet of gas per day.    On revised schedule and budget for remaining scope. First gas achieved in June 2013. The overall project is 91% complete.

North West Shelf North Rankin B Gas Compression (Australia)

16.67% (non-operator)

     850         CY13      2,500 million cubic feet of gas per day.    On budget. First production achieved in early October 2013. The overall project is 99% complete.

 

iii  Initial production through the Turrum facilities is low CO2 gas. Additional high CO2 gas production from the Turrum reservoir will come online with completion of the Longford Gas Conditioning Plant in the 2016 calendar year.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    3


Project and ownership

   Capital
expenditure
(US$m)
     Initial
production
target date
    

Capacity

  

Progress

North West Shelf Greater Western Flank-A (Australia)

16.67% (non-operator)

     400         CY16       To maintain LNG plant throughput from the North West Shelf operations.    On schedule and budget. The overall project is 60% complete.

Bass Strait Longford Gas Conditioning Plant (Australia)

50% (non-operator)

     520         CY16       Designed to process approximately 400 million cubic feet per day of high CO2 gas.    On schedule and budget. The overall project is 20% complete.

Onshore US drilling and development expenditure totalled US$1.3 billion in the September 2013 quarter. The Company’s rig count declined from 40 to 27 during the period which will result in lower expenditure in subsequent quarters. Approximately 75 per cent of drilling activity occurred in the Eagle Ford, with the majority focused on our liquids rich Black Hawk acreage. The optimisation of our dry gas program and the associated termination of rig contracts is expected to result in a charge of approximately US$100 million in the 2014 financial year, with the large majority to be booked in the first half. Guidance for Onshore US drilling and development expenditure remains unchanged at US$3.9 billion for the 2014 financial year.

Petroleum exploration

Exploration and appraisal wells drilled during the quarter or in the process of drilling as at 30 September 2013.

 

Well

  

Location

  

BHP Billiton equity

  

Status

Raptor-1/ST-1

  

Gulf of Mexico

DC535

  

50%

(Anadarko operator)

   Plugged and abandoned Hydrocarbons encountered

Sake

  

Gulf of Mexico

DC726

  

60%

(Operator)

  

Plugged and abandoned

Dry hole

Petroleum exploration expenditure for the September 2013 quarter was US$205 million, of which US$64 million was expensed. A US$600 million exploration program, largely focused on the Gulf of Mexico (US) and Western Australia, is planned for the 2014 financial year.

Potash

 

Project and ownership

   Investment
(US$m)
   

Scope

 

Progress

Jansen Potash (Canada)

100%

     2,600      Investment to finish the excavation and lining of the production and service shafts, and to continue the installation of essential surface infrastructure and utilities.   Approval announced. See news release dated 20 August 2013.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    4


Copper

Production

 

     SEP
2013
QTR
     SEP Q13
vs
SEP Q12
    SEP Q13
vs
JUN Q13
 

Copper (‘000 tonnes)

     403.3         6     –13

Lead (tonnes)

     46,445         –11     –31

Zinc (tonnes)

     28,555         10     –38

Silver (‘000 ounces)

     8,688         –8     –25

Uranium oxide concentrate (Uranium) (tonnes)

     970         –6     –12

Copper – Copper production increased by six per cent in the September 2013 quarter to 403 thousand tonnes (BHP Billiton share). The application of IFRS 10 requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically. This report has been prepared on the basis of this new accounting standard and references to BHP Billiton share now include 100 per cent of Escondida. As a consequence, BHP Billiton’s copper production guidance for the 2014 financial year now refers to 1.7 million tonnes, although the Group’s equity interest remains unchanged at 1.2 million tonnes.

Escondida copper production increased by 12 per cent in the September 2013 quarter to 278 thousand tonnes (100 per cent basis) as milling rates improved. An eight per cent reduction from the June 2013 quarter, however, reflected planned maintenance, industrial action and lower copper ore grades, consistent with the mine plan. Escondida remains on track to produce approximately 1.1 million tonnes (100 per cent basis) of copper in the 2014 financial year before increasing to approximately 1.3 million tonnes (100 per cent basis) in the 2015 financial year.

As anticipated, Pampa Norte (Chile) copper production declined by 33 per cent from the June 2013 quarter primarily as a result of lower ore grades and recoveries at Spence. Production at Spence is expected to recover strongly in the second half of the 2014 financial year.

Antamina (Peru) achieved record copper production in the September 2013 quarter which reflected continued strong mill throughput and higher ore grades as mining progressed through a copper rich ore zone. Copper production at Antamina will be affected by lower ore grades in the second half of the 2014 financial year, consistent with the mine plan.

Olympic Dam (Australia) copper production was affected by smelter reliability issues during the September 2013 quarter. A maintenance outage scheduled for the March 2014 quarter will address smelter performance. Copper production at Olympic Dam for the 2014 financial year is expected to be in line with the prior year.

On 11 October 2013, BHP Billiton completed the sale of its Pinto Valley (US) mining operation and the associated San Manuel Arizona Railroad Company to Capstone Mining Corp. for US$650 million, subject to customary working capital adjustments.

Lead/silver – Lead and silver production decreased by 31 per cent and 25 per cent, respectively, from the June 2013 quarter as lower average ore grades affected performance at Cannington (Australia).

Zinc – Zinc production decreased by 38 per cent from the June 2013 quarter, driven by lower average zinc ore grades at Cannington and Antamina.

Uranium – Uranium production decreased by 12 per cent from the June 2013 quarter as a result of lower average uranium ore grades and planned maintenance at Olympic Dam.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    5


Projects

 

Project and ownership

   Capital
expenditure
(US$m)
    Initial
production
target date
   

Capacity

 

Progress

Escondida Oxide Leach Area Project (Chile)

57.5%

     721 iv      H1 CY14      New dynamic leaching pad and mineral handling system. Maintains oxide leaching capacity.   On schedule and budget. The overall project is 76% complete.

Escondida Organic Growth Project 1 (Chile)

57.5%

     3,838 iv      H1 CY15      Replaces the Los Colorados concentrator with a new 152,000 tonnes per day plant.   On schedule and budget. The overall project is 51% complete.

Escondida Water Supply (Chile)

57.5%

     3,430 iv      CY17      New desalination facility to ensure continued water supply to Escondida.   Approval announced. See news release dated 25 July 2013.

 

iv  Following the application of IFRS 10 from 1 July 2013, references to BHP Billiton share include 100 per cent of Escondida.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    6


Iron Ore

Production

 

     SEP
2013
QTR
     SEP Q13
vs
SEP Q12
    SEP Q13
vs
JUN Q13
 

Iron ore (‘000 tonnes)

     48,848         23     2

Iron ore – Iron ore production increased by 23 per cent in the September 2013 quarter to 49 million tonnes (BHP Billiton share).

WAIO achieved record production of 54 million tonnes (100 per cent basis) for the September 2013 quarter. Continued strong operating performance across the supply chain and the successful delivery of first production from the Jimblebar mine, ahead of schedule, contributed to the record result. The ramp up of phase one capacity at Jimblebar to 35 mtpa is expected to be completed by the end of the 2015 financial year.

The optimisation of the supply chain in the Pilbara continues to unlock substantial value and WAIO is now expected to produce 212 million tonnes (100 per cent basis) in the 2014 financial year, a five million tonne increase on prior guidance. Longer term, a low cost option to expand Jimblebar to 55 mtpa and the broader debottlenecking of the supply chain is expected to underpin further capital efficient growth in capacity to approximately 260 mtpa to 270 mtpa (100 per cent basis).

Samarco’s (Brazil) three pellet plants continued to operate at capacity during the period.

Total iron ore production for the 2014 financial year, which includes Samarco, is now expected to increase to 192 million tonnes (BHP Billiton share).

Projects

 

Project and ownership

   Capital
expenditure
(US$m)
    Initial
production
target date
   

Capacity

 

Progress

WAIO Jimblebar Mine Expansion (Australia)

85%

     3,220 v      Q4 CY13      Increases mining and processing capacity to 35 million tonnes per annum with incremental debottlenecking opportunities to 55 million tonnes per annum.   First production achieved in Q3 CY13, ahead of schedule and on revised budget. The overall project is 96% complete.

WAIO Port Blending and Rail Yard Facilities (Australia)

85%

     1,000 v      H2 CY14      Optimises resource and enhances efficiency across the WAIO supply chain.   On schedule and budget on the basis of the revised scope. The overall project is 93% complete.

Samarco Fourth Pellet Plant (Brazil)

50%

     1,750        H1 CY14      Increases iron ore pellet production capacity by 8.3 million tonnes per annum to 30.5 million tonnes per annum.   On schedule and budget. The overall project is 95% complete.

 

v  Excludes announced pre-commitment funding.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    7


Coal

Production

 

     SEP
2013
QTR
     SEP Q13
vs
SEP Q12
    SEP Q13
vs
JUN Q13
 

Metallurgical coal (‘000 tonnes)

     10,185         14     –6

Energy coal (‘000 tonnes)

     19,639         3     6

Metallurgical coal – Metallurgical coal production increased by 14 per cent in the September 2013 quarter to 10 million tonnes (BHP Billiton share).

Queensland Coal (Australia) continued to run at full supply chain capacity during the period with annualised production of 61 million tonnes (100 per cent basis). This strong result was underpinned by the continued ramp up of Daunia, record quarterly production at South Walker Creek and improved Coal Preparation Plant performance at Blackwater and Saraji. This was partially offset by a planned longwall move at Crinum and scheduled Coal Preparation Plant maintenance at Goonyella Riverside and Peak Downs.

Illawarra Coal (Australia) production decreased by 39 per cent from the June 2013 quarter and reflected an extended outage at Dendrobium and a scheduled longwall move at West Cliff. Despite a roof fall at Dendrobium in October 2013, production is expected to improve in the December 2013 quarter, with total Illawarra Coal production weighted towards the second half of the 2014 financial year.

Total metallurgical coal production guidance for the 2014 financial year remains unchanged at 41 million tonnes (BHP Billiton share).

Energy coal – Energy coal production increased by three per cent in the September 2013 quarter to 20 million tonnes (BHP Billiton share). Record quarterly production at both New South Wales Energy Coal (Australia) and Cerrejon Coal (Colombia) contributed to the strong result.

Total energy coal production guidance for the 2014 financial year remains unchanged at 73 million tonnes (BHP Billiton share).

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    8


Projects

 

Project and ownership

   Capital
expenditure
(US$m)
    Initial
production
target date
   

Capacity

 

Progress

Cerrejon P40 Project (Colombia)

33.3%

     437        CY13      Increases saleable thermal coal production by 8 million tonnes per annum to approximately 40 million tonnes per annum.   On schedule and budget. The overall project is 79% complete.

Newcastle Third Port Project Stage 3 (Australia)

35.5%

     367        CY14      Increases total coal terminal capacity from 53 million tonnes per annum to 66 million tonnes per annum.   First coal was loaded in Q2 CY13 and mechanical completion was achieved in Q3 CY13, ahead of schedule and on budget. The overall project is 76% complete.

Caval Ridge (Australia)

50%

     1,870 vi      CY14      Greenfield mine development to produce an initial 5.5 million tonnes per annum of export metallurgical coal.   On schedule and budget. The overall project is 86% complete.

Hay Point Stage Three Expansion (Australia)

50%

     1,505 vi      CY15      Increases port capacity from 44 million tonnes per annum to 55 million tonnes per annum and reduces storm vulnerability.   On revised schedule and budget. The overall project is 72% complete.

Appin Area 9 (Australia)

100%

     845        CY16      Maintains Illawarra Coal’s production capacity with a replacement mining domain and capacity to produce 3.5 million tonnes per annum of metallurgical coal.   On schedule and budget. The overall project is 51% complete.

 

vi  Excludes announced pre-commitment funding.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    9


Aluminium, Manganese and Nickel

Production

 

     SEP
2013
QTR
     SEP Q13
vs
SEP Q12
    SEP Q13
vs
JUN Q13
 

Alumina (‘000 tonnes)

     1,251         7     –1

Aluminium (‘000 tonnes)

     310         15     0

Manganese ore (‘000 tonnes)

     2,046         –5     –9

Manganese alloy (‘000 tonnes)

     137         5     –25

Nickel (‘000 tonnes)

     40.4         9     0

Alumina – Alumina production increased by seven per cent in the September 2013 quarter to 1.3 million tonnes (BHP Billiton share) as the Efficiency and Growth project at Worsley (Australia) approached nameplate capacity.

Aluminium – Aluminium production increased by 15 per cent in the September 2013 quarter to 310 thousand tonnes (BHP Billiton share). Production benefited from strong operating performance at our Southern African smelters which included a second consecutive quarterly production record at Hillside (South Africa).

Manganese ore – Manganese ore production decreased during the September 2013 quarter due to a planned shutdown at Hotazel (South Africa) and lower recoveries at GEMCO (Australia).

Manganese alloy – Manganese alloy volumes increased by five per cent from the September 2012 quarter which was affected by the temporary suspension of operations at TEMCO (Australia). Planned maintenance at Metalloys (South Africa) and TEMCO contributed to the 25 per cent decline in manganese alloy volumes from the June 2013 quarter.

Nickel – Nickel production increased by nine per cent in the September 2013 quarter to 40 thousand tonnes (BHP Billiton share) and reflected strong operating performance at Nickel West (Australia).

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    10


Minerals exploration

Greenfield minerals exploration is focused on advancing copper targets within Chile and Peru. Minerals exploration expenditure in the September 2013 quarter was US$115 million, of which US$105 million was expensedvii.

 

 

This report represents the Interim Management Statement for the purposes of the UK Listing Authority’s Disclosure and Transparency Rules. There have been no significant changes in the financial position of the Group in the quarter ended 30 September 2013.

Further information on BHP Billiton can be found at: www.bhpbilliton.com.

 

Media Relations

  

Investor Relations

Australia

   Australia
Emily Perry    James Agar
Tel: +61 3 9609 2800 Mobile: +61 477 325 803    Tel: +61 3 9609 2222 Mobile: +61 467 807 064
email: Emily.Perry@bhpbilliton.com    email: James.Agar@bhpbilliton.com
Fiona Hadley    Andrew Gunn
Tel: +61 3 9609 2211 Mobile: +61 427 777 908    Tel: +61 3 9609 3575 Mobile: +61 402 087 354
email: Fiona.Hadley@bhpbilliton.com    email: Andrew.Gunn@bhpbilliton.com
Eleanor Nichols    United Kingdom and South Africa

Tel: +61 3 9609 2360 Mobile: +61 407 064 748

email: Eleanor.Nichols@bhpbilliton.com

   Tara Dines
   Tel: +44 20 7802 7113 Mobile: +44 7825 342 232
United Kingdom    email: Tara.Dines@bhpbilliton.com
Ruban Yogarajah    Americas

Tel: +44 20 7802 4033 Mobile: +44 7827 082 022

email: Ruban.Yogarajah@bhpbilliton.com

   James Agar
   Tel: +61 3 9609 2222 Mobile: +61 467 807 064
Jennifer White    email: James.Agar@bhpbilliton.com

Tel: +44 20 7802 7462 Mobile: +44 7827 253 764

email: Jennifer.White@bhpbilliton.com

   Matt Chism
   Tel: +1 713 599 6158 Mobile: +1 281 782 2238
Americas    email: Matt.E.Chism@bhpbilliton.com
Jaryl Strong   

Tel: +1 713 499 5548 Mobile: +1 281 222 6627

email: Jaryl.Strong@bhpbilliton.com

  

 

BHP Billiton Limited ABN 49 004 028 077    BHP Billiton Plc Registration number 3196209
Registered in Australia    Registered in England and Wales
Registered Office: Level 16, 171 Collins Street    Registered Office: Neathouse Place
Melbourne Victoria 3000 Australia    London SW1V 1BH United Kingdom
Tel +61 1300 55 4757 Fax +61 3 9609 3015    Tel +44 20 7802 4000 Fax +44 20 7802 4111

Members of the BHP Billiton Group which is headquartered in Australia

 

vii  Reported on the basis of IFRS 10 which requires the full consolidation of Escondida, as compared to the proportional consolidation of our 57.5 per cent equity interest which has been applied historically.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    11


BHP BILLITON PRODUCTION SUMMARY

 

         QUARTER ENDED     YEAR TO DATE     % CHANGE  
         SEP
2012
    JUN
2013
    SEP
2013
    SEP
2013
    SEP
2012
    SEP Q13
vs
SEP Q12
    SEP Q13
vs
JUN Q13
 

Petroleum

                

Crude oil & condensate

   (‘000 bbl)     18,036        18,559        20,421        20,421        18,036        13     10

Natural gas

   (bcf)     232.85        214.49        219.66        219.66        232.85        –6     2

NGL

   (‘000 boe)     4,411        4,882        5,632        5,632        4,411        28     15

Total petroleum products

   (million boe)     61.3        59.2        62.7        62.7        61.3        2     6

Copper

      

Copper

   (‘000 tonnes)     379.4        461.7        403.3        403.3        379.4        6     –13

Lead

   (tonnes)     52,183        67,034        46,445        46,445        52,183        –11     –31

Zinc

   (tonnes)     25,922        45,881        28,555        28,555        25,922        10     –38

Gold

   (ounces)     39,968        56,070        45,045        45,045        39,968        13     –20

Silver

   (‘000 ounces)     9,446        11,602        8,688        8,688        9,446        –8     –25

Uranium oxide concentrate

   (tonnes)     1,030        1,105        970        970        1,030        –6     –12

Molybdenum

   (tonnes)     454        376        458        458        454        1     22

Iron Ore

                

Iron ore

   (‘000 tonnes)     39,772        47,689        48,848        48,848        39,772        23     2

Coal

                

Metallurgical coal

   (‘000 tonnes)     8,938        10,858        10,185        10,185        8,938        14     –6

Energy coal

   (‘000 tonnes)     19,144        18,561        19,639        19,639        19,144        3     6

Aluminium, Manganese and Nickel

                

Alumina

   (‘000 tonnes)     1,170        1,265        1,251        1,251        1,170        7     –1

Aluminium

   (‘000 tonnes)     269        310        310        310        269        15     0

Manganese ore

   (‘000 tonnes)     2,146        2,246        2,046        2,046        2,146        –5     –9

Manganese alloy

   (‘000 tonnes)     130        182        137        137        130        5     –25

Nickel

   (‘000 tonnes)     37.0        40.3        40.4        40.4        37.0        9     0

Throughout this report figures in italics indicate that this figure has been adjusted since it was previously reported.

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 12


BHP BILLITON ATTRIBUTABLE PRODUCTION

 

           QUARTER ENDED      YEAR TO DATE  
    

BHP Billiton

interest

    SEP
2012
     DEC
2012
     MAR
2013
     JUN
2013
     SEP
2013
     SEP
2013
     SEP
2012
 

Petroleum

                      

Production

                      

Crude oil and condensate (‘000 bbl)

       18,036         19,228         16,689         18,559         20,421         20,421         18,036   

Natural gas (bcf)

       232.85         219.66         207.27         214.49         219.66         219.66         232.85   

NGL (‘000 boe) (a)

       4,411         4,064         4,182         4,882         5,632         5,632         4,411   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total petroleum products (million boe)

       61.3         59.9         55.4         59.2         62.7         62.7         61.3   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Copper (b)

                      

Copper

                      

Payable metal in concentrate (‘000 tonnes)

                      

Escondida (c)

     57.5     176.0         209.9         222.6         223.0         205.1         205.1         176.0   

Antamina

     33.8     40.2         39.6         25.2         34.7         41.9         41.9         40.2   

Pinto Valley

     100     —           0.5         5.3         10.8         10.9         10.9         —     
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       216.2         250.0         253.1         268.5         257.9         257.9         216.2   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Cathode (‘000 tonnes)

                      

Escondida (c)

     57.5     72.3         71.0         75.3         79.3         73.2         73.2         72.3   

Pampa Norte (d)

     100     52.7         58.8         56.4         64.7         43.5         43.5         52.7   

Pinto Valley

     100     1.2         1.2         1.2         1.3         0.8         0.8         1.2   

Olympic Dam

     100     37.0         33.6         47.7         47.9         27.9         27.9         37.0   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       163.2         164.6         180.6         193.2         145.4         145.4         163.2   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Copper

       379.4         414.6         433.7         461.7         403.3         403.3         379.4   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Lead

                      

Payable metal in concentrate (tonnes)

                      

Cannington

     100     51,923         45,937         48,899         66,666         46,287         46,287         51,923   

Antamina

     33.8     260         198         181         368         158         158         260   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       52,183         46,135         49,080         67,034         46,445         46,445         52,183   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Zinc

                      

Payable metal in concentrate (tonnes)

                      

Cannington

     100     11,408         13,622         11,045         20,206         16,033         16,033         11,408   

Antamina

     33.8     14,514         12,587         19,148         25,675         12,522         12,522         14,514   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       25,922         26,209         30,193         45,881         28,555         28,555         25,922   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Gold

                      

Payable metal in concentrate (ounces)

                      

Escondida (c)

     57.5     16,951         18,359         18,626         17,593         17,347         17,347         16,951   

Olympic Dam (refined gold)

     100     23,017         24,215         27,531         38,477         27,649         27,649         23,017   

Pinto Valley

     100     —           —           —           —           49         49         —     
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       39,968         42,574         46,157         56,070         45,045         45,045         39,968   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Silver

                      

Payable metal in concentrate (‘000 ounces)

                      

Escondida (c)

     57.5     631         696         743         890         891         891         631   

Antamina

     33.8     919         934         802         1,297         1,205         1,205         919   

Cannington

     100     7,689         6,949         7,323         9,101         6,361         6,361         7,689   

Olympic Dam (refined silver)

     100     207         193         214         266         190         190         207   

Pinto Valley

     100     —           —           11         48         41         41         —     
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       9,446         8,772         9,093         11,602         8,688         8,688         9,446   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Uranium Oxide Concentrate

                      

Payable metal in concentrate (tonnes)

                      

Olympic Dam

     100     1,030         1,005         926         1,105         970         970         1,030   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       1,030         1,005         926         1,105         970         970         1,030   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Molybdenum

                      

Payable metal in concentrate (tonnes)

                      

Antamina

     33.8     454         410         321         376         458         458         454   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       454         410         321         376         458         458         454   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Refer footnotes on page 15.

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 13


BHP BILLITON ATTRIBUTABLE PRODUCTION

 

           QUARTER ENDED      YEAR TO DATE  
    

BHP Billiton

interest

    SEP
2012
     DEC
2012
     MAR
2013
     JUN
2013
     SEP
2013
     SEP
2013
     SEP
2012
 

Iron Ore

                      

Production (‘000 tonnes) (e)

                      

Newman (f)

     85     11,752         12,809         13,028         15,408         15,362         15,362         11,752   

Goldsworthy Joint Venture

     85     432         378         296         —           202         202         432   

Area C Joint Venture

     85     10,937         10,245         10,983         12,552         11,814         11,814         10,937   

Yandi Joint Venture

     85     13,771         15,954         13,302         17,027         18,146         18,146         13,771   

Jimblebar

     85     —           —           —           —           595         595         —     

Samarco

     50     2,880         2,804         2,596         2,702         2,729         2,729         2,880   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       39,772         42,190         40,205         47,689         48,848         48,848         39,772   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Coal

                      

Metallurgical Coal

                      

Production (‘000 tonnes) (g)

                      

BMA

     50     5,182         5,440         5,327         6,696         6,705         6,705         5,182   

BHP Mitsui Coal (h)

     80     1,766         1,589         1,862         1,846         2,057         2,057         1,766   

Illawarra

     100     1,990         1,859         1,777         2,316         1,423         1,423         1,990   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       8,938         8,888         8,966         10,858         10,185         10,185         8,938   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Energy Coal

                      

Production (‘000 tonnes)

                      

South Africa (i)

     90     8,454         7,969         7,302         7,902         7,937         7,937         8,454   

USA

     100     3,408         3,280         3,351         2,752         3,145         3,145         3,408   

Australia

     100     4,453         4,827         3,837         4,893         5,372         5,372         4,453   

Colombia

     33     2,829         2,662         1,512         3,014         3,185         3,185         2,829   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       19,144         18,738         16,002         18,561         19,639         19,639         19,144   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Aluminium, Manganese and Nickel

                      

Alumina

                      

Saleable production (‘000 tonnes)

                      

Worsley

     86     859         944         911         961         946         946         859   

Alumar

     36     311         288         302         304         305         305         311   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       1,170         1,232         1,213         1,265         1,251         1,251         1,170   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Aluminium

                      

Production (‘000 tonnes)

                      

Hillside

     100     139         167         178         181         184         184         139   

Bayside

     100     24         24         24         24         24         24         24   

Alumar

     40     39         39         37         39         35         35         39   

Mozal

     47     67         67         64         66         67         67         67   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       269         297         303         310         310         310         269   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Manganese Ores

                      

Saleable production (‘000 tonnes)

                      

South Africa (j)

     44.4     858         834         859         939         864         864         858   

Australia (j)

     60     1,288         1,283         1,149         1,307         1,182         1,182         1,288   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       2,146         2,117         2,008         2,246         2,046         2,046         2,146   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Manganese Alloys

                      

Saleable production (‘000 tonnes)

                      

South Africa (j) (k)

     60     93         91         86         104         86         86         93   

Australia (j)

     60     37         62         57         78         51         51         37   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       130         153         143         182         137         137         130   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Nickel

                      

Saleable production (‘000 tonnes)

                      

Cerro Matoso

     99.9     13.3         12.4         12.3         12.8         12.0         12.0         13.3   

Nickel West

     100     23.7         22.3         29.8         27.5         28.4         28.4         23.7   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

       37.0         34.7         42.1         40.3         40.4         40.4         37.0   
    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Refer footnotes on page 15.

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 14


BHP BILLITON ATTRIBUTABLE PRODUCTION

 

(a) LPG and ethane are reported as Natural Gas Liquid (NGL). Product-specific conversions are made and NGL is reported in barrels of oil equivalent (boe).
(b) Metal production is reported on the basis of payable metal.
(c) Shown on 100% basis following the application of the new IFRS 10 which came into effect from 1 July 2013. BHP Billiton interest in saleable production is 57.5%.
(d) Includes Cerro Colorado and Spence.
(e) Iron ore production is reported on a wet tonnes basis.
(f) Newman includes Mt Newman Joint Venture and Wheelarra.
(g) Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.
(h) Shown on 100% basis. BHP Billiton interest in saleable production is 80%.
(i) Shown on 100% basis. BHP Billiton interest in saleable production is 90%.
(j) Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.
(k) Production includes Medium Carbon Ferro Manganese.

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 15


PRODUCTION AND SALES REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     SEP      DEC      MAR      JUN      SEP      SEP      SEP  
     2012      2012      2013      2013      2013      2013      2012  

Petroleum

                    

BHP Billiton attributable production unless otherwise stated.

  

Crude oil and condensate (‘000 barrels)

                    

Bass Strait

     2,569         2,081         1,934         2,229         2,247         2,247         2,569   

North West Shelf

     1,867         1,829         1,526         1,646         1,865         1,865         1,867   

Stybarrow

     534         464         323         401         348         348         534   

Pyrenees

     2,605         2,379         1,659         1,817         1,707         1,707         2,605   

Other Australia (a)

     17         15         15         12         14         14         17   

Atlantis (b)

     1,554         2,376         1,471         2,594         2,953         2,953         1,554   

Mad Dog (b)

     369         906         791         649         732         732         369   

Shenzi (b)

     3,783         4,008         3,580         3,378         3,467         3,467         3,783   

Onshore US (c)

     2,358         2,658         3,071         3,614         5,044         5,044         2,358   

Trinidad/Tobago

     376         362         331         259         320         320         376   

Other Americas (b) (d)

     367         410         384         403         378         378         367   

UK (e)

     260         355         326         282         142         142         260   

Algeria

     1,309         1,316         1,207         1,210         1,142         1,142         1,309   

Pakistan

     68         69         71         65         62         62         68   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     18,036         19,228         16,689         18,559         20,421         20,421         18,036   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Natural gas (billion cubic feet)

                    

Bass Strait

     40.06         26.67         23.38         33.63         34.20         34.20         40.06   

North West Shelf

     35.33         34.09         31.29         30.29         34.18         34.18         35.33   

Other Australia (a)

     6.20         5.48         5.17         4.54         9.32         9.32         6.20   

Atlantis (b)

     0.59         0.89         0.54         0.83         1.26         1.26         0.59   

Mad Dog (b)

     0.06         0.18         0.15         0.05         0.11         0.11         0.06   

Shenzi (b)

     2.11         0.94         0.81         0.78         0.80         0.80         2.11   

Onshore US (c)

     122.59         123.03         115.69         118.08         114.89         114.89         122.59   

Trinidad/Tobago

     9.21         9.15         8.84         9.07         9.90         9.90         9.21   

Other Americas (b) (d)

     0.35         0.48         0.59         0.29         0.27         0.27         0.35   

UK (e)

     3.29         5.26         6.44         4.09         3.47         3.47         3.29   

Pakistan

     13.06         13.49         14.37         12.84         11.26         11.26         13.06   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     232.85         219.66         207.27         214.49         219.66         219.66         232.85   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

NGL (‘000 barrels of oil equivalent)

                    

Bass Strait

     2,053         1,342         1,405         1,753         2,001         2,001         2,053   

North West Shelf

     385         354         323         312         399         399         385   

Atlantis (b)

     54         209         96         200         255         255         54   

Mad Dog (b)

     16         72         55         —           38         38         16   

Shenzi (b)

     370         324         269         224         266         266         370   

Onshore US (c)

     1,516         1,736         2,004         2,375         2,656         2,656         1,516   

Other Americas (b) (d)

     17         16         13         9         11         11         17   

UK (e)

     —           11         17         9         6         6         —     
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     4,411         4,064         4,182         4,882         5,632         5,632         4,411   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 
                    
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total Petroleum Products

     61.3         59.9         55.4         59.2         62.7         62.7         61.3   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

(million barrels of oil equivalent) (f)

                    

 

(a) Other Australia includes Minerva and Macedon. Macedon achieved first production in August 2013.
(b) Gulf of Mexico volumes are net of royalties.
(c) Onshore US volumes are net of mineral holder royalties.
(d) Other Americas includes Neptune, Genesis and Overriding Royalty Interest.
(e) An agreement to sell Liverpool Bay was reached in October 2013 and the transaction is expected to close before the end of the 2014 financial year.
(f) Total barrels of oil equivalent (boe) conversions are based on 6,000 scf of natural gas equals 1 boe.

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 16


PRODUCTION AND SALES REPORT

 

          QUARTER ENDED     YEAR TO DATE  
          SEP     DEC     MAR     JUN     SEP     SEP     SEP  
          2012     2012     2013     2013     2013     2013     2012  

Copper

                 

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

  

Escondida, Chile (a)

                 

Material mined

   (‘000 tonnes)      102,499        96,938        94,567        98,665        93,744        93,744        102,499   

Sulphide ore milled

   (‘000 tonnes)      16,850        18,796        18,964        19,295        18,276        18,276        16,850   

Average copper grade

   (%)      1.35     1.39     1.44     1.42     1.37     1.37     1.35

Production ex mill

   (‘000 tonnes)      185.2        216.6        229.3        231.9        210.6        210.6        185.2   

Production

                 

Payable copper

   (‘000 tonnes)      176.0        209.9        222.6        223.0        205.1        205.1        176.0   

Payable gold concentrate

   (fine ounces)      16,951        18,359        18,626        17,593        17,347        17,347        16,951   

Copper cathode (EW)

   (‘000 tonnes)      72.3        71.0        75.3        79.3        73.2        73.2        72.3   

Payable silver concentrate

   (‘000 ounces)      631        696        743        890        891        891        631   

Sales

                 

Payable copper

   (‘000 tonnes)      165.6        226.6        215.8        228.2        192.3        192.3        165.6   

Payable gold concentrate

   (fine ounces)      15,650        19,235        18,325        15,831        12,490        12,490        15,650   

Copper cathode (EW)

   (‘000 tonnes)      67.5        81.4        59.1        95.0        63.0        63.0        67.5   

Payable silver concentrate

   (‘000 ounces)      563        772        720        908        836        836        563   

(a)    Shown on 100% basis following the application of the new IFRS 10 which came into effect from 1 July 2013. BHP Billiton interest in saleable production is 57.5%.

        

Pampa Norte, Chile

                 

Cerro Colorado

                 

Material mined

   (‘000 tonnes)        16,067        15,722        14,964        16,303        15,771        15,771        16,067   

Ore milled

   (‘000 tonnes)      4,505        4,206        4,350        4,351        4,161        4,161        4,505   

Average copper grade

   (%)      0.55     0.66     0.65     0.82     0.78     0.78     0.55

Production

                 

Copper cathode (EW)

   (‘000 tonnes)      17.8        17.9        14.6        21.2        17.6        17.6        17.8   

Sales

                 

Copper cathode (EW)

   (‘000 tonnes)      16.1        18.8        13.7        21.7        17.3        17.3        16.1   

Spence

                 

Material mined

   (‘000 tonnes)      27,541        25,999        28,861        28,646        24,331        24,331        27,541   

Ore milled

   (‘000 tonnes)      3,752        4,161        4,041        4,146        4,860        4,860        3,752   

Average copper grade

   (%)      1.17     1.29     1.38     1.16     1.11     1.11     1.17

Production

                 

Copper cathode (EW)

   (‘000 tonnes)      34.9        40.9        41.8        43.5        25.9        25.9        34.9   

Sales

                 

Copper cathode (EW)

   (‘000 tonnes)      31.1        42.6        29.8        57.9        25.9        25.9        31.1   

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 17


PRODUCTION AND SALES REPORT

 

          QUARTER ENDED     YEAR TO DATE  
          SEP     DEC     MAR     JUN     SEP     SEP     SEP  
          2012     2012     2013     2013     2013     2013     2012  

Copper

                 

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

  

Antamina, Peru

                 

Material mined (100%)

   (‘000 tonnes)      54,482        49,246        48,032        56,254        56,428        56,428        54,482   

Sulphide ore milled (100%)

   (‘000 tonnes)      12,274        11,752        10,330        12,424        11,765        11,765        12,274   

Average head grades

                 

- Copper

   (%)      1.15     1.16     0.88     1.03     1.21     1.21     1.15

- Zinc

   (%)      0.66     0.64     0.93     1.02     0.56     0.56     0.66

Production

                 

Payable copper

   (‘000 tonnes)      40.2        39.6        25.2        34.7        41.9        41.9        40.2   

Payable zinc

   (tonnes)      14,514        12,587        19,148        25,675        12,522        12,522        14,514   

Payable silver

   (‘000 ounces)      919        934        802        1,297        1,205        1,205        919   

Payable lead

   (tonnes)      260        198        181        368        158        158        260   

Payable molybdenum

   (tonnes)      454        410        321        376        458        458        454   

Sales

                 

Payable copper

   (‘000 tonnes)      39.7        42.7        24.1        31.9        41.3        41.3        39.7   

Payable zinc

   (tonnes)      15,519        17,874        16,062        22,560        16,123        16,123        15,519   

Payable silver

   (‘000 ounces)      849        1,101        772        1,165        1,503        1,503        849   

Payable lead

   (tonnes)      330        276        115        262        297        297        330   

Payable molybdenum

   (tonnes)      536        381        371        283        411        411        536   

Cannington, Australia

                 

Material mined

   (‘000 tonnes)      717        817        810        802        893        893        717   

Ore milled

   (‘000 tonnes)      773        793        713        866        750        750        773   

Average head grades

                 

- Silver

   (g/t)      355        317        364        401        315        315        355   

- Lead

   (%)      7.6     7.0     7.7     9.1     7.4     7.4     7.6

- Zinc

   (%)      2.5     2.9     2.7     3.8     3.2     3.2     2.5

Production

                 

Payable silver

   (‘000 ounces)      7,689        6,949        7,323        9,101        6,361        6,361        7,689   

Payable lead

   (tonnes)      51,923        45,937        48,899        66,666        46,287        46,287        51,923   

Payable zinc

   (tonnes)      11,408        13,622        11,045        20,206        16,033        16,033        11,408   

Sales

                 

Payable silver

   (‘000 ounces)      8,506        6,694        7,265        7,793        7,844        7,844        8,506   

Payable lead

   (tonnes)      59,042        46,319        48,661        64,633        56,500        56,500        59,042   

Payable zinc

   (tonnes)      10,379        16,321        9,439        21,056        17,286        17,286        10,379   

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 18


PRODUCTION AND SALES REPORT

 

          QUARTER ENDED     YEAR TO DATE  
          SEP     DEC     MAR     JUN     SEP     SEP     SEP  
          2012     2012     2013     2013     2013     2013     2012  

Copper

                 

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

  

Olympic Dam, Australia

                 

Material mined (a)

   (‘000 tonnes)      2,226        2,123        2,448        2,750        2,897        2,897        2,226   

Ore milled

   (‘000 tonnes)      2,471        2,435        2,353        2,641        2,404        2,404        2,471   

Average copper grade

   (%)      1.90     1.71     1.73     1.86     1.85     1.85     1.90

Average uranium grade

   (kg/t)      0.54        0.51        0.50        0.56        0.53        0.53        0.54   

Production

                 

Copper cathode (ER)

   (‘000 tonnes)      34.0        30.4        44.7        45.1        25.9        25.9        34.0   

Copper cathode (EW)

   (‘000 tonnes)      3.0        3.2        3.0        2.8        2.0        2.0        3.0   

Uranium oxide concentrate

   (tonnes)      1,030        1,005        926        1,105        970        970        1,030   

Refined gold

   (fine ounces)      23,017        24,215        27,531        38,477        27,649        27,649        23,017   

Refined silver

   (‘000 ounces)      207        193        214        266        190        190        207   

Sales

                 

Copper cathode (ER)

   (‘000 tonnes)      35.1        33.2        40.1        46.4        26.8        26.8        35.1   

Copper cathode (EW)

   (‘000 tonnes)      3.4        2.7        3.1        3.5        2.1        2.1        3.4   

Uranium oxide concentrate

   (tonnes)      615        1,343        816        1,374        930        930        615   

Refined gold

   (fine ounces)      20,949        25,227        24,678        38,394        21,675        21,675        20,949   

Refined silver

   (‘000 ounces)      265        169        211        275        176        176        265   

(a)    Material mined refers to run of mine ore mined and hoisted.

       

Pinto Valley, US (a)

                 

Production

                 

Payable copper

   (‘000 tonnes)      —          0.5        5.3        10.8        10.9        10.9        —     

Copper cathode (EW)

   (‘000 tonnes)      1.2        1.2        1.2        1.3        0.8        0.8        1.2   

Payable silver

   (‘000 ounces)      —          —          11        48        41        41        —     

Payable gold

   (ounces)      —          —          —          —          49        49        —     

Sales

                 

Payable copper

   (‘000 tonnes)      —          —          2.6        9.9        7.3        7.3        —     

Copper cathode (EW)

   (‘000 tonnes)      1.2        1.2        1.1        1.4        1.1        1.1        1.2   

Payable silver

   (‘000 ounces)      —          —          11        48        41        41        —     

Payable gold

   (ounces)      —          —          —          —          49        49        —     

(a)    On 11 October 2013 BHP Billiton completed the sale of its Pinto Valley operations.

       

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 19


PRODUCTION AND SALES REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     SEP      DEC      MAR      JUN      SEP      SEP      SEP  
     2012      2012      2013      2013      2013      2013      2012  

Iron Ore

                    

BHP Billiton attributable production and sales unless otherwise stated.

  

(‘000 tonnes)

                    

Iron Ore

                    

Pilbara, Australia

                    

Production (a)

                    

Newman (b)

     11,752         12,809         13,028         15,408         15,362         15,362         11,752   

Goldsworthy Joint Venture

     432         378         296         —           202         202         432   

Area C Joint Venture

     10,937         10,245         10,983         12,552         11,814         11,814         10,937   

Yandi Joint Venture

     13,771         15,954         13,302         17,027         18,146         18,146         13,771   

Jimblebar

     —           —           —           —           595         595         —     
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total (BHP Billiton share)

     36,892         39,386         37,609         44,987         46,119         46,119         36,892   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total production (100%)

     43,403         46,337         44,245         52,926         54,258         54,258         43,403   

Sales

                    

Lump

     8,338         9,806         9,339         11,284         10,292         10,292         8,338   

Fines

     28,718         30,479         28,370         34,621         35,235         35,235         28,718   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total (BHP Billiton share)

     37,056         40,285         37,709         45,905         45,527         45,527         37,056   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total sales (100%)

     43,595         47,393         44,363         54,006         53,561         53,561         43,595   

(a)    Iron ore production and sales are reported on a wet tonnes basis.

(b)    Newman includes Mt Newman Joint Venture and Wheelarra.

       

       

Samarco, Brazil

                    

Production (a)

     2,880         2,804         2,596         2,702         2,729         2,729         2,880   

Sales

     2,622         3,227         2,515         2,651         2,676         2,676         2,622   

(a)    Iron ore production and sales are reported on a wet tonnes basis.

       

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 20


PRODUCTION AND SALES REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     SEP      DEC      MAR      JUN      SEP      SEP      SEP  
     2012      2012      2013      2013      2013      2013      2012  

Coal

                    

BHP Billiton attributable production and sales unless otherwise stated.

  

(‘000 tonnes)

  

Metallurgical Coal

                    

Queensland, Australia

                    

Production (a)

                    

BMA

                    

Blackwater

     1,148         1,588         1,157         1,539         1,691         1,691         1,148   

Goonyella

     1,535         1,392         1,478         1,816         1,737         1,737         1,535   

Peak Downs

     1,029         1,151         1,225         1,140         1,112         1,112         1,029   

Saraji

     773         994         711         971         1,197         1,197         773   

Gregory Joint Venture (b)

     697         315         657         854         464         464         697   

Daunia

     —           —           99         376         504         504         —     
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

BMA total

     5,182         5,440         5,327         6,696         6,705         6,705         5,182   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

BHP Mitsui Coal (c)

                    

South Walker Creek

     1,084         864         1,188         1,215         1,298         1,298         1,084   

Poitrel

     682         725         674         631         759         759         682   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

BHP Mitsui Coal total

     1,766         1,589         1,862         1,846         2,057         2,057         1,766   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Queensland total

     6,948         7,029         7,189         8,542         8,762         8,762         6,948   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

Coking coal

     4,058         5,561         4,933         6,316         6,123         6,123         4,058   

Weak coking coal

     1,545         1,820         2,029         2,417         2,397         2,397         1,545   

Thermal coal

     239         237         75         30         160         160         239   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     5,842         7,618         7,037         8,763         8,680         8,680         5,842   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

(a)    Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(b)    Gregory open-cut ceased production on 10 October 2012.

(c)    Shown on 100% basis. BHP Billiton interest in saleable production is 80%.

       

       

       

Illawarra, Australia

                    

Production (a)

     1,990         1,859         1,777         2,316         1,423         1,423         1,990   

Sales

                    

Coking coal

     1,775         1,785         1,595         1,877         1,084         1,084         1,775   

Thermal coal

     502         327         145         436         359         359         502   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     2,277         2,112         1,740         2,313         1,443         1,443         2,277   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

(a)    Metallurgical coal production is reported on the basis of saleable product. Production figures include some thermal coal.

       

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 21


PRODUCTION AND SALES REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     SEP      DEC      MAR      JUN      SEP      SEP      SEP  
     2012      2012      2013      2013      2013      2013      2012  

Coal

                    

BHP Billiton attributable production and sales unless otherwise stated.

  

(‘000 tonnes)

                    

Energy Coal

                    

South Africa (a)

                    

Production

     8,454         7,969         7,302         7,902         7,937         7,937         8,454   

Sales

                    

Export

     3,385         3,583         3,604         3,363         2,504         2,504         3,385   

Local utility

     4,869         4,615         4,171         4,353         4,543         4,543         4,869   

Inland

     38         28         32         24         —           —           38   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     8,292         8,226         7,807         7,740         7,047         7,047         8,292   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

(a)    Shown on 100% basis. BHP Billiton interest in saleable production is 90%.

       

New Mexico, US

                    

Production

                    

Navajo Coal

     1,943         2,012         1,944         1,569         1,670         1,670         1,943   

San Juan Coal

     1,465         1,268         1,407         1,183         1,475         1,475         1,465   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     3,408         3,280         3,351         2,752         3,145         3,145         3,408   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales - local utility

     3,420         3,265         3,275         2,815         3,129         3,129         3,420   

NSW Energy Coal, Australia

                    

Production

     4,453         4,827         3,837         4,893         5,372         5,372         4,453   

Sales

                    

Export

     4,488         4,187         4,505         4,289         4,037         4,037         4,488   

Inland

     250         265         174         478         446         446         250   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     4,738         4,452         4,679         4,767         4,483         4,483         4,738   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Cerrejon Coal, Colombia

                    

Production

     2,829         2,662         1,512         3,014         3,185         3,185         2,829   

Sales - export

     2,630         2,702         1,774         3,157         3,155         3,155         2,630   

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 22


PRODUCTION AND SALES REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     SEP      DEC      MAR      JUN      SEP      SEP      SEP  
     2012      2012      2013      2013      2013      2013      2012  

Aluminium, Manganese and Nickel

                    

BHP Billiton attributable production and sales unless otherwise stated.

                    

(‘000 tonnes)

                    

Alumina

                    

Saleable production

                    

Worsley, Australia

     859         944         911         961         946         946         859   

Alumar, Brazil

     311         288         302         304         305         305         311   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     1,170         1,232         1,213         1,265         1,251         1,251         1,170   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

Worsley, Australia

     820         916         910         1,031         897         897         820   

Alumar, Brazil

     352         298         296         329         278         278         352   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     1,172         1,214         1,206         1,360         1,175         1,175         1,172   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Aluminium

                    

Production

                    

Hillside, South Africa

     139         167         178         181         184         184         139   

Bayside, South Africa

     24         24         24         24         24         24         24   

Alumar, Brazil

     39         39         37         39         35         35         39   

Mozal, Mozambique

     67         67         64         66         67         67         67   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     269         297         303         310         310         310         269   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

Hillside, South Africa

     139         171         166         191         180         180         139   

Bayside, South Africa

     26         26         27         26         24         24         26   

Alumar, Brazil

     46         41         39         38         34         34         46   

Mozal, Mozambique

     58         65         76         65         68         68         58   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     269         303         308         320         306         306         269   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Manganese ore

                    

Saleable production

                    

South Africa (a)

     858         834         859         939         864         864         858   

Australia (a)

     1,288         1,283         1,149         1,307         1,182         1,182         1,288   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     2,146         2,117         2,008         2,246         2,046         2,046         2,146   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

South Africa (a)

     878         808         835         970         920         920         878   

Australia (a)

     1,171         979         1,326         1,102         1,078         1,078         1,171   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     2,049         1,787         2,161         2,072         1,998         1,998         2,049   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Manganese alloy

                    

Saleable production

                    

South Africa (a) (b)

     93         91         86         104         86         86         93   

Australia (a)

     37         62         57         78         51         51         37   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     130         153         143         182         137         137         130   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

South Africa (a) (b)

     74         112         89         110         88         88         74   

Australia (a)

     46         52         68         61         54         54         46   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Total

     120         164         157         171         142         142         120   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

(a)    Shown on 100% basis. BHP Billiton interest in saleable production is 60%, except Hotazel Manganese Mines which is 44.4%.

(b)    Production includes Medium Carbon Ferro Manganese.

       

       

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 23


PRODUCTION AND SALES REPORT

 

     QUARTER ENDED      YEAR TO DATE  
     SEP      DEC      MAR      JUN      SEP      SEP      SEP  
     2012      2012      2013      2013      2013      2013      2012  

Aluminium, Manganese and Nickel

                    

BHP Billiton attributable production and sales unless otherwise stated.

  

(‘000 tonnes)

                    

Nickel

                    

Cerro Matoso, Colombia

                    

Production

       13.3           12.4           12.3           12.8           12.0           12.0           13.3   

Sales

     12.3         13.7         13.0         13.1         12.6         12.6         12.3   

Nickel West, Australia

                    

Saleable production

                    

Nickel contained in concentrate

     1.3         4.1         3.1         3.0         3.4         3.4         1.3   

Nickel contained in finished matte

     5.8         7.6         9.7         8.6         8.8         8.8         5.8   

Nickel metal

     16.6         10.6         17.0         15.9         16.2         16.2         16.6   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Nickel production

     23.7         22.3         29.8         27.5         28.4         28.4         23.7   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Sales

                    

Nickel contained in concentrate

     1.6         2.9         3.1         3.0         2.7         2.7         1.6   

Nickel contained in finished matte

     6.7         7.0         9.0         9.7         7.8         7.8         6.7   

Nickel metal

     14.2         12.8         19.5         17.7         15.3         15.3         14.2   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

Nickel sales

     22.5         22.7         31.6         30.4         25.8         25.8         22.5   
  

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

    

 

 

 

 

BHP Billiton operational review for the quarter ended 30 September 2013    Page 24


SIGNATURES

Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized.

 

    BHP Billiton Limited and BHP Billiton Plc
Date: October 22, 2013   By:  

/s/ Jane McAloon

  Name:   Jane McAloon
  Title:   Group Company Secretary