Sign In  |  Register  |  About Santa Clara  |  Contact Us

Santa Clara, CA
September 01, 2020 1:39pm
7-Day Forecast | Traffic
  • Search Hotels in Santa Clara

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Ivanhoe Mines Files a New NI 43-101 Technical Report for the Ultra-High-Grade Kipushi Mine in the DRC

By: Newsfile

Kipushi, Democratic Republic of Congo--(Newsfile Corp. - March 4, 2022) - Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) announced today that the company has filed a new National Instrument 43-101 (NI 43-101) technical report covering the planned resumption of commercial production at the Kipushi Mine in the Democratic Republic of Congo.

The updated NI 43-101 technical report includes an independent feasibility study (Kipushi 2022 Feasibility Study) for the redevelopment of the Kipushi Mine and the mining of Kipushi's zinc-rich Big Zinc and Southern Zinc zones, with an estimated 11.8 million tonnes of Measured and Indicated Mineral Resources grading 35.3% zinc.

The Kipushi 2022 Feasibility Study was independently prepared on a 100%-project basis by OreWin Pty. Ltd., MSA Group (Pty.) Ltd., SRK Consulting (Pty) Ltd. and METC Engineering.

The technical report titled "Kipushi 2022 Feasibility Study Technical Report" has been filed on the SEDAR website at www.sedar.com and on the Ivanhoe Mines website at www.ivanhoemines.com.

Information contacts

Investors: Bill Trenaman +1.604.331.9834 / Media: Matthew Keevil +1.604. 558.1034

To view the source version of this press release, please visit https://www.newsfilecorp.com/release/115684

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 SantaClara.com & California Media Partners, LLC. All rights reserved.