Date: 26 October 2001
Ref: 24/01
BHP Billiton Production Report for the Quarter
Ended 30 September 2001
BHP Billiton today released its production report for the quarter ended 30 September, 2001. Production of most major commodities was in line with both the corresponding period last year and the June 2001 quarter.
***
Further news and information can be found on our Internet site: www.bhpbilliton.com
Australia
Dr Robert Porter, Investor Relations
Tel:+61 3 9609 3540
Mobile: +61 419 587 456
Email: Robert.Porter@bhpbilliton.com
Mandy Frostick, Media Relations
Tel:+61 3 9609 4157
Mobile: +61 419 546 245
Email: Mandy.J.Frostick@bhpbilliton.com
United States
Francis McAllister, Investor Relations
Tel: +1 713 961 8625
Mobile: +1 713 480 3699
Email: Francis.R.McAllister@bhpbilliton.com
United Kingdom
Marc Gonsalves, Investor Relations & Communications
Tel:+44 20 7747 3956
Mobile: +44 7768 264 950
Email: Marc.Gonsalves@bhpbilliton.com
Ariane Gentil, Manager Communications
Tel:+44 20 7747 3977
Mobile: +44 7881 518 715
Email: Ariane.Gentil@bhpbilliton.com
South Africa
Michael Campbell, Investor & Media Relations
Tel:+27 11 376 3360
Mobile: +27 82 458 2587
Email: Michael.J.Campbell@bhpbilliton.com
BHP Billiton Limited ABN 49 004 028 077 |
BHP Billiton Plc Registration number 3196209 Registered Office: 1-3 Strand London WC2N 5HA United Kingdom Telephone +44 20 7747 3800 Facsimile +44 20 7747 3900 |
The BHP Billiton Group is headquartered in Australia
BHP BILLITON PRODUCTION SUMMARY |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
% CHANGE |
|||||||||||||||||||
SEPT Q01 |
SEPT Q01 |
||||||||||||||||||||
SEPT |
JUNE |
SEPT |
SEPT |
SEPT |
vs |
vs |
|||||||||||||||
2000 |
2001 |
2001 |
2001 |
2000 |
SEPT Q00 |
JUNE Q01 |
|||||||||||||||
ALUMINIUM |
|||||||||||||||||||||
Alumina |
('000 tonnes) |
539 |
998 |
964 |
964 |
539 |
79% |
-3% |
|||||||||||||
Aluminium |
('000 tonnes) |
233 |
250 |
244 |
244 |
233 |
5% |
-2% |
|||||||||||||
BASE METALS |
|||||||||||||||||||||
Copper |
('000 tonnes) |
212.3 |
253.6 |
202.0 |
202.0 |
212.3 |
-5% |
-20% |
|||||||||||||
Lead |
(tonnes) |
52,944 |
55,757 |
54,074 |
54,074 |
52,944 |
2% |
-3% |
|||||||||||||
Zinc |
(tonnes) |
29,512 |
30,543 |
29,462 |
29,462 |
29,512 |
0% |
-4% |
|||||||||||||
Gold |
(ounces) |
175,039 |
192,580 |
69,954 |
69,954 |
175,039 |
-60% |
-64% |
|||||||||||||
Silver |
('000 ounces) |
8,075 |
8,064 |
8,183 |
8,183 |
8,075 |
1% |
1% |
|||||||||||||
Molybdenum |
('000 tonnes) |
- |
0.1 |
0.1 |
0.1 |
- |
na |
-18% |
|||||||||||||
CARBON STEEL MATERIALS |
|||||||||||||||||||||
Iron ore |
('000 tonnes) |
17,280 |
17,074 |
17,080 |
17,080 |
17,280 |
-1% |
0% |
|||||||||||||
Metallurgical coal |
('000 tonnes) |
7,964 |
10,802 |
8,365 |
8,365 |
7,964 |
5% |
-23% |
|||||||||||||
Manganese ores |
('000 tonnes) |
1,024 |
936 |
973 |
973 |
1,024 |
-5% |
4% |
|||||||||||||
Manganese alloys |
('000 tonnes) |
175 |
136 |
119 |
119 |
175 |
-32% |
-13% |
|||||||||||||
Hot briquetted iron |
('000 tonnes) |
105 |
276 |
386 |
386 |
105 |
268% |
40% |
|||||||||||||
STAINLESS STEEL MATERIALS |
|||||||||||||||||||||
Nickel |
('000 tonnes) |
12.8 |
16.8 |
15.9 |
15.9 |
12.8 |
24% |
-5% |
|||||||||||||
Chrome ores |
('000 tonnes) |
921 |
665 |
629 |
629 |
921 |
-32% |
-5% |
|||||||||||||
Ferrochrome |
('000 tonnes) |
273 |
194 |
207 |
207 |
273 |
-24% |
7% |
|||||||||||||
ENERGY COAL |
('000 tonnes) |
20,842 |
23,134 |
22,405 |
22,405 |
20,842 |
7% |
-3% |
|||||||||||||
PETROLEUM |
|||||||||||||||||||||
Crude oil and condensate |
('000 bbl) |
20,817 |
18,378 |
19,492 |
19,492 |
20,817 |
-6% |
6% |
|||||||||||||
Natural gas |
(bcf) |
61.75 |
71.64 |
71.24 |
71.24 |
61.75 |
15% |
-1% |
|||||||||||||
LPG |
('000 tonnes) |
172.77 |
175.60 |
182.71 |
182.71 |
172.77 |
6% |
4% |
|||||||||||||
Ethane |
('000 tonnes) |
23.19 |
18.53 |
24.05 |
24.05 |
23.19 |
4% |
30% |
|||||||||||||
BHP STEEL |
|||||||||||||||||||||
Raw steel |
('000 tonnes) |
1,455 |
1,328 |
1,382 |
1,382 |
1,455 |
-5% |
4% |
|||||||||||||
Marketable steel products |
('000 tonnes) |
1,425 |
1,469 |
1,377 |
1,377 |
1,425 |
-3% |
-6% |
|||||||||||||
EXPLOR'N, TECH & NEW BUS |
|||||||||||||||||||||
Diamonds |
('000 carats) |
309 |
427 |
767 |
767 |
309 |
148% |
80% |
|||||||||||||
BHP BILLITON ATTRIBUTABLE PRODUCTION |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
BHP Billiton |
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
||||||||||||||
Interest |
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
||||||||||||||
ALUMINIUM |
|||||||||||||||||||||
ALUMINA |
|||||||||||||||||||||
Production ('000 tonnes) |
|||||||||||||||||||||
Worsley (a) |
86% |
206 |
211 |
541 |
674 |
662 |
662 |
206 |
|||||||||||||
Suriname |
45% |
213 |
215 |
213 |
211 |
219 |
219 |
213 |
|||||||||||||
Alumar |
36% |
120 |
107 |
114 |
113 |
83 |
83 |
120 |
|||||||||||||
Total |
539 |
533 |
868 |
998 |
964 |
964 |
539 |
||||||||||||||
ALUMINIUM |
|||||||||||||||||||||
Production ('000 tonnes) |
|||||||||||||||||||||
Hillside |
100% |
126 |
127 |
122 |
123 |
125 |
125 |
126 |
|||||||||||||
Bayside |
100% |
46 |
45 |
44 |
43 |
44 |
44 |
46 |
|||||||||||||
Alumar |
46.3% |
43 |
44 |
42 |
43 |
35 |
35 |
43 |
|||||||||||||
Valesul |
45.5% |
11 |
12 |
11 |
9 |
8 |
8 |
11 |
|||||||||||||
Mozal (b) |
47% |
7 |
23 |
31 |
32 |
32 |
32 |
7 |
|||||||||||||
Total |
233 |
251 |
250 |
250 |
244 |
244 |
233 |
||||||||||||||
BASE METALS (c) |
|||||||||||||||||||||
COPPER |
|||||||||||||||||||||
Payable metal ('000 tonnes) |
|||||||||||||||||||||
Escondida |
57.5% |
109.5 |
105.8 |
98.3 |
89.1 |
89.3 |
89.3 |
109.5 |
|||||||||||||
Ok Tedi (d) |
52% |
49.8 |
54.1 |
51.7 |
53.4 |
- |
- |
49.8 |
|||||||||||||
Tintaya |
100% |
22.5 |
24.0 |
18.4 |
20.1 |
20.9 |
20.9 |
22.5 |
|||||||||||||
Alumbrera (e) |
25% |
- |
9.9 |
10.8 |
11.9 |
11.6 |
11.6 |
- |
|||||||||||||
Highland Valley (e) |
33.6% |
- |
16.0 |
14.8 |
14.1 |
16.1 |
16.1 |
- |
|||||||||||||
Selbaie |
100% |
3.4 |
3.2 |
3.3 |
2.8 |
2.5 |
2.5 |
3.4 |
|||||||||||||
Total |
185.2 |
213.0 |
197.3 |
191.4 |
140.4 |
140.4 |
185.2 |
||||||||||||||
Refined production ('000 tonnes) |
|||||||||||||||||||||
Escondida |
57.5% |
20.0 |
20.5 |
21.0 |
22.0 |
21.9 |
21.9 |
20.0 |
|||||||||||||
Cerro Colorado (e) |
100% |
- |
31.0 |
32.0 |
34.0 |
34.0 |
34.0 |
- |
|||||||||||||
San Manuel |
100% |
2.8 |
2.7 |
2.5 |
2.3 |
2.3 |
2.3 |
2.8 |
|||||||||||||
Pinto Valley |
100% |
4.3 |
4.4 |
4.0 |
3.8 |
3.4 |
3.4 |
4.3 |
|||||||||||||
Total |
27.1 |
58.6 |
59.5 |
62.2 |
61.6 |
61.6 |
27.1 |
||||||||||||||
LEAD |
|||||||||||||||||||||
Payable metal (tonnes) |
|||||||||||||||||||||
Cannington |
100% |
51,328 |
49,503 |
45,228 |
54,271 |
52,879 |
52,879 |
51,328 |
|||||||||||||
Pering |
100% |
1,616 |
1,601 |
1,321 |
1,486 |
1,195 |
1,195 |
1,616 |
|||||||||||||
Total |
52,944 |
51,104 |
46,549 |
55,757 |
54,074 |
54,074 |
52,944 |
||||||||||||||
ZINC |
|||||||||||||||||||||
Payable metal (tonnes) |
|||||||||||||||||||||
Cannington |
100% |
13,148 |
17,994 |
15,877 |
17,176 |
14,058 |
14,058 |
13,148 |
|||||||||||||
Selbaie |
100% |
11,359 |
10,812 |
8,868 |
7,969 |
9,456 |
9,456 |
11,359 |
|||||||||||||
Pering |
100% |
5,005 |
5,499 |
5,010 |
5,398 |
5,948 |
5,948 |
5,005 |
|||||||||||||
Total |
29,512 |
34,305 |
29,755 |
30,543 |
29,462 |
29,462 |
29,512 |
||||||||||||||
Refer footnotes on page 5. |
|||||||||||||||||||||
BASE METALS (continued) |
|||||||||||||||||||||
GOLD |
|||||||||||||||||||||
Payable concentrate (ounces) |
|||||||||||||||||||||
Ok Tedi (d) |
52% |
140,748 |
127,049 |
115,576 |
124,729 |
- |
- |
140,748 |
|||||||||||||
Escondida |
57.5% |
15,443 |
13,270 |
10,582 |
10,302 |
10,641 |
10,641 |
15,443 |
|||||||||||||
Tintaya |
100% |
6,947 |
4,638 |
5,146 |
7,693 |
10,249 |
10,249 |
6,947 |
|||||||||||||
Alumbrera (e) |
25% |
- |
31,555 |
31,949 |
41,658 |
42,857 |
42,857 |
- |
|||||||||||||
Selbaie |
100% |
11,901 |
9,344 |
8,472 |
8,198 |
6,207 |
6,207 |
11,901 |
|||||||||||||
Total |
175,039 |
185,856 |
171,725 |
192,580 |
69,954 |
69,954 |
175,039 |
||||||||||||||
SILVER |
|||||||||||||||||||||
Payable metal ('000 ounces) |
|||||||||||||||||||||
Cannington |
100% |
7,629 |
7,591 |
6,462 |
7,806 |
7,804 |
7,804 |
7,629 |
|||||||||||||
Selbaie |
100% |
446 |
469 |
362 |
258 |
379 |
379 |
446 |
|||||||||||||
Total |
8,075 |
8,060 |
6,824 |
8,064 |
8,183 |
8,183 |
8,075 |
||||||||||||||
MOLYBDENUM |
|||||||||||||||||||||
Payable metal ('000 tonnes) |
|||||||||||||||||||||
Highland Valley (e) |
33.6% |
- |
0.1 |
0.1 |
0.1 |
0.1 |
0.1 |
- |
|||||||||||||
CARBON STEEL MATERIALS |
|||||||||||||||||||||
IRON ORE |
|||||||||||||||||||||
Production ('000 tonnes) |
|||||||||||||||||||||
Mt Newman Joint Venture |
85% |
5,620 |
5,500 |
4,591 |
5,239 |
5,973 |
5,973 |
5,620 |
|||||||||||||
Goldsworthy Joint Venture |
85% |
1,630 |
1,730 |
1,453 |
1,788 |
1,656 |
1,656 |
1,630 |
|||||||||||||
Yandi Joint Venture |
85% |
7,080 |
5,840 |
6,354 |
6,882 |
7,046 |
7,046 |
7,080 |
|||||||||||||
Jimblebar |
100% |
1,130 |
1,250 |
991 |
1,272 |
1,182 |
1,182 |
1,130 |
|||||||||||||
Samarco |
50% |
1,820 |
1,910 |
1,885 |
1,893 |
1,223 |
1,223 |
1,820 |
|||||||||||||
Total |
17,280 |
16,230 |
15,274 |
17,074 |
17,080 |
17,080 |
17,280 |
||||||||||||||
METALLURGICAL COAL (f) |
|||||||||||||||||||||
Production ('000 tonnes) |
|||||||||||||||||||||
CQCA Joint Venture (g) |
50% |
3,961 |
3,794 |
3,519 |
4,064 |
4,002 |
4,002 |
3,961 |
|||||||||||||
Gregory Joint Venture (g) |
50% |
851 |
970 |
845 |
960 |
486 |
486 |
851 |
|||||||||||||
BHP Mitsui Coal (h) |
80% |
1,414 |
1,525 |
1,678 |
1,802 |
1,823 |
1,823 |
1,414 |
|||||||||||||
QCT Resources (i) |
50% |
- |
1,260 |
1,837 |
2,087 |
- |
- |
- |
|||||||||||||
Illawarra |
100% |
1,738 |
1,328 |
1,619 |
1,889 |
2,055 |
2,055 |
1,738 |
|||||||||||||
Total |
7,964 |
8,877 |
9,498 |
10,802 |
8,365 |
8,365 |
7,964 |
||||||||||||||
MANGANESE ORES |
|||||||||||||||||||||
Saleable production ('000 tonnes) |
|||||||||||||||||||||
South Africa (j) |
60% |
555 |
579 |
538 |
490 |
467 |
467 |
555 |
|||||||||||||
Australia (j) |
60% |
469 |
318 |
379 |
446 |
505 |
505 |
469 |
|||||||||||||
Total |
1,024 |
897 |
917 |
936 |
973 |
973 |
1,024 |
||||||||||||||
MANGANESE ALLOYS |
|||||||||||||||||||||
Saleable production ('000 tonnes) |
|||||||||||||||||||||
South Africa (j) |
60% |
111 |
106 |
96 |
85 |
69 |
69 |
111 |
|||||||||||||
Australia (j) |
60% |
64 |
67 |
64 |
51 |
50 |
50 |
64 |
|||||||||||||
Total |
175 |
173 |
160 |
136 |
119 |
119 |
175 |
||||||||||||||
Refer footnotes on page 5. |
|||||||||||||||||||||
CARBON STEEL MATERIALS (cont'd) |
|||||||||||||||||||||
HOT BRIQUETTED IRON |
|||||||||||||||||||||
Production ('000 tonnes) |
|||||||||||||||||||||
Boodarie Iron™ |
100% |
105 |
291 |
177 |
276 |
386 |
386 |
105 |
|||||||||||||
STAINLESS STEEL MATERIALS |
|||||||||||||||||||||
NICKEL |
|||||||||||||||||||||
Production ('000 tonnes) |
|||||||||||||||||||||
CMSA |
99.8% |
6.4 |
6.9 |
9.4 |
9.1 |
9.6 |
9.6 |
6.4 |
|||||||||||||
Yabulu |
100% |
6.4 |
7.5 |
7.4 |
7.7 |
6.3 |
6.3 |
6.4 |
|||||||||||||
Total |
12.8 |
14.4 |
16.8 |
16.8 |
15.9 |
15.9 |
12.8 |
||||||||||||||
CHROME ORES |
|||||||||||||||||||||
Saleable production ('000 tonnes) |
|||||||||||||||||||||
South Africa (j) |
60% |
921 |
898 |
674 |
665 |
629 |
# |
629 |
921 |
||||||||||||
FERROCHROME |
|||||||||||||||||||||
Saleable production ('000 tonnes) |
|||||||||||||||||||||
South Africa (j) |
60% |
273 |
249 |
192 |
194 |
207 |
207 |
273 |
|||||||||||||
ENERGY COAL |
|||||||||||||||||||||
Production ('000 tonnes) |
|||||||||||||||||||||
South Africa |
100% |
14,561 |
17,811 |
14,379 |
14,571 |
14,538 |
14,538 |
14,561 |
|||||||||||||
USA |
100% |
3,080 |
3,962 |
3,993 |
3,890 |
3,106 |
3,106 |
3,080 |
|||||||||||||
Australia |
100% |
1,235 |
1,227 |
1,512 |
1,329 |
1,173 |
1,173 |
1,235 |
|||||||||||||
Indonesia (l) |
80% |
1,966 |
2,134 |
2,035 |
2,291 |
2,450 |
2,450 |
1,966 |
|||||||||||||
Colombia (m) |
16%-33% |
- |
687 |
1,091 |
1,053 |
1,138 |
1,138 |
- |
|||||||||||||
Total |
20,842 |
25,821 |
23,010 |
23,134 |
22,405 |
22,405 |
20,842 |
||||||||||||||
PETROLEUM |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Crude oil & condensate |
(000 bbl) |
20,817 |
20,000 |
19,911 |
18,378 |
19,492 |
19,492 |
20,817 |
|||||||||||||
Natural gas |
(bcf) |
61.75 |
60.83 |
67.61 |
71.64 |
71.24 |
71.24 |
61.75 |
|||||||||||||
LPG |
('000 tonnes) |
172.77 |
155.04 |
170.62 |
175.60 |
182.71 |
182.71 |
172.77 |
|||||||||||||
Ethane |
('000 tonnes) |
23.19 |
9.98 |
15.69 |
18.53 |
24.05 |
24.05 |
23.19 |
|||||||||||||
BHP STEEL |
|||||||||||||||||||||
Production ('000 tonnes) |
|||||||||||||||||||||
Raw steel |
100% |
1,455 |
1,372 |
1,277 |
1,328 |
1,382 |
1,382 |
1,455 |
|||||||||||||
Marketable steel products |
100% |
1,425 |
1,268 |
1,345 |
1,469 |
1,377 |
1,377 |
1,425 |
|||||||||||||
Refer footnotes on page 5. |
|||||||||||||||||||||
EXPLORATION, TECH & NEW BUSINESS |
|||||||||||||||||||||
DIAMONDS |
|||||||||||||||||||||
Production ('000 carats) |
|||||||||||||||||||||
Ekati™ (n) |
80% |
309 |
318 |
375 |
427 |
767 |
767 |
309 |
|||||||||||||
(a) Interest in Worsley increased from 30% to 86% effective January 2001. |
|||||||||||||||||||||
(b) Mozal produced its first metal in June 2000 and achieved full commissioning of its 253,000 tpa capacity in December 2000. |
|||||||||||||||||||||
(c) BHP Billiton Base Metals has adopted payable metal as its production reporting basis effective this quarterly report. Prior |
|||||||||||||||||||||
period mine production figures have been restated from the previous basis of metal contained in concentrate. |
|||||||||||||||||||||
(d) Shown on 100% basis. BHP Billiton holds a 52% equity interest in Ok Tedi. BHP Billiton announced in August 2001 that no |
|||||||||||||||||||||
profit would be recognised for Ok Tedi from 1 July 2001 onwards except to the extent that dividends are received. |
|||||||||||||||||||||
Accordingly, Ok Tedi September 2001 quarter production (100% basis) of 48,200 tonnes of copper and 104,855 ounces of gold |
|||||||||||||||||||||
has not been recognised in this quarterly report. |
|||||||||||||||||||||
(e) Included from 1 October 2000, the effective date of the acquisition of Rio Algom. |
|||||||||||||||||||||
(f) Coal production is reported on the basis of saleable product. Production figures include some thermal coal. |
|||||||||||||||||||||
(g) BHP Billiton interest is 50% from 28 June 2001 (previously CQCA joint venture 52.1% and Gregory joint venture 64.14%). |
|||||||||||||||||||||
(h) Shown on 100% basis before 20% outside equity interest. |
|||||||||||||||||||||
(i) Production reported represents BHP Billiton's 50% equity interest in MetCoal Holdings. MetCoal Holdings is equally owned by |
|||||||||||||||||||||
BHP Billiton and Mitsubishi Development Pty Ltd and acquired QCT Resources Limited in November 2000. In June 2001, |
|||||||||||||||||||||
Mitsubishi acquired the balance of the shares in QCT from BHP Billiton. |
|||||||||||||||||||||
(j) Shown on 100% basis. BHP Billiton interest in saleable production is 60%. |
|||||||||||||||||||||
(k) BHP Billiton ceased its investment in Orinoco in March 2001. |
|||||||||||||||||||||
(l) Production shown on 86.5% basis after allowing for Indonesian state owned corporation's 13.5% share of production. |
|||||||||||||||||||||
(m) Colombian thermal coal interests acquired in September and November 2000. |
|||||||||||||||||||||
(n) Interest in Ekati™ increased from 51% to 80% effective July 2001. |
|||||||||||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
ALUMINIUM |
|||||||||||||||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
|||||||||||||||||||||
('000 tonnes) |
|||||||||||||||||||||
ALUMINA |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Worsley, Australia (a) |
206 |
211 |
541 |
674 |
662 |
662 |
206 |
||||||||||||||
Paranam, Suriname |
213 |
215 |
213 |
211 |
219 |
219 |
213 |
||||||||||||||
Alumar, Brazil |
120 |
107 |
114 |
113 |
83 |
83 |
120 |
||||||||||||||
Total |
539 |
533 |
868 |
998 |
964 |
964 |
539 |
||||||||||||||
Sales |
|||||||||||||||||||||
Worsley, Australia (a) |
185 |
205 |
388 |
725 |
692 |
692 |
185 |
||||||||||||||
Paranam, Suriname |
214 |
194 |
224 |
186 |
224 |
224 |
214 |
||||||||||||||
Alumar, Brazil |
110 |
116 |
120 |
116 |
79 |
79 |
110 |
||||||||||||||
Total |
509 |
515 |
732 |
1,027 |
995 |
995 |
509 |
||||||||||||||
(a) Interest in Worsley increased from 30% to 86% effective January 2001. |
|||||||||||||||||||||
ALUMINIUM |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Hillside, South Africa |
126 |
127 |
122 |
123 |
125 |
125 |
126 |
||||||||||||||
Bayside, South Africa |
46 |
45 |
44 |
43 |
44 |
44 |
46 |
||||||||||||||
Alumar, Brazil |
43 |
44 |
42 |
43 |
35 |
35 |
43 |
||||||||||||||
Valesul, Brazil |
11 |
12 |
11 |
9 |
8 |
8 |
11 |
||||||||||||||
Mozal, Mozambique (b) |
7 |
23 |
31 |
32 |
32 |
32 |
7 |
||||||||||||||
Total |
233 |
251 |
250 |
250 |
244 |
244 |
233 |
||||||||||||||
Sales |
|||||||||||||||||||||
Hillside, South Africa |
126 |
127 |
121 |
124 |
123 |
123 |
126 |
||||||||||||||
Bayside, South Africa |
41 |
46 |
42 |
50 |
43 |
43 |
41 |
||||||||||||||
Alumar, Brazil |
42 |
43 |
41 |
45 |
34 |
34 |
42 |
||||||||||||||
Valesul, Brazil |
11 |
11 |
7 |
12 |
8 |
8 |
11 |
||||||||||||||
Mozal, Mozambique (b) |
5 |
20 |
32 |
33 |
32 |
32 |
5 |
||||||||||||||
Total |
225 |
247 |
243 |
264 |
240 |
240 |
225 |
||||||||||||||
(b) Mozal produced its first metal in June 2000 and achieved full commissioning of its 253,000 tpa capacity in December 2000. |
|||||||||||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
BASE METALS |
|||||||||||||||||||||
BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated. |
|||||||||||||||||||||
Escondida, Chile |
|||||||||||||||||||||
Material mined (100%) |
('000 tonnes) |
75,557 |
77,436 |
74,691 |
77,115 |
85,344 |
85,344 |
75,557 |
|||||||||||||
Sulphide ore milled (100%) |
('000 tonnes) |
12,358 |
11,534 |
11,128 |
10,650 |
11,205 |
11,205 |
12,358 |
|||||||||||||
Average copper grade |
(%) |
1.85% |
1.94% |
1.95% |
1.82% |
1.75% |
1.75% |
1.85% |
|||||||||||||
Production ex Mill (100%) |
('000 tonnes) |
199.5 |
190.4 |
176.4 |
159.5 |
162.0 |
162.0 |
199.5 |
|||||||||||||
Production |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
109.5 |
105.8 |
98.3 |
89.1 |
89.3 |
89.3 |
109.5 |
|||||||||||||
Payable gold concentrate |
(fine ounces) |
15,443 |
13,270 |
10,582 |
10,302 |
10,641 |
10,641 |
15,443 |
|||||||||||||
Copper cathode (SXEW) |
('000 tonnes) |
20.0 |
20.5 |
21.0 |
22.0 |
21.9 |
21.9 |
20.0 |
|||||||||||||
Sales |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
84.6 |
118.0 |
109.5 |
88.3 |
83.8 |
83.8 |
84.6 |
|||||||||||||
Payable gold concentrate |
(fine ounces) |
12,272 |
15,279 |
11,692 |
9,780 |
8,729 |
8,729 |
12,272 |
|||||||||||||
Copper cathode (SXEW) |
('000 tonnes) |
22.1 |
19.8 |
21.8 |
23.1 |
22.9 |
22.9 |
22.1 |
|||||||||||||
OK Tedi, Papua New Guinea (a) |
|||||||||||||||||||||
Material mined |
('000 tonnes) |
22,299 |
22,673 |
22,244 |
22,482 |
- |
- |
22,299 |
|||||||||||||
Ore milled |
('000 tonnes) |
7,371 |
8,286 |
8,250 |
8,116 |
- |
- |
7,371 |
|||||||||||||
Average head grades |
|||||||||||||||||||||
- Copper |
(%) |
0.93% |
0.91% |
0.85% |
0.92% |
- |
- |
0.93% |
|||||||||||||
- Gold |
(g/t) |
0.99 |
0.77 |
0.70 |
0.82 |
- |
- |
0.99 |
|||||||||||||
Production |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
49.8 |
54.1 |
51.7 |
53.4 |
- |
- |
49.8 |
|||||||||||||
Payable gold concentrate |
(fine ounces) |
140,748 |
127,049 |
115,576 |
124,729 |
- |
- |
140,748 |
|||||||||||||
Sales |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
36.2 |
53.5 |
53.4 |
67.5 |
- |
- |
36.2 |
|||||||||||||
Payable gold concentrate |
(fine ounces) |
100,481 |
135,494 |
113,760 |
156,860 |
- |
- |
100,481 |
|||||||||||||
(a) Ok Tedi data shown on 100% basis. BHP Billiton holds a 52% equity interest in Ok Tedi. BHP Billiton announced in August 2001 |
|||||||||||||||||||||
that no profit would be recognised for Ok Tedi from 1 July 2001 except to the extent that dividends are received. |
|||||||||||||||||||||
Accordingly, Ok Tedi September 2001 quarter production (100% basis) of 48,200 tonnes of copper and 104,855 ounces of gold |
|||||||||||||||||||||
has not been recognised in this quarterly report. |
|||||||||||||||||||||
Tintaya, Peru |
|||||||||||||||||||||
Material mined |
('000 tonnes) |
16,394 |
16,723 |
14,566 |
16,447 |
17,600 |
17,600 |
16,394 |
|||||||||||||
Ore milled |
('000 tonnes) |
1,620 |
1,744 |
1,429 |
1,508 |
1,640 |
1,640 |
1,620 |
|||||||||||||
Average copper grade |
(%) |
1.56% |
1.56% |
1.47% |
1.56% |
1.58% |
1.58% |
1.56% |
|||||||||||||
Production |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
22.5 |
24.0 |
18.4 |
20.1 |
20.9 |
20.9 |
22.5 |
|||||||||||||
Payable gold concentrate |
(fine ounces) |
6,947 |
4,638 |
5,146 |
7,693 |
10,249 |
10,249 |
6,947 |
|||||||||||||
Sales |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
17.6 |
24.5 |
12.1 |
32.0 |
19.2 |
19.2 |
17.6 |
|||||||||||||
Payable gold concentrate |
(fine ounces) |
7,794 |
5,149 |
3,125 |
10,350 |
9,745 |
9,745 |
7,794 |
|||||||||||||
Cerro Colorado, Chile (a) |
|||||||||||||||||||||
Material mined |
('000 tonnes) |
- |
14,957 |
13,342 |
14,177 |
13,595 |
13,595 |
- |
|||||||||||||
Ore milled |
('000 tonnes) |
- |
3,264 |
3,479 |
3,546 |
3,516 |
3,516 |
- |
|||||||||||||
Average copper grade |
(%) |
- |
1.08% |
1.09% |
1.09% |
1.06% |
1.06% |
- |
|||||||||||||
Production |
|||||||||||||||||||||
Copper cathode |
('000 tonnes) |
- |
31 |
32 |
34 |
34 |
34 |
- |
|||||||||||||
Sales |
|||||||||||||||||||||
Copper cathode |
('000 tonnes) |
- |
30 |
33 |
34 |
34 |
34 |
- |
|||||||||||||
(a) Cerro Colorado (BHP Billiton 100%) included from 1 October 2000, the effective date of the acquisition of Rio Algom. |
|||||||||||||||||||||
Alumbrera, Argentina (a) |
|||||||||||||||||||||
Material mined (100%) |
('000 tonnes) |
- |
27,823 |
25,829 |
27,182 |
29,545 |
29,545 |
- |
|||||||||||||
Ore milled (100%) |
('000 tonnes) |
- |
7,097 |
7,041 |
7,445 |
7,516 |
7,516 |
- |
|||||||||||||
Average head grades |
|||||||||||||||||||||
- Copper |
(%) |
- |
0.64% |
0.71% |
0.74% |
0.70% |
0.70% |
- |
|||||||||||||
- Gold |
(g/t) |
- |
0.8 |
0.8 |
1.0 |
1.0 |
1.0 |
- |
|||||||||||||
Production |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
- |
9.9 |
10.8 |
11.9 |
11.6 |
11.6 |
- |
|||||||||||||
Payable gold |
(fine ounces) |
- |
30,094 |
30,579 |
39,921 |
40,653 |
40,653 |
- |
|||||||||||||
Payable gold - dore |
(fine ounces) |
- |
1,461 |
1,370 |
1,737 |
2,204 |
2,204 |
- |
|||||||||||||
Sales |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
- |
8.4 |
9.5 |
14.2 |
10.0 |
10.0 |
- |
|||||||||||||
Payable gold |
(fine ounces) |
- |
26,819 |
27,635 |
45,999 |
34,461 |
34,461 |
- |
|||||||||||||
Payable gold - dore |
(fine ounces) |
- |
1,907 |
1,933 |
2,137 |
2,009 |
2,009 |
- |
|||||||||||||
(a) Alumbrera (BHP Billiton 25%) included from 1 October 2000, the effective date of the acquisition of Rio Algom. |
|||||||||||||||||||||
Highland Valley, Canada (a) |
|||||||||||||||||||||
Material mined (100%) |
('000 tonnes) |
- |
21,203 |
19,104 |
18,988 |
19,910 |
19,910 |
- |
|||||||||||||
Ore milled (100%) |
('000 tonnes) |
- |
13,155 |
11,784 |
11,355 |
12,841 |
12,841 |
- |
|||||||||||||
Average copper grade |
(%) |
- |
0.42% |
0.43% |
0.43% |
0.43% |
0.43% |
- |
|||||||||||||
Production |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
- |
16.0 |
14.8 |
14.1 |
16.1 |
16.1 |
- |
|||||||||||||
Payable Molybdenum |
('000 tonnes) |
- |
0.14 |
0.12 |
0.12 |
0.10 |
0.10 |
- |
|||||||||||||
Sales |
|||||||||||||||||||||
Payable copper |
('000 tonnes) |
- |
10.5 |
10.5 |
11.9 |
17.0 |
17.0 |
- |
|||||||||||||
Payable Molybdenum |
('000 tonnes) |
- |
0.21 |
0.17 |
0.14 |
0.09 |
0.09 |
- |
|||||||||||||
(a) Highland Valley (BHP Billiton 33.6%) included from 1 October 2000, the effective date of the acquisition of Rio Algom. |
|||||||||||||||||||||
Cannington, Australia |
|||||||||||||||||||||
Material mined |
('000 tonnes) |
430 |
460 |
464 |
507 |
543 |
543 |
430 |
|||||||||||||
Ore milled |
('000 tonnes) |
408 |
461 |
422 |
490 |
496 |
496 |
408 |
|||||||||||||
Average head grades |
|||||||||||||||||||||
- Silver |
(g/t) |
653 |
615 |
539 |
577 |
606 |
606 |
653 |
|||||||||||||
- Lead |
(%) |
14.5% |
14.0% |
13.0% |
13.2% |
13.0% |
13.0% |
14.5% |
|||||||||||||
- Zinc |
(%) |
5.1% |
6.0% |
6.0% |
5.5% |
4.5% |
4.5% |
5.1% |
|||||||||||||
Production |
|||||||||||||||||||||
Payable silver |
('000 ounces) |
7,629 |
7,591 |
6,462 |
7,806 |
7,804 |
7,804 |
7,629 |
|||||||||||||
Payable lead |
(tonnes) |
51,328 |
49,503 |
45,228 |
54,271 |
52,879 |
52,879 |
51,328 |
|||||||||||||
Payable zinc |
(tonnes) |
13,148 |
17,994 |
15,877 |
17,176 |
14,058 |
14,058 |
13,148 |
|||||||||||||
Sales |
|||||||||||||||||||||
Payable silver |
('000 ounces) |
6,988 |
6,583 |
8,107 |
8,681 |
7,231 |
7,231 |
6,988 |
|||||||||||||
Payable lead |
(tonnes) |
46,079 |
43,036 |
55,949 |
61,243 |
49,423 |
49,423 |
46,079 |
|||||||||||||
Payable zinc |
(tonnes) |
11,681 |
13,262 |
20,588 |
17,496 |
13,220 |
13,220 |
11,681 |
|||||||||||||
Selbaie, Canada |
|||||||||||||||||||||
Ore milled |
('000 tonnes) |
327 |
1,884 |
902 |
896 |
534 |
534 |
327 |
|||||||||||||
Average head grades |
|||||||||||||||||||||
- Zinc |
(%) |
1.61% |
1.55% |
1.58% |
1.42% |
1.51% |
1.51% |
1.61% |
|||||||||||||
- Copper |
(%) |
0.45% |
0.43% |
0.46% |
0.42% |
0.34% |
0.34% |
0.45% |
|||||||||||||
- Gold |
(g/t) |
0.51 |
0.49 |
0.46 |
0.45 |
0.34 |
0.34 |
0.51 |
|||||||||||||
- Silver |
(g/t) |
22.66 |
29.03 |
25.00 |
18.14 |
25.00 |
25.00 |
22.66 |
|||||||||||||
Production |
|||||||||||||||||||||
Payable zinc |
(tonnes) |
11,359 |
10,812 |
8,868 |
7,969 |
9,456 |
9,456 |
11,359 |
|||||||||||||
Payable copper |
(tonnes) |
3,390 |
3,183 |
3,286 |
2,841 |
2,470 |
2,470 |
3,390 |
|||||||||||||
Payable gold concentrate |
(ounces) |
11,901 |
9,344 |
8,472 |
8,198 |
6,207 |
6,207 |
11,901 |
|||||||||||||
Payable silver |
('000 ounces) |
446 |
469 |
362 |
258 |
379 |
379 |
446 |
|||||||||||||
Sales |
|||||||||||||||||||||
Payable zinc |
(tonnes) |
9,383 |
9,786 |
9,109 |
8,406 |
9,959 |
9,959 |
9,383 |
|||||||||||||
Payable copper |
(tonnes) |
2,983 |
3,385 |
3,258 |
3,039 |
3,197 |
3,197 |
2,983 |
|||||||||||||
Payable gold concentrate |
(ounces) |
6,283 |
11,776 |
10,178 |
8,207 |
8,112 |
8,112 |
6,283 |
|||||||||||||
Payable silver |
('000 ounces) |
535 |
494 |
445 |
405 |
283 |
283 |
535 |
|||||||||||||
Pering, South Africa |
|||||||||||||||||||||
Ore milled |
('000 tonnes) |
336 |
336 |
327 |
345 |
339 |
339 |
336 |
|||||||||||||
Average head grades |
|||||||||||||||||||||
- Zinc |
(%) |
2.03% |
2.22% |
2.03% |
2.09% |
2.02% |
2.02% |
2.03% |
|||||||||||||
- Lead |
(%) |
0.68% |
0.68% |
0.55% |
0.60% |
0.49% |
0.49% |
0.68% |
|||||||||||||
Production |
|||||||||||||||||||||
Payable zinc |
(tonnes) |
5,005 |
5,499 |
5,010 |
5,398 |
5,948 |
5,948 |
5,005 |
|||||||||||||
Payable lead |
(tonnes) |
1,616 |
1,601 |
1,321 |
1,486 |
1,195 |
1,195 |
1,616 |
|||||||||||||
Sales |
|||||||||||||||||||||
Payable zinc |
(tonnes) |
4,927 |
4,988 |
5,171 |
5,063 |
4,932 |
4,932 |
4,927 |
|||||||||||||
Payable lead |
(tonnes) |
1,702 |
1,246 |
1,587 |
1,493 |
1,366 |
1,366 |
1,702 |
|||||||||||||
San Manuel, USA |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Copper cathode (SXEW) |
('000 tonnes) |
2.8 |
2.7 |
2.5 |
2.3 |
2.3 |
2.3 |
2.8 |
|||||||||||||
Pinto Valley, USA |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Copper cathode (SXEW) |
('000 tonnes) |
4.3 |
4.4 |
4.0 |
3.8 |
3.4 |
3.4 |
4.3 |
|||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
CARBON STEEL MATERIALS |
|||||||||||||||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
|||||||||||||||||||||
('000 tonnes) |
|||||||||||||||||||||
IRON ORE (a) |
|||||||||||||||||||||
Pilbara, Western Australia |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Mt Newman Joint Venture |
5,620 |
5,500 |
4,591 |
5,239 |
5,973 |
5,973 |
5,620 |
||||||||||||||
Goldsworthy Joint Venture |
1,630 |
1,730 |
1,453 |
1,788 |
1,656 |
1,656 |
1,630 |
||||||||||||||
Yandi Joint Venture |
7,080 |
5,840 |
6,354 |
6,882 |
7,046 |
7,046 |
7,080 |
||||||||||||||
Jimblebar |
1,130 |
1,250 |
991 |
1,272 |
1,182 |
1,182 |
1,130 |
||||||||||||||
Total |
15,460 |
14,320 |
13,389 |
15,181 |
15,858 |
15,858 |
15,460 |
||||||||||||||
Shipments |
|||||||||||||||||||||
Lump |
3,940 |
3,730 |
3,950 |
3,823 |
3,729 |
3,729 |
3,940 |
||||||||||||||
Fines |
11,040 |
11,400 |
11,171 |
11,545 |
12,334 |
12,334 |
11,040 |
||||||||||||||
Total |
14,980 |
15,130 |
15,121 |
15,368 |
16,063 |
16,063 |
14,980 |
||||||||||||||
(a) Iron ore production and shipments are reported on a wet tonnes basis. |
|||||||||||||||||||||
Samarco, Brazil |
|||||||||||||||||||||
Production |
1,820 |
1,910 |
1,885 |
1,893 |
1,223 |
1,223 |
1,820 |
||||||||||||||
Shipments |
1,670 |
2,150 |
1,699 |
1,460 |
1,156 |
1,156 |
1,670 |
||||||||||||||
METALLURGICAL COAL (a) |
|||||||||||||||||||||
Queensland, Australia |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
CQCA Joint Venture (b) |
|||||||||||||||||||||
Blackwater |
1,056 |
1,076 |
1,066 |
1,130 |
977 |
977 |
1,056 |
||||||||||||||
Goonyella |
924 |
965 |
967 |
1,122 |
986 |
986 |
924 |
||||||||||||||
Peak Downs |
893 |
886 |
571 |
779 |
885 |
885 |
893 |
||||||||||||||
Saraji |
608 |
433 |
504 |
530 |
627 |
627 |
608 |
||||||||||||||
Norwich Park |
480 |
434 |
411 |
503 |
527 |
527 |
480 |
||||||||||||||
CQCA total |
3,961 |
3,794 |
3,519 |
4,064 |
4,002 |
4,002 |
3,961 |
||||||||||||||
Gregory Joint Venture (b) |
851 |
970 |
845 |
960 |
486 |
486 |
851 |
||||||||||||||
BHP Mitsui Coal (c) |
|||||||||||||||||||||
Riverside |
745 |
727 |
834 |
966 |
917 |
917 |
745 |
||||||||||||||
South Walker Creek |
669 |
798 |
844 |
836 |
906 |
906 |
669 |
||||||||||||||
BHP Mitsui Coal total |
1,414 |
1,525 |
1,678 |
1,802 |
1,823 |
1,823 |
1,414 |
||||||||||||||
Queensland total |
6,226 |
6,289 |
6,042 |
6,826 |
6,311 |
6,311 |
6,226 |
||||||||||||||
Shipments |
|||||||||||||||||||||
Coking coal |
4,554 |
4,669 |
4,401 |
4,813 |
4,462 |
4,462 |
4,554 |
||||||||||||||
Weak coking coal |
1,065 |
1,466 |
1,138 |
1,245 |
1,319 |
1,319 |
1,065 |
||||||||||||||
Thermal coal |
633 |
657 |
474 |
624 |
544 |
544 |
633 |
||||||||||||||
Total |
6,252 |
6,792 |
6,013 |
6,682 |
6,325 |
6,325 |
6,252 |
||||||||||||||
(a) Coal production is reported on the basis of saleable product. Production figures include some thermal coal. |
|||||||||||||||||||||
(b) BHP Billiton interest is 50% from 28 June 2001 (previously CQCA joint venture 52.1% and Gregory joint venture 64.14%). |
|||||||||||||||||||||
(c) BHP Mitsui Coal production shown on 100% basis before 20% outside equity interest. |
|||||||||||||||||||||
QCT Resources, Australia (a) |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
CQCA |
- |
732 |
1,093 |
1,263 |
- |
- |
- |
||||||||||||||
Gregory Joint Venture |
- |
173 |
213 |
242 |
- |
- |
- |
||||||||||||||
South Blackwater |
- |
355 |
531 |
582 |
- |
- |
- |
||||||||||||||
Total |
- |
1,260 |
1,837 |
2,087 |
- |
- |
- |
||||||||||||||
Shipments |
|||||||||||||||||||||
Coking coal |
- |
876 |
1,633 |
1,476 |
- |
- |
- |
||||||||||||||
Weak coking coal |
- |
146 |
227 |
231 |
- |
- |
- |
||||||||||||||
Thermal coal |
- |
245 |
209 |
268 |
- |
- |
- |
||||||||||||||
Total |
- |
1,267 |
2,069 |
1,975 |
- |
- |
- |
||||||||||||||
(a) Production and shipments reported represents BHP Billiton's 50% equity interest in MetCoal Holdings. MetCoal Holdings is |
|||||||||||||||||||||
equally owned by BHP Billiton and Mitsubishi Development Pty Ltd and acquired QCT Resources Limited in November 2000. |
|||||||||||||||||||||
In June 2001, Mitsubishi acquired the balance of the shares in QCT from BHP Billiton. |
|||||||||||||||||||||
Illawarra, Australia |
|||||||||||||||||||||
Production |
1,738 |
1,328 |
1,619 |
1,889 |
2,055 |
2,055 |
1,738 |
||||||||||||||
Shipments |
|||||||||||||||||||||
Coking coal |
1,326 |
1,512 |
1,410 |
1,686 |
1,457 |
1,457 |
1,326 |
||||||||||||||
Thermal coal |
128 |
165 |
67 |
246 |
136 |
136 |
128 |
||||||||||||||
Total |
1,454 |
1,677 |
1,477 |
1,932 |
1,593 |
1,593 |
1,454 |
||||||||||||||
MANGANESE ORES |
|||||||||||||||||||||
South Africa |
|||||||||||||||||||||
Saleable production (a) |
555 |
579 |
538 |
490 |
467 |
467 |
555 |
||||||||||||||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
|||||||||||||||||||||
Australia |
|||||||||||||||||||||
Saleable production (a) |
469 |
318 |
379 |
446 |
505 |
505 |
469 |
||||||||||||||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
|||||||||||||||||||||
MANGANESE ALLOYS |
|||||||||||||||||||||
South Africa |
|||||||||||||||||||||
Saleable production (a) |
111 |
106 |
96 |
85 |
69 |
69 |
111 |
||||||||||||||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
|||||||||||||||||||||
Australia |
|||||||||||||||||||||
Saleable production (a) |
64 |
67 |
64 |
51 |
50 |
50 |
64 |
||||||||||||||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
|||||||||||||||||||||
HOT BRIQUETTED IRON |
|||||||||||||||||||||
Boodarie Iron™, Australia |
|||||||||||||||||||||
Production |
105 |
291 |
177 |
276 |
386 |
386 |
105 |
||||||||||||||
Shipments |
54 |
107 |
238 |
342 |
358 |
358 |
54 |
||||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
STAINLESS STEEL MATERIALS |
|||||||||||||||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
|||||||||||||||||||||
('000 tonnes) |
|||||||||||||||||||||
NICKEL |
|||||||||||||||||||||
CMSA, Colombia |
|||||||||||||||||||||
Production |
6.4 |
6.9 |
9.4 |
9.1 |
9.6 |
9.6 |
6.4 |
||||||||||||||
Sales |
6.4 |
5.5 |
8.8 |
10.2 |
9.1 |
9.1 |
6.4 |
||||||||||||||
Yabulu, Australia |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Nickel |
6.4 |
7.5 |
7.4 |
7.7 |
6.3 |
6.3 |
6.4 |
||||||||||||||
Cobalt |
0.4 |
0.4 |
0.5 |
0.5 |
0.4 |
0.4 |
0.4 |
||||||||||||||
Sales |
|||||||||||||||||||||
Nickel |
6.3 |
6.3 |
6.5 |
8.2 |
7.7 |
7.7 |
6.3 |
||||||||||||||
Cobalt |
0.4 |
0.4 |
0.4 |
0.4 |
0.4 |
0.4 |
0.4 |
||||||||||||||
CHROME ORES |
|||||||||||||||||||||
South Africa |
|||||||||||||||||||||
Saleable production (a) |
921 |
898 |
674 |
665 |
629 |
629 |
921 |
||||||||||||||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
|||||||||||||||||||||
FERROCHROME |
|||||||||||||||||||||
South Africa |
|||||||||||||||||||||
Saleable production (a) |
273 |
249 |
192 |
194 |
207 |
207 |
273 |
||||||||||||||
(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%. |
|||||||||||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
ENERGY COAL |
|||||||||||||||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
|||||||||||||||||||||
('000 tonnes) |
|||||||||||||||||||||
Ingwe, South Africa |
|||||||||||||||||||||
Production |
14,561 |
17,811 |
14,379 |
14,571 |
14,538 |
14,538 |
14,561 |
||||||||||||||
Sales |
|||||||||||||||||||||
Export |
6,569 |
6,489 |
6,164 |
6,557 |
6,289 |
6,289 |
6,569 |
||||||||||||||
Local utility |
7,098 |
10,273 |
6,957 |
6,821 |
7,477 |
7,477 |
7,098 |
||||||||||||||
Inland |
1,217 |
1,473 |
1,207 |
1,110 |
1,092 |
1,092 |
1,217 |
||||||||||||||
Total |
14,884 |
18,235 |
14,328 |
14,488 |
14,858 |
14,858 |
14,884 |
||||||||||||||
New Mexico, USA |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Navajo Coal |
1,544 |
2,119 |
1,838 |
2,170 |
1,694 |
1,694 |
1,544 |
||||||||||||||
San Juan Coal |
1,536 |
1,843 |
2,155 |
1,720 |
1,412 |
1,412 |
1,536 |
||||||||||||||
Total |
3,080 |
3,962 |
3,993 |
3,890 |
3,106 |
3,106 |
3,080 |
||||||||||||||
Sales - local utility |
3,785 |
3,565 |
3,566 |
3,434 |
3,407 |
3,407 |
3,785 |
||||||||||||||
COAL, Australia |
|||||||||||||||||||||
Production |
1,235 |
1,227 |
1,512 |
1,329 |
1,173 |
1,173 |
1,235 |
||||||||||||||
Sales |
|||||||||||||||||||||
Export |
949 |
685 |
1,190 |
1,201 |
604 |
604 |
949 |
||||||||||||||
Inland |
392 |
235 |
396 |
399 |
398 |
398 |
392 |
||||||||||||||
Total |
1,341 |
920 |
1,586 |
1,600 |
1,002 |
1,002 |
1,341 |
||||||||||||||
Kalimantan, Indonesia (a) |
|||||||||||||||||||||
Production |
|||||||||||||||||||||
Senakin |
905 |
1,050 |
924 |
1,099 |
1,161 |
1,161 |
905 |
||||||||||||||
Satui |
818 |
871 |
926 |
981 |
1,068 |
1,068 |
818 |
||||||||||||||
Petangis |
243 |
213 |
185 |
211 |
221 |
221 |
243 |
||||||||||||||
Total |
1,966 |
2,134 |
2,035 |
2,291 |
2,450 |
2,450 |
1,966 |
||||||||||||||
Sales - export |
2,075 |
2,049 |
1,942 |
2,308 |
2,312 |
2,312 |
2,075 |
||||||||||||||
(a) Reported on 86.5% basis after allowing for the Indonesian state-owned corporation's 13.5% share of all production. |
|||||||||||||||||||||
CDC & CZN, Colombia (a) |
|||||||||||||||||||||
Production |
- |
687 |
1,091 |
1,053 |
1,138 |
1,138 |
- |
||||||||||||||
Sales - export |
- |
676 |
1,102 |
959 |
1,098 |
1,098 |
- |
||||||||||||||
(a) BHP Billiton acquired a one third interest in CDC in September 2000. A consortium owned equally by BHP Billiton, Anglo |
|||||||||||||||||||||
American and Glencore International acquired a 50% interest in CZN in November 2000. |
|||||||||||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
PETROLEUM |
|||||||||||||||||||||
BHP Billiton attributable production unless otherwise stated. |
|||||||||||||||||||||
CRUDE OIL & CONDENSATE ('000 barrels) |
|||||||||||||||||||||
Bass Strait |
7,804 |
7,096 |
6,990 |
6,946 |
7,387 |
7,387 |
7,804 |
||||||||||||||
North West Shelf - condensate |
1,225 |
1,144 |
1,240 |
1,239 |
1,331 |
1,331 |
1,225 |
||||||||||||||
North West Shelf - Wanaea/Cossack |
1,682 |
1,885 |
1,820 |
1,757 |
1,652 |
1,652 |
1,682 |
||||||||||||||
Laminaria |
4,369 |
3,875 |
3,533 |
3,076 |
3,001 |
3,001 |
4,369 |
||||||||||||||
Buffalo (a) |
757 |
763 |
- |
- |
- |
- |
757 |
||||||||||||||
Griffin |
1,991 |
1,714 |
2,241 |
1,194 |
1,037 |
1,037 |
1,991 |
||||||||||||||
Pakistan (b) |
- |
- |
3 |
14 |
17 |
17 |
- |
||||||||||||||
Typhoon (c) |
- |
- |
- |
- |
835 |
835 |
- |
||||||||||||||
Americas |
826 |
944 |
941 |
958 |
918 |
918 |
826 |
||||||||||||||
Liverpool Bay |
1,716 |
1,978 |
2,469 |
2,516 |
2,830 |
2,830 |
1,716 |
||||||||||||||
Bruce/Keith (d) |
447 |
601 |
674 |
678 |
483 |
483 |
447 |
||||||||||||||
Total |
20,817 |
20,000 |
19,911 |
18,378 |
19,492 |
19,492 |
20,817 |
||||||||||||||
NATURAL GAS (billion cubic feet) |
|||||||||||||||||||||
Bass Strait |
27.78 |
18.96 |
22.91 |
26.75 |
30.05 |
30.05 |
27.78 |
||||||||||||||
North West Shelf - Domestic |
3.13 |
3.28 |
3.29 |
3.81 |
3.68 |
3.68 |
3.13 |
||||||||||||||
North West Shelf - LNG |
15.19 |
13.83 |
14.24 |
13.47 |
15.76 |
15.76 |
15.19 |
||||||||||||||
Griffin |
0.75 |
0.82 |
0.73 |
0.84 |
1.35 |
1.35 |
0.75 |
||||||||||||||
Pakistan (b) |
- |
- |
0.40 |
2.03 |
2.66 |
2.66 |
- |
||||||||||||||
Typhoon (c) |
- |
- |
- |
- |
0.67 |
0.67 |
- |
||||||||||||||
Americas |
5.21 |
5.38 |
5.19 |
5.52 |
5.41 |
5.41 |
5.21 |
||||||||||||||
Bruce |
5.01 |
9.38 |
10.43 |
7.59 |
3.28 |
3.28 |
5.01 |
||||||||||||||
Keith (d) |
- |
0.11 |
0.24 |
0.25 |
0.19 |
0.19 |
- |
||||||||||||||
Liverpool Bay |
4.68 |
9.07 |
10.18 |
11.38 |
8.19 |
8.19 |
4.68 |
||||||||||||||
Total |
61.75 |
60.83 |
67.61 |
71.64 |
71.24 |
71.24 |
61.75 |
||||||||||||||
LPG ('000 tonnes) |
|||||||||||||||||||||
Bass Strait |
128.15 |
95.70 |
113.21 |
117.66 |
128.52 |
128.52 |
128.15 |
||||||||||||||
North West Shelf |
31.48 |
30.69 |
30.44 |
31.65 |
36.32 |
36.32 |
31.48 |
||||||||||||||
Griffin |
1.57 |
1.50 |
0.51 |
- |
- |
- |
1.57 |
||||||||||||||
Bruce |
11.57 |
26.72 |
23.01 |
24.85 |
16.51 |
16.51 |
11.57 |
||||||||||||||
Keith (d) |
- |
0.43 |
3.45 |
1.44 |
1.36 |
1.36 |
- |
||||||||||||||
Total |
172.77 |
155.04 |
170.62 |
175.60 |
182.71 |
182.71 |
172.77 |
||||||||||||||
ETHANE ('000 tonnes) |
23.19 |
9.98 |
15.69 |
18.53 |
24.05 |
24.05 |
23.19 |
||||||||||||||
(a) Buffalo sold effective September 2000. |
|||||||||||||||||||||
(b) Zamzama extended well test commenced in March 2001. |
|||||||||||||||||||||
(c) Typhoon commenced production in July 2001. |
|||||||||||||||||||||
(d) Keith commenced production in November 2000. |
|||||||||||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
BHP STEEL |
|||||||||||||||||||||
BHP Billiton attributable production unless otherwise stated. |
|||||||||||||||||||||
('000 tonnes) |
|||||||||||||||||||||
PRODUCTION |
|||||||||||||||||||||
Iron Sands |
|||||||||||||||||||||
NZS, New Zealand |
723 |
712 |
274 |
478 |
397 |
397 |
723 |
||||||||||||||
Coke |
|||||||||||||||||||||
Port Kembla, Australia |
616 |
599 |
578 |
643 |
661 |
661 |
616 |
||||||||||||||
Iron |
|||||||||||||||||||||
Port Kembla, Australia |
1,298 |
1,231 |
1,177 |
1,269 |
1,262 |
1,262 |
1,298 |
||||||||||||||
Raw Steel |
|||||||||||||||||||||
Port Kembla, Australia |
1,308 |
1,226 |
1,120 |
1,176 |
1,238 |
1,238 |
1,308 |
||||||||||||||
NZS, New Zealand |
147 |
146 |
157 |
152 |
144 |
144 |
147 |
||||||||||||||
Total |
1,455 |
1,372 |
1,277 |
1,328 |
1,382 |
1,382 |
1,455 |
||||||||||||||
Delta, Ohio (a) |
193 |
186 |
190 |
197 |
196 |
196 |
193 |
||||||||||||||
Marketable Steel Products |
|||||||||||||||||||||
Flat Products |
|||||||||||||||||||||
Flat and Tinplate products |
1,242 |
1,152 |
1,094 |
1,183 |
1,183 |
1,183 |
1,242 |
||||||||||||||
Coated Products |
|||||||||||||||||||||
Rolled and coated products |
531 |
464 |
462 |
474 |
533 |
533 |
531 |
||||||||||||||
Flat and coated products (NZS) |
137 |
125 |
139 |
135 |
137 |
137 |
137 |
||||||||||||||
Rolled and coated products (offshore) |
70 |
98 |
81 |
89 |
69 |
69 |
70 |
||||||||||||||
Building products (includes offshore) |
40 |
34 |
42 |
42 |
40 |
40 |
40 |
||||||||||||||
Total (b) |
1,425 |
1,268 |
1,345 |
1,469 |
1,377 |
1,377 |
1,425 |
||||||||||||||
Delta, Ohio (a) |
189 |
182 |
186 |
193 |
192 |
192 |
189 |
||||||||||||||
DESPATCHES (c) |
|||||||||||||||||||||
Business unit despatches |
|||||||||||||||||||||
Flat Products |
1,243 |
1,069 |
1,098 |
1,294 |
1,128 |
1,128 |
1,243 |
||||||||||||||
Coated Products |
732 |
691 |
666 |
813 |
746 |
746 |
732 |
||||||||||||||
Total (d) |
1,236 |
1,237 |
1,282 |
1,587 |
1,296 |
1,296 |
1,236 |
||||||||||||||
External despatches |
|||||||||||||||||||||
Australia |
Domestic (e) |
485 |
503 |
515 |
585 |
691 |
691 |
485 |
|||||||||||||
Export |
541 |
515 |
546 |
757 |
387 |
387 |
541 |
||||||||||||||
New Zealand |
Domestic (e) |
67 |
62 |
56 |
55 |
61 |
61 |
67 |
|||||||||||||
Export |
68 |
55 |
77 |
97 |
83 |
83 |
68 |
||||||||||||||
Other offshore |
75 |
102 |
88 |
93 |
74 |
74 |
75 |
||||||||||||||
Total |
1,236 |
1,237 |
1,282 |
1,587 |
1,296 |
1,296 |
1,236 |
||||||||||||||
Delta, Ohio (a) |
190 |
177 |
190 |
191 |
191 |
191 |
190 |
||||||||||||||
(a) Production and despatches reported is that proportion determined by BHP Steel's equity interest in North Star BHP LLC (50%). |
|||||||||||||||||||||
(b) Total excludes production for intra-business sales. Therefore, the total figure is less than the sum of the individual businesses. |
|||||||||||||||||||||
(c) Steel products only. Excludes pig iron and by-products. |
|||||||||||||||||||||
(d) Total excludes intra-business sales. Therefore, the total figure is less than the sum of the individual businesses. |
|||||||||||||||||||||
(e) Includes despatches to OneSteel Limited from 1 November 2000. |
|||||||||||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
EXPLORATION, TECHNOLOGY & NEW BUSINESS |
|||||||||||||||||||||
BHP Billiton attributable production and sales unless otherwise stated. |
|||||||||||||||||||||
DIAMONDS |
|||||||||||||||||||||
Ekati™, Canada |
|||||||||||||||||||||
Production (a) |
('000 carats) |
309 |
318 |
375 |
427 |
767 |
767 |
309 |
|||||||||||||
(a) Interest in Ekati™ increased from 51% to 80% effective July 2001. |
|||||||||||||||||||||
PRODUCTION AND SHIPMENT REPORT |
|||||||||||||||||||||
QUARTER ENDED |
QUARTER ENDED |
||||||||||||||||||||
SEPT |
DEC |
MARCH |
JUNE |
SEPT |
SEPT |
SEPT |
|||||||||||||||
2000 |
2000 |
2001 |
2001 |
2001 |
2001 |
2000 |
|||||||||||||||
STEEL - DISCONTINUED OPERATIONS (a) |
|||||||||||||||||||||
BHP Billiton attributable production unless otherwise stated. |
|||||||||||||||||||||
('000 tonnes) |
|||||||||||||||||||||
PRODUCTION |
|||||||||||||||||||||
Iron Ore |
|||||||||||||||||||||
Whyalla, Australia |
656 |
254 |
- |
- |
- |
- |
656 |
||||||||||||||
Coke |
|||||||||||||||||||||
Whyalla, Australia |
149 |
49 |
- |
- |
- |
- |
149 |
||||||||||||||
Iron |
|||||||||||||||||||||
Whyalla, Australia |
270 |
102 |
- |
- |
- |
- |
270 |
||||||||||||||
Raw Steel |
|||||||||||||||||||||
Whyalla, Australia |
245 |
99 |
- |
- |
- |
- |
245 |
||||||||||||||
Newcastle, Australia |
- |
- |
- |
- |
- |
- |
- |
||||||||||||||
Sydney, Australia |
128 |
36 |
- |
- |
- |
- |
128 |
||||||||||||||
Total |
373 |
135 |
- |
- |
- |
- |
373 |
||||||||||||||
Marketable Steel Products |
|||||||||||||||||||||
Long products |
551 |
171 |
- |
- |
- |
- |
551 |
||||||||||||||
Other offshore (USA) (b) |
- |
- |
- |
- |
- |
- |
- |
||||||||||||||
Total (b) |
540 |
171 |
- |
- |
- |
- |
540 |
||||||||||||||
DESPATCHES (c) |
|||||||||||||||||||||
Business unit despatches |
|||||||||||||||||||||
Long Products |
527 |
166 |
- |
- |
- |
- |
527 |
||||||||||||||
Other offshore (USA) (b) |
- |
- |
- |
- |
- |
- |
- |
||||||||||||||
Total (d) |
527 |
166 |
- |
- |
- |
- |
527 |
||||||||||||||
External despatches |
|||||||||||||||||||||
Australia |
Domestic |
482 |
150 |
- |
- |
- |
- |
482 |
|||||||||||||
Export |
45 |
16 |
- |
- |
- |
- |
45 |
||||||||||||||
Other offshore (USA) (b) |
- |
- |
- |
- |
- |
- |
- |
||||||||||||||
Total |
769 |
166 |
- |
- |
- |
- |
769 |
||||||||||||||
(a) Data tables reflect the spin-out of OneSteel Limited from BHP Billiton effective 31 October 2000. |
|||||||||||||||||||||
(b) US steel businesses were sold in June 2000. |
|||||||||||||||||||||
(c) Steel products only. Excludes pig iron and by-products. |
|||||||||||||||||||||
(d) Total excludes intra-business sales. Therefore, the total figure is less than the sum of the individual businesses. |
|||||||||||||||||||||