Sign In  |  Register  |  About Santa Clara  |  Contact Us

Santa Clara, CA
September 01, 2020 1:39pm
7-Day Forecast | Traffic
  • Search Hotels in Santa Clara

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Rio Tinto expresses its gratitude to search crews for locating missing capsule

Rio Tinto expresses its gratitude to the Western Australia’s Department of Fire and Emergency Services for coordinating the successful search effort to locate a missing capsule lost while in transit from the company’s Gudai-Darri iron ore mine in the Pilbara, Western Australia.

Rio Tinto would also like to thank the specialist search crews from the Australian Defence Force, the Australian Radiation Protection and Nuclear Safety Agency and the Australian Nuclear Science and Technology Organisation, as well as all other support agencies, for their crucial role in the search and recovery efforts.

Rio Tinto Iron Ore Chief Executive Simon Trott said, “We are incredibly grateful for the hard work of everyone involved in finding the missing capsule.

“While the recovery of the capsule is a great testament to the skill and tenacity of the search team, the fact is it should never have been lost in the first place. I’d like to apologise to the wider community of Western Australia for the concern it has generated.

“We are taking this incident very seriously and are undertaking a full and thorough investigation into how it happened.

“This sort of incident is extremely rare in our industry, which is why we need to investigate it thoroughly and learn what we can to ensure it doesn’t happen again. As part of our investigation, we will be assessing whether our processes and protocols, including the use of specialist contractors to package and transport radioactive materials, are appropriate.”

Notes to editors

The device involved is an industrial gauge which is commonly used in the mining industry. In this instance it was being used at our Gudai-Darri mine site to measure iron ore feed in the crushing circuit of the fixed plant.

The capsule is small (6mm diameter, 8mm long), round and stainless steel, and forms part of a level sensor (gauge) that is used in some fixed plant assets.

The gauge, packed by a specialist radioactive materials handler, was collected by a transport contractor from the Gudai-Darri mine site on 12 January.

Contacts

Please direct all enquiries to media.enquiries@riotinto.com

Media Relations, UK

Matthew Klar

M+ 44 7796 630 637

David Outhwaite

M +44 7787 597 493

Media Relations, Americas

Simon Letendre

M +514 796 4973

Malika Cherry

M +1 418 592 7293

Media Relations, Australia

Matt Chambers

M +61 433 525 739

Jesse Riseborough

M +61 436 653 412

Investor Relations, UK

Menno Sanderse

M: +44 7825 195 178

David Ovington

M +44 7920 010 978

Clare Peever

M +44 7788 967 877

Investor Relations, Australia

Tom Gallop

M +61 439 353 948

Amar Jambaa


M +61 472 865 948

Rio Tinto plc

6 St James’s Square

London SW1Y 4AD

United Kingdom

T +44 20 7781 2000

Registered in England

No. 719885

Rio Tinto Limited

Level 43, 120 Collins Street

Melbourne 3000

Australia

T +61 3 9283 3333

Registered in Australia

ABN 96 004 458 404

riotinto.com

Category: Pilbara

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 SantaClara.com & California Media Partners, LLC. All rights reserved.