Date: 26 October 2001

Ref: 24/01

 

BHP Billiton Production Report for the Quarter

Ended 30 September 2001

 

BHP Billiton today released its production report for the quarter ended 30 September, 2001. Production of most major commodities was in line with both the corresponding period last year and the June 2001 quarter.

***

Further news and information can be found on our Internet site: www.bhpbilliton.com

Australia
Dr Robert Porter, Investor Relations
Tel:+61 3 9609 3540
Mobile: +61 419 587 456
Email: Robert.Porter@bhpbilliton.com
 
Mandy Frostick, Media Relations
Tel:+61 3 9609 4157
Mobile: +61 419 546 245
Email: Mandy.J.Frostick@bhpbilliton.com

United States
Francis McAllister, Investor Relations
Tel: +1 713 961 8625
Mobile: +1 713 480 3699
Email: Francis.R.McAllister@bhpbilliton.com
 
United Kingdom
Marc Gonsalves, Investor Relations & Communications
Tel:+44 20 7747 3956
Mobile: +44 7768 264 950
Email: Marc.Gonsalves@bhpbilliton.com
 
Ariane Gentil, Manager Communications
Tel:+44 20 7747 3977
Mobile: +44 7881 518 715
Email: Ariane.Gentil@bhpbilliton.com
 
South Africa
Michael Campbell, Investor & Media Relations
Tel:+27 11 376 3360
Mobile: +27 82 458 2587
Email: Michael.J.Campbell@bhpbilliton.com
 

 

 

BHP Billiton Limited ABN 49 004 028 077
Registered in Australia
Registered Office: 600 Bourke Street Melbourne Victoria 3000
Telephone +61 3 9609 3333 Facsimile +61 3 9609 3015

BHP Billiton Plc Registration number 3196209
Registered in England and Wales
Registered Office: 1-3 Strand London WC2N 5HA United Kingdom
Telephone +44 20 7747 3800 Facsimile +44 20 7747 3900

The BHP Billiton Group is headquartered in Australia

 

 

BHP BILLITON PRODUCTION SUMMARY

QUARTER ENDED

QUARTER ENDED

% CHANGE

SEPT Q01

SEPT Q01

SEPT

JUNE

SEPT

SEPT

SEPT

vs

vs

2000

2001

2001

2001

2000

SEPT Q00

JUNE Q01

ALUMINIUM

Alumina

('000 tonnes)

539

998

964

964

539

79%

-3%

Aluminium

('000 tonnes)

233

250

244

244

233

5%

-2%

BASE METALS

Copper

('000 tonnes)

212.3

253.6

202.0

202.0

212.3

-5%

-20%

Lead

(tonnes)

52,944

55,757

54,074

54,074

52,944

2%

-3%

Zinc

(tonnes)

29,512

30,543

29,462

29,462

29,512

0%

-4%

Gold

(ounces)

175,039

192,580

69,954

69,954

175,039

-60%

-64%

Silver

('000 ounces)

8,075

8,064

8,183

8,183

8,075

1%

1%

Molybdenum

('000 tonnes)

-

0.1

0.1

0.1

-

na

-18%

CARBON STEEL MATERIALS

Iron ore

('000 tonnes)

17,280

17,074

17,080

17,080

17,280

-1%

0%

Metallurgical coal

('000 tonnes)

7,964

10,802

8,365

8,365

7,964

5%

-23%

Manganese ores

('000 tonnes)

1,024

936

973

973

1,024

-5%

4%

Manganese alloys

('000 tonnes)

175

136

119

119

175

-32%

-13%

Hot briquetted iron

('000 tonnes)

105

276

386

386

105

268%

40%

STAINLESS STEEL MATERIALS

Nickel

('000 tonnes)

12.8

16.8

15.9

15.9

12.8

24%

-5%

Chrome ores

('000 tonnes)

921

665

629

629

921

-32%

-5%

Ferrochrome

('000 tonnes)

273

194

207

207

273

-24%

7%

ENERGY COAL

('000 tonnes)

20,842

23,134

22,405

22,405

20,842

7%

-3%

PETROLEUM

Crude oil and condensate

('000 bbl)

20,817

18,378

19,492

19,492

20,817

-6%

6%

Natural gas

(bcf)

61.75

71.64

71.24

71.24

61.75

15%

-1%

LPG

('000 tonnes)

172.77

175.60

182.71

182.71

172.77

6%

4%

Ethane

('000 tonnes)

23.19

18.53

24.05

24.05

23.19

4%

30%

BHP STEEL

Raw steel

('000 tonnes)

1,455

1,328

1,382

1,382

1,455

-5%

4%

Marketable steel products

('000 tonnes)

1,425

1,469

1,377

1,377

1,425

-3%

-6%

EXPLOR'N, TECH & NEW BUS

Diamonds

('000 carats)

309

427

767

767

309

148%

80%

BHP BILLITON ATTRIBUTABLE PRODUCTION

QUARTER ENDED

QUARTER ENDED

BHP Billiton

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

Interest

2000

2000

2001

2001

2001

2001

2000

ALUMINIUM

ALUMINA

Production ('000 tonnes)

Worsley (a)

86%

206

211

541

674

662

662

206

Suriname

45%

213

215

213

211

219

219

213

Alumar

36%

120

107

114

113

83

83

120

Total

539

533

868

998

964

964

539

ALUMINIUM

Production ('000 tonnes)

Hillside

100%

126

127

122

123

125

125

126

Bayside

100%

46

45

44

43

44

44

46

Alumar

46.3%

43

44

42

43

35

35

43

Valesul

45.5%

11

12

11

9

8

8

11

Mozal (b)

47%

7

23

31

32

32

32

7

Total

233

251

250

250

244

244

233

BASE METALS (c)

COPPER

Payable metal ('000 tonnes)

Escondida

57.5%

109.5

105.8

98.3

89.1

89.3

89.3

109.5

Ok Tedi (d)

52%

49.8

54.1

51.7

53.4

-

-

49.8

Tintaya

100%

22.5

24.0

18.4

20.1

20.9

20.9

22.5

Alumbrera (e)

25%

-

9.9

10.8

11.9

11.6

11.6

-

Highland Valley (e)

33.6%

-

16.0

14.8

14.1

16.1

16.1

-

Selbaie

100%

3.4

3.2

3.3

2.8

2.5

2.5

3.4

Total

185.2

213.0

197.3

191.4

140.4

140.4

185.2

Refined production ('000 tonnes)

Escondida

57.5%

20.0

20.5

21.0

22.0

21.9

21.9

20.0

Cerro Colorado (e)

100%

-

31.0

32.0

34.0

34.0

34.0

-

San Manuel

100%

2.8

2.7

2.5

2.3

2.3

2.3

2.8

Pinto Valley

100%

4.3

4.4

4.0

3.8

3.4

3.4

4.3

Total

27.1

58.6

59.5

62.2

61.6

61.6

27.1

LEAD

Payable metal (tonnes)

Cannington

100%

51,328

49,503

45,228

54,271

52,879

52,879

51,328

Pering

100%

1,616

1,601

1,321

1,486

1,195

1,195

1,616

Total

52,944

51,104

46,549

55,757

54,074

54,074

52,944

ZINC

Payable metal (tonnes)

Cannington

100%

13,148

17,994

15,877

17,176

14,058

14,058

13,148

Selbaie

100%

11,359

10,812

8,868

7,969

9,456

9,456

11,359

Pering

100%

5,005

5,499

5,010

5,398

5,948

5,948

5,005

Total

29,512

34,305

29,755

30,543

29,462

29,462

29,512

Refer footnotes on page 5.

BASE METALS (continued)

GOLD

Payable concentrate (ounces)

Ok Tedi (d)

52%

140,748

127,049

115,576

124,729

-

-

140,748

Escondida

57.5%

15,443

13,270

10,582

10,302

10,641

10,641

15,443

Tintaya

100%

6,947

4,638

5,146

7,693

10,249

10,249

6,947

Alumbrera (e)

25%

-

31,555

31,949

41,658

42,857

42,857

-

Selbaie

100%

11,901

9,344

8,472

8,198

6,207

6,207

11,901

Total

175,039

185,856

171,725

192,580

69,954

69,954

175,039

SILVER

Payable metal ('000 ounces)

Cannington

100%

7,629

7,591

6,462

7,806

7,804

7,804

7,629

Selbaie

100%

446

469

362

258

379

379

446

Total

8,075

8,060

6,824

8,064

8,183

8,183

8,075

MOLYBDENUM

Payable metal ('000 tonnes)

Highland Valley (e)

33.6%

-

0.1

0.1

0.1

0.1

0.1

-

CARBON STEEL MATERIALS

IRON ORE

Production ('000 tonnes)

Mt Newman Joint Venture

85%

5,620

5,500

4,591

5,239

5,973

5,973

5,620

Goldsworthy Joint Venture

85%

1,630

1,730

1,453

1,788

1,656

1,656

1,630

Yandi Joint Venture

85%

7,080

5,840

6,354

6,882

7,046

7,046

7,080

Jimblebar

100%

1,130

1,250

991

1,272

1,182

1,182

1,130

Samarco

50%

1,820

1,910

1,885

1,893

1,223

1,223

1,820

Total

17,280

16,230

15,274

17,074

17,080

17,080

17,280

METALLURGICAL COAL (f)

Production ('000 tonnes)

CQCA Joint Venture (g)

50%

3,961

3,794

3,519

4,064

4,002

4,002

3,961

Gregory Joint Venture (g)

50%

851

970

845

960

486

486

851

BHP Mitsui Coal (h)

80%

1,414

1,525

1,678

1,802

1,823

1,823

1,414

QCT Resources (i)

50%

-

1,260

1,837

2,087

-

-

-

Illawarra

100%

1,738

1,328

1,619

1,889

2,055

2,055

1,738

Total

7,964

8,877

9,498

10,802

8,365

8,365

7,964

MANGANESE ORES

Saleable production ('000 tonnes)

South Africa (j)

60%

555

579

538

490

467

467

555

Australia (j)

60%

469

318

379

446

505

505

469

Total

1,024

897

917

936

973

973

1,024

MANGANESE ALLOYS

Saleable production ('000 tonnes)

South Africa (j)

60%

111

106

96

85

69

69

111

Australia (j)

60%

64

67

64

51

50

50

64

Total

175

173

160

136

119

119

175

Refer footnotes on page 5.

CARBON STEEL MATERIALS (cont'd)

HOT BRIQUETTED IRON

Production ('000 tonnes)

Boodarie Iron™

100%

105

291

177

276

386

386

105

STAINLESS STEEL MATERIALS

NICKEL

Production ('000 tonnes)

CMSA

99.8%

6.4

6.9

9.4

9.1

9.6

9.6

6.4

Yabulu

100%

6.4

7.5

7.4

7.7

6.3

6.3

6.4

Total

12.8

14.4

16.8

16.8

15.9

15.9

12.8

CHROME ORES

Saleable production ('000 tonnes)

South Africa (j)

60%

921

898

674

665

629

#

629

921

FERROCHROME

Saleable production ('000 tonnes)

South Africa (j)

60%

273

249

192

194

207

207

273

ENERGY COAL

Production ('000 tonnes)

South Africa

100%

14,561

17,811

14,379

14,571

14,538

14,538

14,561

USA

100%

3,080

3,962

3,993

3,890

3,106

3,106

3,080

Australia

100%

1,235

1,227

1,512

1,329

1,173

1,173

1,235

Indonesia (l)

80%

1,966

2,134

2,035

2,291

2,450

2,450

1,966

Colombia (m)

16%-33%

-

687

1,091

1,053

1,138

1,138

-

Total

20,842

25,821

23,010

23,134

22,405

22,405

20,842

PETROLEUM

Production

Crude oil & condensate

(000 bbl)

20,817

20,000

19,911

18,378

19,492

19,492

20,817

Natural gas

(bcf)

61.75

60.83

67.61

71.64

71.24

71.24

61.75

LPG

('000 tonnes)

172.77

155.04

170.62

175.60

182.71

182.71

172.77

Ethane

('000 tonnes)

23.19

9.98

15.69

18.53

24.05

24.05

23.19

BHP STEEL

Production ('000 tonnes)

Raw steel

100%

1,455

1,372

1,277

1,328

1,382

1,382

1,455

Marketable steel products

100%

1,425

1,268

1,345

1,469

1,377

1,377

1,425

Refer footnotes on page 5.

EXPLORATION, TECH & NEW BUSINESS

DIAMONDS

Production ('000 carats)

Ekati™ (n)

80%

309

318

375

427

767

767

309

(a) Interest in Worsley increased from 30% to 86% effective January 2001.

(b) Mozal produced its first metal in June 2000 and achieved full commissioning of its 253,000 tpa capacity in December 2000.

(c) BHP Billiton Base Metals has adopted payable metal as its production reporting basis effective this quarterly report. Prior

period mine production figures have been restated from the previous basis of metal contained in concentrate.

(d) Shown on 100% basis. BHP Billiton holds a 52% equity interest in Ok Tedi. BHP Billiton announced in August 2001 that no

profit would be recognised for Ok Tedi from 1 July 2001 onwards except to the extent that dividends are received.

Accordingly, Ok Tedi September 2001 quarter production (100% basis) of 48,200 tonnes of copper and 104,855 ounces of gold

has not been recognised in this quarterly report.

(e) Included from 1 October 2000, the effective date of the acquisition of Rio Algom.

(f) Coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(g) BHP Billiton interest is 50% from 28 June 2001 (previously CQCA joint venture 52.1% and Gregory joint venture 64.14%).

(h) Shown on 100% basis before 20% outside equity interest.

(i) Production reported represents BHP Billiton's 50% equity interest in MetCoal Holdings. MetCoal Holdings is equally owned by

BHP Billiton and Mitsubishi Development Pty Ltd and acquired QCT Resources Limited in November 2000. In June 2001,

Mitsubishi acquired the balance of the shares in QCT from BHP Billiton.

(j) Shown on 100% basis. BHP Billiton interest in saleable production is 60%.

(k) BHP Billiton ceased its investment in Orinoco in March 2001.

(l) Production shown on 86.5% basis after allowing for Indonesian state owned corporation's 13.5% share of production.

(m) Colombian thermal coal interests acquired in September and November 2000.

(n) Interest in Ekati™ increased from 51% to 80% effective July 2001.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

ALUMINIUM

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

ALUMINA

Production

Worsley, Australia (a)

206

211

541

674

662

662

206

Paranam, Suriname

213

215

213

211

219

219

213

Alumar, Brazil

120

107

114

113

83

83

120

Total

539

533

868

998

964

964

539

Sales

Worsley, Australia (a)

185

205

388

725

692

692

185

Paranam, Suriname

214

194

224

186

224

224

214

Alumar, Brazil

110

116

120

116

79

79

110

Total

509

515

732

1,027

995

995

509

(a) Interest in Worsley increased from 30% to 86% effective January 2001.

ALUMINIUM

Production

Hillside, South Africa

126

127

122

123

125

125

126

Bayside, South Africa

46

45

44

43

44

44

46

Alumar, Brazil

43

44

42

43

35

35

43

Valesul, Brazil

11

12

11

9

8

8

11

Mozal, Mozambique (b)

7

23

31

32

32

32

7

Total

233

251

250

250

244

244

233

Sales

Hillside, South Africa

126

127

121

124

123

123

126

Bayside, South Africa

41

46

42

50

43

43

41

Alumar, Brazil

42

43

41

45

34

34

42

Valesul, Brazil

11

11

7

12

8

8

11

Mozal, Mozambique (b)

5

20

32

33

32

32

5

Total

225

247

243

264

240

240

225

(b) Mozal produced its first metal in June 2000 and achieved full commissioning of its 253,000 tpa capacity in December 2000.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

BASE METALS

BHP Billiton attributable production and sales unless otherwise stated. Metals production is payable metal unless otherwise stated.

Escondida, Chile

Material mined (100%)

('000 tonnes)

75,557

77,436

74,691

77,115

85,344

85,344

75,557

Sulphide ore milled (100%)

('000 tonnes)

12,358

11,534

11,128

10,650

11,205

11,205

12,358

Average copper grade

(%)

1.85%

1.94%

1.95%

1.82%

1.75%

1.75%

1.85%

Production ex Mill (100%)

('000 tonnes)

199.5

190.4

176.4

159.5

162.0

162.0

199.5

Production

Payable copper

('000 tonnes)

109.5

105.8

98.3

89.1

89.3

89.3

109.5

Payable gold concentrate

(fine ounces)

15,443

13,270

10,582

10,302

10,641

10,641

15,443

Copper cathode (SXEW)

('000 tonnes)

20.0

20.5

21.0

22.0

21.9

21.9

20.0

Sales

Payable copper

('000 tonnes)

84.6

118.0

109.5

88.3

83.8

83.8

84.6

Payable gold concentrate

(fine ounces)

12,272

15,279

11,692

9,780

8,729

8,729

12,272

Copper cathode (SXEW)

('000 tonnes)

22.1

19.8

21.8

23.1

22.9

22.9

22.1

OK Tedi, Papua New Guinea (a)

Material mined

('000 tonnes)

22,299

22,673

22,244

22,482

-

-

22,299

Ore milled

('000 tonnes)

7,371

8,286

8,250

8,116

-

-

7,371

Average head grades

- Copper

(%)

0.93%

0.91%

0.85%

0.92%

-

-

0.93%

- Gold

(g/t)

0.99

0.77

0.70

0.82

-

-

0.99

Production

Payable copper

('000 tonnes)

49.8

54.1

51.7

53.4

-

-

49.8

Payable gold concentrate

(fine ounces)

140,748

127,049

115,576

124,729

-

-

140,748

Sales

Payable copper

('000 tonnes)

36.2

53.5

53.4

67.5

-

-

36.2

Payable gold concentrate

(fine ounces)

100,481

135,494

113,760

156,860

-

-

100,481

(a) Ok Tedi data shown on 100% basis. BHP Billiton holds a 52% equity interest in Ok Tedi. BHP Billiton announced in August 2001

that no profit would be recognised for Ok Tedi from 1 July 2001 except to the extent that dividends are received.

Accordingly, Ok Tedi September 2001 quarter production (100% basis) of 48,200 tonnes of copper and 104,855 ounces of gold

has not been recognised in this quarterly report.

Tintaya, Peru

Material mined

('000 tonnes)

16,394

16,723

14,566

16,447

17,600

17,600

16,394

Ore milled

('000 tonnes)

1,620

1,744

1,429

1,508

1,640

1,640

1,620

Average copper grade

(%)

1.56%

1.56%

1.47%

1.56%

1.58%

1.58%

1.56%

Production

Payable copper

('000 tonnes)

22.5

24.0

18.4

20.1

20.9

20.9

22.5

Payable gold concentrate

(fine ounces)

6,947

4,638

5,146

7,693

10,249

10,249

6,947

Sales

Payable copper

('000 tonnes)

17.6

24.5

12.1

32.0

19.2

19.2

17.6

Payable gold concentrate

(fine ounces)

7,794

5,149

3,125

10,350

9,745

9,745

7,794

Cerro Colorado, Chile (a)

Material mined

('000 tonnes)

-

14,957

13,342

14,177

13,595

13,595

-

Ore milled

('000 tonnes)

-

3,264

3,479

3,546

3,516

3,516

-

Average copper grade

(%)

-

1.08%

1.09%

1.09%

1.06%

1.06%

-

Production

Copper cathode

('000 tonnes)

-

31

32

34

34

34

-

Sales

Copper cathode

('000 tonnes)

-

30

33

34

34

34

-

(a) Cerro Colorado (BHP Billiton 100%) included from 1 October 2000, the effective date of the acquisition of Rio Algom.

Alumbrera, Argentina (a)

Material mined (100%)

('000 tonnes)

-

27,823

25,829

27,182

29,545

29,545

-

Ore milled (100%)

('000 tonnes)

-

7,097

7,041

7,445

7,516

7,516

-

Average head grades

- Copper

(%)

-

0.64%

0.71%

0.74%

0.70%

0.70%

-

- Gold

(g/t)

-

0.8

0.8

1.0

1.0

1.0

-

Production

Payable copper

('000 tonnes)

-

9.9

10.8

11.9

11.6

11.6

-

Payable gold

(fine ounces)

-

30,094

30,579

39,921

40,653

40,653

-

Payable gold - dore

(fine ounces)

-

1,461

1,370

1,737

2,204

2,204

-

Sales

Payable copper

('000 tonnes)

-

8.4

9.5

14.2

10.0

10.0

-

Payable gold

(fine ounces)

-

26,819

27,635

45,999

34,461

34,461

-

Payable gold - dore

(fine ounces)

-

1,907

1,933

2,137

2,009

2,009

-

(a) Alumbrera (BHP Billiton 25%) included from 1 October 2000, the effective date of the acquisition of Rio Algom.

Highland Valley, Canada (a)

Material mined (100%)

('000 tonnes)

-

21,203

19,104

18,988

19,910

19,910

-

Ore milled (100%)

('000 tonnes)

-

13,155

11,784

11,355

12,841

12,841

-

Average copper grade

(%)

-

0.42%

0.43%

0.43%

0.43%

0.43%

-

Production

Payable copper

('000 tonnes)

-

16.0

14.8

14.1

16.1

16.1

-

Payable Molybdenum

('000 tonnes)

-

0.14

0.12

0.12

0.10

0.10

-

Sales

Payable copper

('000 tonnes)

-

10.5

10.5

11.9

17.0

17.0

-

Payable Molybdenum

('000 tonnes)

-

0.21

0.17

0.14

0.09

0.09

-

(a) Highland Valley (BHP Billiton 33.6%) included from 1 October 2000, the effective date of the acquisition of Rio Algom.

Cannington, Australia

Material mined

('000 tonnes)

430

460

464

507

543

543

430

Ore milled

('000 tonnes)

408

461

422

490

496

496

408

Average head grades

- Silver

(g/t)

653

615

539

577

606

606

653

- Lead

(%)

14.5%

14.0%

13.0%

13.2%

13.0%

13.0%

14.5%

- Zinc

(%)

5.1%

6.0%

6.0%

5.5%

4.5%

4.5%

5.1%

Production

Payable silver

('000 ounces)

7,629

7,591

6,462

7,806

7,804

7,804

7,629

Payable lead

(tonnes)

51,328

49,503

45,228

54,271

52,879

52,879

51,328

Payable zinc

(tonnes)

13,148

17,994

15,877

17,176

14,058

14,058

13,148

Sales

Payable silver

('000 ounces)

6,988

6,583

8,107

8,681

7,231

7,231

6,988

Payable lead

(tonnes)

46,079

43,036

55,949

61,243

49,423

49,423

46,079

Payable zinc

(tonnes)

11,681

13,262

20,588

17,496

13,220

13,220

11,681

Selbaie, Canada

Ore milled

('000 tonnes)

327

1,884

902

896

534

534

327

Average head grades

- Zinc

(%)

1.61%

1.55%

1.58%

1.42%

1.51%

1.51%

1.61%

- Copper

(%)

0.45%

0.43%

0.46%

0.42%

0.34%

0.34%

0.45%

- Gold

(g/t)

0.51

0.49

0.46

0.45

0.34

0.34

0.51

- Silver

(g/t)

22.66

29.03

25.00

18.14

25.00

25.00

22.66

Production

Payable zinc

(tonnes)

11,359

10,812

8,868

7,969

9,456

9,456

11,359

Payable copper

(tonnes)

3,390

3,183

3,286

2,841

2,470

2,470

3,390

Payable gold concentrate

(ounces)

11,901

9,344

8,472

8,198

6,207

6,207

11,901

Payable silver

('000 ounces)

446

469

362

258

379

379

446

Sales

Payable zinc

(tonnes)

9,383

9,786

9,109

8,406

9,959

9,959

9,383

Payable copper

(tonnes)

2,983

3,385

3,258

3,039

3,197

3,197

2,983

Payable gold concentrate

(ounces)

6,283

11,776

10,178

8,207

8,112

8,112

6,283

Payable silver

('000 ounces)

535

494

445

405

283

283

535

Pering, South Africa

Ore milled

('000 tonnes)

336

336

327

345

339

339

336

Average head grades

- Zinc

(%)

2.03%

2.22%

2.03%

2.09%

2.02%

2.02%

2.03%

- Lead

(%)

0.68%

0.68%

0.55%

0.60%

0.49%

0.49%

0.68%

Production

Payable zinc

(tonnes)

5,005

5,499

5,010

5,398

5,948

5,948

5,005

Payable lead

(tonnes)

1,616

1,601

1,321

1,486

1,195

1,195

1,616

Sales

Payable zinc

(tonnes)

4,927

4,988

5,171

5,063

4,932

4,932

4,927

Payable lead

(tonnes)

1,702

1,246

1,587

1,493

1,366

1,366

1,702

San Manuel, USA

Production

Copper cathode (SXEW)

('000 tonnes)

2.8

2.7

2.5

2.3

2.3

2.3

2.8

Pinto Valley, USA

Production

Copper cathode (SXEW)

('000 tonnes)

4.3

4.4

4.0

3.8

3.4

3.4

4.3

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

CARBON STEEL MATERIALS

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

IRON ORE (a)

Pilbara, Western Australia

Production

Mt Newman Joint Venture

5,620

5,500

4,591

5,239

5,973

5,973

5,620

Goldsworthy Joint Venture

1,630

1,730

1,453

1,788

1,656

1,656

1,630

Yandi Joint Venture

7,080

5,840

6,354

6,882

7,046

7,046

7,080

Jimblebar

1,130

1,250

991

1,272

1,182

1,182

1,130

Total

15,460

14,320

13,389

15,181

15,858

15,858

15,460

Shipments

Lump

3,940

3,730

3,950

3,823

3,729

3,729

3,940

Fines

11,040

11,400

11,171

11,545

12,334

12,334

11,040

Total

14,980

15,130

15,121

15,368

16,063

16,063

14,980

(a) Iron ore production and shipments are reported on a wet tonnes basis.

Samarco, Brazil

Production

1,820

1,910

1,885

1,893

1,223

1,223

1,820

Shipments

1,670

2,150

1,699

1,460

1,156

1,156

1,670

METALLURGICAL COAL (a)

Queensland, Australia

Production

CQCA Joint Venture (b)

Blackwater

1,056

1,076

1,066

1,130

977

977

1,056

Goonyella

924

965

967

1,122

986

986

924

Peak Downs

893

886

571

779

885

885

893

Saraji

608

433

504

530

627

627

608

Norwich Park

480

434

411

503

527

527

480

CQCA total

3,961

3,794

3,519

4,064

4,002

4,002

3,961

Gregory Joint Venture (b)

851

970

845

960

486

486

851

BHP Mitsui Coal (c)

Riverside

745

727

834

966

917

917

745

South Walker Creek

669

798

844

836

906

906

669

BHP Mitsui Coal total

1,414

1,525

1,678

1,802

1,823

1,823

1,414

Queensland total

6,226

6,289

6,042

6,826

6,311

6,311

6,226

Shipments

Coking coal

4,554

4,669

4,401

4,813

4,462

4,462

4,554

Weak coking coal

1,065

1,466

1,138

1,245

1,319

1,319

1,065

Thermal coal

633

657

474

624

544

544

633

Total

6,252

6,792

6,013

6,682

6,325

6,325

6,252

(a) Coal production is reported on the basis of saleable product. Production figures include some thermal coal.

(b) BHP Billiton interest is 50% from 28 June 2001 (previously CQCA joint venture 52.1% and Gregory joint venture 64.14%).

(c) BHP Mitsui Coal production shown on 100% basis before 20% outside equity interest.

QCT Resources, Australia (a)

Production

CQCA

-

732

1,093

1,263

-

-

-

Gregory Joint Venture

-

173

213

242

-

-

-

South Blackwater

-

355

531

582

-

-

-

Total

-

1,260

1,837

2,087

-

-

-

Shipments

Coking coal

-

876

1,633

1,476

-

-

-

Weak coking coal

-

146

227

231

-

-

-

Thermal coal

-

245

209

268

-

-

-

Total

-

1,267

2,069

1,975

-

-

-

(a) Production and shipments reported represents BHP Billiton's 50% equity interest in MetCoal Holdings. MetCoal Holdings is

equally owned by BHP Billiton and Mitsubishi Development Pty Ltd and acquired QCT Resources Limited in November 2000.

In June 2001, Mitsubishi acquired the balance of the shares in QCT from BHP Billiton.

Illawarra, Australia

Production

1,738

1,328

1,619

1,889

2,055

2,055

1,738

Shipments

Coking coal

1,326

1,512

1,410

1,686

1,457

1,457

1,326

Thermal coal

128

165

67

246

136

136

128

Total

1,454

1,677

1,477

1,932

1,593

1,593

1,454

MANGANESE ORES

South Africa

Saleable production (a)

555

579

538

490

467

467

555

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

Australia

Saleable production (a)

469

318

379

446

505

505

469

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

MANGANESE ALLOYS

South Africa

Saleable production (a)

111

106

96

85

69

69

111

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

Australia

Saleable production (a)

64

67

64

51

50

50

64

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

HOT BRIQUETTED IRON

Boodarie Iron™, Australia

Production

105

291

177

276

386

386

105

Shipments

54

107

238

342

358

358

54

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

STAINLESS STEEL MATERIALS

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

NICKEL

CMSA, Colombia

Production

6.4

6.9

9.4

9.1

9.6

9.6

6.4

Sales

6.4

5.5

8.8

10.2

9.1

9.1

6.4

Yabulu, Australia

Production

Nickel

6.4

7.5

7.4

7.7

6.3

6.3

6.4

Cobalt

0.4

0.4

0.5

0.5

0.4

0.4

0.4

Sales

Nickel

6.3

6.3

6.5

8.2

7.7

7.7

6.3

Cobalt

0.4

0.4

0.4

0.4

0.4

0.4

0.4

CHROME ORES

South Africa

Saleable production (a)

921

898

674

665

629

629

921

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

FERROCHROME

South Africa

Saleable production (a)

273

249

192

194

207

207

273

(a) Shown on 100% basis, BHP Billiton interest in saleable production is 60%.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

ENERGY COAL

BHP Billiton attributable production and sales unless otherwise stated.

('000 tonnes)

Ingwe, South Africa

Production

14,561

17,811

14,379

14,571

14,538

14,538

14,561

Sales

Export

6,569

6,489

6,164

6,557

6,289

6,289

6,569

Local utility

7,098

10,273

6,957

6,821

7,477

7,477

7,098

Inland

1,217

1,473

1,207

1,110

1,092

1,092

1,217

Total

14,884

18,235

14,328

14,488

14,858

14,858

14,884

New Mexico, USA

Production

Navajo Coal

1,544

2,119

1,838

2,170

1,694

1,694

1,544

San Juan Coal

1,536

1,843

2,155

1,720

1,412

1,412

1,536

Total

3,080

3,962

3,993

3,890

3,106

3,106

3,080

Sales - local utility

3,785

3,565

3,566

3,434

3,407

3,407

3,785

COAL, Australia

Production

1,235

1,227

1,512

1,329

1,173

1,173

1,235

Sales

Export

949

685

1,190

1,201

604

604

949

Inland

392

235

396

399

398

398

392

Total

1,341

920

1,586

1,600

1,002

1,002

1,341

Kalimantan, Indonesia (a)

Production

Senakin

905

1,050

924

1,099

1,161

1,161

905

Satui

818

871

926

981

1,068

1,068

818

Petangis

243

213

185

211

221

221

243

Total

1,966

2,134

2,035

2,291

2,450

2,450

1,966

Sales - export

2,075

2,049

1,942

2,308

2,312

2,312

2,075

(a) Reported on 86.5% basis after allowing for the Indonesian state-owned corporation's 13.5% share of all production.

CDC & CZN, Colombia (a)

Production

-

687

1,091

1,053

1,138

1,138

-

Sales - export

-

676

1,102

959

1,098

1,098

-

(a) BHP Billiton acquired a one third interest in CDC in September 2000. A consortium owned equally by BHP Billiton, Anglo

American and Glencore International acquired a 50% interest in CZN in November 2000.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

PETROLEUM

BHP Billiton attributable production unless otherwise stated.

CRUDE OIL & CONDENSATE ('000 barrels)

Bass Strait

7,804

7,096

6,990

6,946

7,387

7,387

7,804

North West Shelf - condensate

1,225

1,144

1,240

1,239

1,331

1,331

1,225

North West Shelf - Wanaea/Cossack

1,682

1,885

1,820

1,757

1,652

1,652

1,682

Laminaria

4,369

3,875

3,533

3,076

3,001

3,001

4,369

Buffalo (a)

757

763

-

-

-

-

757

Griffin

1,991

1,714

2,241

1,194

1,037

1,037

1,991

Pakistan (b)

-

-

3

14

17

17

-

Typhoon (c)

-

-

-

-

835

835

-

Americas

826

944

941

958

918

918

826

Liverpool Bay

1,716

1,978

2,469

2,516

2,830

2,830

1,716

Bruce/Keith (d)

447

601

674

678

483

483

447

Total

20,817

20,000

19,911

18,378

19,492

19,492

20,817

NATURAL GAS (billion cubic feet)

Bass Strait

27.78

18.96

22.91

26.75

30.05

30.05

27.78

North West Shelf - Domestic

3.13

3.28

3.29

3.81

3.68

3.68

3.13

North West Shelf - LNG

15.19

13.83

14.24

13.47

15.76

15.76

15.19

Griffin

0.75

0.82

0.73

0.84

1.35

1.35

0.75

Pakistan (b)

-

-

0.40

2.03

2.66

2.66

-

Typhoon (c)

-

-

-

-

0.67

0.67

-

Americas

5.21

5.38

5.19

5.52

5.41

5.41

5.21

Bruce

5.01

9.38

10.43

7.59

3.28

3.28

5.01

Keith (d)

-

0.11

0.24

0.25

0.19

0.19

-

Liverpool Bay

4.68

9.07

10.18

11.38

8.19

8.19

4.68

Total

61.75

60.83

67.61

71.64

71.24

71.24

61.75

LPG ('000 tonnes)

Bass Strait

128.15

95.70

113.21

117.66

128.52

128.52

128.15

North West Shelf

31.48

30.69

30.44

31.65

36.32

36.32

31.48

Griffin

1.57

1.50

0.51

-

-

-

1.57

Bruce

11.57

26.72

23.01

24.85

16.51

16.51

11.57

Keith (d)

-

0.43

3.45

1.44

1.36

1.36

-

Total

172.77

155.04

170.62

175.60

182.71

182.71

172.77

ETHANE ('000 tonnes)

23.19

9.98

15.69

18.53

24.05

24.05

23.19

(a) Buffalo sold effective September 2000.

(b) Zamzama extended well test commenced in March 2001.

(c) Typhoon commenced production in July 2001.

(d) Keith commenced production in November 2000.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

BHP STEEL

BHP Billiton attributable production unless otherwise stated.

('000 tonnes)

PRODUCTION

Iron Sands

NZS, New Zealand

723

712

274

478

397

397

723

Coke

Port Kembla, Australia

616

599

578

643

661

661

616

Iron

Port Kembla, Australia

1,298

1,231

1,177

1,269

1,262

1,262

1,298

Raw Steel

Port Kembla, Australia

1,308

1,226

1,120

1,176

1,238

1,238

1,308

NZS, New Zealand

147

146

157

152

144

144

147

Total

1,455

1,372

1,277

1,328

1,382

1,382

1,455

Delta, Ohio (a)

193

186

190

197

196

196

193

Marketable Steel Products

Flat Products

Flat and Tinplate products

1,242

1,152

1,094

1,183

1,183

1,183

1,242

Coated Products

Rolled and coated products

531

464

462

474

533

533

531

Flat and coated products (NZS)

137

125

139

135

137

137

137

Rolled and coated products (offshore)

70

98

81

89

69

69

70

Building products (includes offshore)

40

34

42

42

40

40

40

Total (b)

1,425

1,268

1,345

1,469

1,377

1,377

1,425

Delta, Ohio (a)

189

182

186

193

192

192

189

DESPATCHES (c)

Business unit despatches

Flat Products

1,243

1,069

1,098

1,294

1,128

1,128

1,243

Coated Products

732

691

666

813

746

746

732

Total (d)

1,236

1,237

1,282

1,587

1,296

1,296

1,236

External despatches

Australia

Domestic (e)

485

503

515

585

691

691

485

Export

541

515

546

757

387

387

541

New Zealand

Domestic (e)

67

62

56

55

61

61

67

Export

68

55

77

97

83

83

68

Other offshore

75

102

88

93

74

74

75

Total

1,236

1,237

1,282

1,587

1,296

1,296

1,236

Delta, Ohio (a)

190

177

190

191

191

191

190

(a) Production and despatches reported is that proportion determined by BHP Steel's equity interest in North Star BHP LLC (50%).

(b) Total excludes production for intra-business sales. Therefore, the total figure is less than the sum of the individual businesses.

(c) Steel products only. Excludes pig iron and by-products.

(d) Total excludes intra-business sales. Therefore, the total figure is less than the sum of the individual businesses.

(e) Includes despatches to OneSteel Limited from 1 November 2000.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

EXPLORATION, TECHNOLOGY & NEW BUSINESS

BHP Billiton attributable production and sales unless otherwise stated.

DIAMONDS

Ekati™, Canada

Production (a)

('000 carats)

309

318

375

427

767

767

309

(a) Interest in Ekati™ increased from 51% to 80% effective July 2001.

PRODUCTION AND SHIPMENT REPORT

QUARTER ENDED

QUARTER ENDED

SEPT

DEC

MARCH

JUNE

SEPT

SEPT

SEPT

2000

2000

2001

2001

2001

2001

2000

STEEL - DISCONTINUED OPERATIONS (a)

BHP Billiton attributable production unless otherwise stated.

('000 tonnes)

PRODUCTION

Iron Ore

Whyalla, Australia

656

254

-

-

-

-

656

Coke

Whyalla, Australia

149

49

-

-

-

-

149

Iron

Whyalla, Australia

270

102

-

-

-

-

270

Raw Steel

Whyalla, Australia

245

99

-

-

-

-

245

Newcastle, Australia

-

-

-

-

-

-

-

Sydney, Australia

128

36

-

-

-

-

128

Total

373

135

-

-

-

-

373

Marketable Steel Products

Long products

551

171

-

-

-

-

551

Other offshore (USA) (b)

-

-

-

-

-

-

-

Total (b)

540

171

-

-

-

-

540

DESPATCHES (c)

Business unit despatches

Long Products

527

166

-

-

-

-

527

Other offshore (USA) (b)

-

-

-

-

-

-

-

Total (d)

527

166

-

-

-

-

527

External despatches

Australia

Domestic

482

150

-

-

-

-

482

Export

45

16

-

-

-

-

45

Other offshore (USA) (b)

-

-

-

-

-

-

-

Total

769

166

-

-

-

-

769

(a) Data tables reflect the spin-out of OneSteel Limited from BHP Billiton effective 31 October 2000.

(b) US steel businesses were sold in June 2000.

(c) Steel products only. Excludes pig iron and by-products.

(d) Total excludes intra-business sales. Therefore, the total figure is less than the sum of the individual businesses.